Loading...
HomeMy WebLinkAbout4012 RESOLUTION NO. 4,012 A RESOLUTION AWARDING A CONTRACT FOR THE LITTLE ROCK PORT TRANSIT SHED, CONTRACT NO. 3; AND FOR OTHER PURPOSES. WHEREAS, invitation to bid was duly advertised and bids received pursuant thereto for the construction of the Little Rock Port Transit Shed, Contract No. 3 in accordance with plans and specifications prepared by Garver and Garver, Engineers, and on file in the office of the Purchasing Agent all in accordance with law; and WHEREAS, the lowest responsible and responsive bid received for said work is that of Rock Steel Building Company and it is the desire of the Board of Directors to award a contract to said bidder for said project. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS. SECTION 1 . A contract for the construction and erection of the Little Rock Port Transit Shed, Contract No. 3 in accordance with plans, specifications and bid proposal on file in the office of the Purchasing Agent is hereby awarded to Rock Steel Building Company on a unit price basis but not to exceed the sum of One Hundred Forty One Thousand Four Hundred Ninety Two and NO/100 Dollars ($141,492.00) and the Mayor and City Clerk are hereby authorized and directed to execute said contract for and on behalf of the City which shall be in form and substance as follows : P CONTRACT T.2 THIS AGREEMENT made this day of 19 by and between (a corporation organized and existing under the laws of the State of ) (a partnership consisting of ) (an individual trading as ) (Strike out the two terms not applicable) hereinafter called the "Contractor", and The City of Little Rock and Little Rock Port Authority, an agency thereof, hereinafter called the "Owner". WITNESSETH, that the Contractor and the Owner for the consideration stated herein mutually agree as follows: • J ARTICLE 1. Statement of Work. The Contractor shall furnish all super- ` vision, technical personnel, labor, materials, machinery, tools, equipment, .3 incidentals, and services, including utility and transportation services, and perform and complete all work required for the construction of Little Rock Port Transit Shed, Contract III, Little Rock, Arkansas, in strict accordance with the Contract Documents, including all Addenda thereto, numbered dated and dated as prepared by the Engineer. ARTICLE 2, The Contract Price, The Owner will pay the Contractor, be cause of his performance of the Contract, for the total quantities of work performed, the sum stated in the Base Bid of the Proposal (plus the additive sum for Alternate No. 1) (minus the deductive sum for Alternate No. 1) (draw line through non-applicable alternate sums) , subject to additions and deduct- ions as provided in GC-05, 'Changes in the Work' , of GENERAL CONDITIONS, ARTICLE 3. Contract Time. The Contractor agrees to begin work within ten (10) calendar days after issuance by the Owner of a "Work Order" or "Notice to Proceed" and to complete the work within 150 calendar clays there- :L.:: after. If the Contractor shall fail to complete the work within the time specified, he and his Surety shall be liable for payment to the Owner, as liquidated damages ascertained and agreed, and not in the nature of a penalty, the amount specified in GENERAL CONDITIONS of these contract documents for each day of delay. To the extent sufficient in amount, liquidated damages shall be deducted from the final payment to be made under this contract. C-1 r, t C W iiJ • ARTICLE 4. Contract, The executed contract documents shall consist of the following: a. This Agreement f. General Conditions b. Addenda g. Special Conditions Y�1 c. Notice to Contractors h. Technical Specifications d. Instructions to Bidders i, Drawings (as listed in the List • -) e. Proposal for Lump Sum of Plans) Contract. This Agreement, together with other documents enumerated in this ARTICLE 4, ,; which said other documents are as fully a part of the Contract as if hereto attached or herein repeated, form the Contract between the parties hereto, In the event that any provision in any component part of this Contract con- ' !Fa flicts with any provision of any other component part, the conflict shall be 0 resolved by the Engineer whose decision shall be final. In ARTICLE 5. Surety, The Surety on the Performance-Payment Bond shall be a surety company of financial resources satisfactory to the Owner and author- ized to do business in the State of Arkansas. IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed in five (5) counterparts, each of which shall be considered an ori- ginal, on the day and year first above written.rro ATTEST: R, (Contractor) +yyy+iiy JJ� By a Title (Street) (City) xti CITY OF LITTLE ROCK LITTLE ROCK PORT AUTHORITY (Owner) By (City Cleric) (Mayor) (Print or type the names underneath all signatures) a Ina :7 . , I ti -2- SECTION 2. Upon completion of the work provided for by the contract authorized in Section 1 hereof satisfying in all respects plans, specifications and bid proposal also identified, the City Manager and Director of Finance are hereby authorized and directed to issue the necessary warrant or warrants in payment of said contract price in accordance with the terms and conditions provided for by said contract. SECTION 3. This Resolution shall be in full force and effect from and after its adoption. ADOPTED: June 17, 1968 ATTEST: APPROVED: 6Q44aolti-- Pl .i3tA.sue,,✓ City Clerk Mayor