RESOLUTION NO. 3,653
A RESOLUTION ACCEPTING THE BID OF ARKANSAS-
LOUISIANA GAS COMPANY IN THE SUM OF $2,119. 84,
FOR CONSTRUCTION AND INSTALLATION OF AN AIR-
CONDITIONING AND HEATING SYSTEM IN THE PUBLIC
MEETING ROOM OF THE CLUBHOUSE AT WAR MEMORIAL
GOLF COURSE; AUTHORIZING EXECUTION OF A CON-
TRACT; AND FOR OTHER PURPOSES .
WHEREAS , invitation to bid was published for the con-
struction and installation of an air-conditioning and heating
system in the public meeting room of the clubhouse at War
Memorial Golf Course and bids received pursuant thereto accord-
ing to law; and
WHEREAS , the lowest responsible and responsive bid was
that of Arkansas-Louisiana Gas Company in the sum of Two
Thousand One Hundred Nineteen and 84/100 Dollars ($2, 119. 84) ;
and,
WHEREAS, it is the desire of the Board of Directors to
accept the bid of Arkansas-Louisiana Gas Company and to authorize
the execution of a contract for said project.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS
OF THE CITY OF LITTLE ROCK, ARKANSAS :
SECTION 1. The bid of Arkansas-Louisiana Gas Company in
the sum of Two Thousand One Hundred Nineteen and 84/100 Dollars
($2,119.84) for the installation of an air-conditioning and heat-
ing system in the public meeting room of the clubhouse at War
Memorial Golf Course is hereby accepted.
SECTION 2. The Mayor and City Clerk are hereby authorized
and directed to execute for and on behalf of the City of Little
Rock a contract with Arkansas-Louisiana Gas Company for the
performance of the work in keeping with specification therefore
consisting of two pages and plans consisting of one sheet on file
in the Office of the Director of Parks and Recreation, which con-
tract shall be in form and substance as follows :
C O N T R A C T
WITNESS this agreement made this 10th day of Nov.
1966 by and between the City of Little Rock, Arkansas, hereafter
called owner and
Ark. La. Gas Co.
400 East Capitol
Little Rock, Ark.
hereafter called CONTRACTOR, wherein the OWNER and CONTRACTOR,
for the considerations hereafter set forth , agree as follows :
Install Gas Fired Air Conditioning and Heating System in
Retired persons Association meeting room at War Memorial Golf
Clubhouse to comply with plans, specifications, addenda and
bid of October 28, 1966 .
ARTICLE I . SCOPE OF WORK
The CONTRACTOR shall furnish all of the materials and perform
all of the work shown on the drawings and designated in the
specifications entitled :
prepared by : J. N. Carner, Parks Department, City of Little Rock, Ark.
and shall do everything required by this Contract, the General
Conditions, Special Conditions, drawings, specifications and
other contract documents, if any .
ARTICLE 2 . TIME OF COMPLETION
The prosecution of the work by CONTRACTOR shall be commenced
within 5 days from issuance of a work order and the work
shall be completed within 30 consecutive days thereafter .
Liquidated damages shall be assessed against the CONTRACTOR
and deducted from final payment at the rate of $ None
per day for each day following the aforesaid date of completion
until the work shall have been completed. ( If no sum is shown
- 2 -
in this paragraph, there shall be no liquidated damages
applicable to work) . The amount of liquidated damages is
acknowledged by both parties as reasonable and is not in the
nature of a penalty .
ARTICLE 3 . CONTRACT SUM
OWNER shall pay to the CONTRACTOR for performance of the
Contract, subject to proper additions and deductions according
to the terms thereof, the following sum :
Two Thousand One Hundred Nineteen Dollars and Eighty Four Cents
($2,119 .84)
Where the quantities originally contemplated are so changed
that enforcement of the Contract sum upon either party shall
tend to create an inequity or hardship, there shall be an
equitable adjustment of the Contract sum to prevent any such
hardship . OWNER reserves the right to make changes in the
quantities required hereunder and any such changes shall
cause equitable adjustments of the Contract sum .
ARTICLE 4 . INTERIM AND PROGRESS PAYMENTS
OWNER shall make progress payments to the CONTRACTOR, or his
assigns, as follows;
None
- 3 -
ARTICLE 5 . ACCEPTANCE AND FINAL PAYMENT
Final payment shall be due CONTRACTOR 15 days after completion
of the work and acceptance thereof by the City Manager, Inspec-
tion and final approval by the City Manager, or his authorized
agents, shall be made immediately upon notice of completion by
CONTRACTOR and final approval shall not be arbitrarily or
unreasonably withheld.
Before issuance of final payment the CONTRACTOR shall submit
evidence satisfactory to the City Manager that all laborers,
materialmen, subcontractors and other creditors have been paid
or otherwise satisfied.
In the event of substantial completion of the work, though full
completion be temporarily impossible due to no fault of the
CONTRACTOR, the OWNER shall make payment for the work actually
performed, completed and accepted, and the contract shall not
be terminated .
ARTICLE 6 . CONTRACT DOCUMENTS
The General Conditions of the Contract, Special Conditions,
Plans, Specifications, bid proposal and this Contract shall
constitute the Contract Documents and are a part of this Contract
as if attached hereto and set forth in the body hereof. The
following by name constitute the Contract Documents .
Specifications consisting of 2 pages .
Plans consisting of 1 sheet.
IN WITNESS WHEREOF the parties hereto have executed this Contract
on the day and year aforesaid .
CITY OF LITTLE ROCK, ARKANSAS ( OWNER)
BY
ATTEST : Mayor
City Clerk Ark. La. Gas Company (CONTRACTOR)
BY
ATTEST : (President - Partner - Proprietor
Secretary
-2-
SECTION 3. The City Manager and Director of Finance
are hereby authorized and directed to issue the necessary warrant
or warrants in payment of the contract price hereinabove approved
in keeping with terms and conditions and provisions of the con-
tract herein set out.
SECTION 4. This Resolution shall be in full force and
effect from and after its adoption.
ADOPTED: November 7, 1966
ATTEST`1 14 APPROVED:
t
Y May r