HomeMy WebLinkAbout11864r ORDINANCE NO. 119864 AN ORDINANCE AWARDING A CONTRACT TO JAMES H. CONE, INC. FOR CONSTRUCTION OF FIRE STATION NO. 17 IN THE INDUSTRIAL AREA; APPROPRIATING THE SUM OF $60,000.00 FROM THE 1965 CAPITAL IMPROVEMENT CONSTRUCT- ION FUND; AUTHORIZING THE EXECUTION OF A CONTRACT; AND FOR OTHER PURPOSES. WHEREAS, invitation to bid was duly advertised and bids recieved pursuant thereto for Fire Station No. 17 according to plans and specifications prepared by Dan Cowling and Associates, Architects; and WHEREAS, the lowest responsible and responsive bid was that of James H. Cone, Inc. in the sum of Fifty Five Thousand and Two Hundred and Eighty Eight Dollars ($55,288.00); and WHEREAS, it is the desire of the Board of Directors to enter into a contract for said construction with James H. Cone, Inc. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS. SECTION 1. The bid of James H. Cone, Inc. in the sum of Fifty Five Thousand and Two Hundred and Eighty Eight Dollars ($55,288.00) for the construction of Fire Station No. 17 in accordance with plans and specifications prepared by Dan Cowling and Associates, Architects, is hereby accepted and the Mayor and the City Clerk are hereby authorized and directed to execute for and on behalf of the City a contract with said James H. Cone, Inc. for the performance of the work and the supplying of materials, which contract will be in form and substance as follows: .._ ..:..:.: ..': emu_ ..._.. .. .. .....:::.: �. J.; THE AMERICAN INSTITUTE OF ARCHITECTS l AIA Document A101 Stanaavid Form ®d A veeraent Between Owner and Contractor where the basis of payment is a STIPULATED SUM Use only with AIA Document A201, General Conditions of the Contract for Construction, Tenth Edition, dated Sept. 1966 AGREEMENT made this SIXTH (6th) day of APRIL Hundred and SIXTY SEVEN, BETWEEN THE CITY OF LITTLE ROCK, JAMES H. CONE, INC., The Owner and the Contractor agree as set forth below. AIA DOCUMENT A101 • OWNER- CONIRACfOR AGR[IMENF • SEPTE_h1UER 1966 EDITION AIA® @ THE AMERICAN INSTITUTE OF ARCHITECIS, 17.15 NEW YORK AVENUE, N.W., WASH., D.C. 20006 in the year of Nineteen the Owner, and the Contractor. ............... 1 ;i ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Suppiementary and other Conditions), Drawings, Specifications, all Addenda issued prior to execution of this Agreement and all Modifications issued subsequent thereto. These form the Contract, and all are as fully a part of the Contract as if attached to this Agreement or repeated herein. An enumeration of the Contract Documents appears in Article 8. ARTICLE 2 THE WORK The Contractor shall perform all the Work required by the Contract Documents for (Here insert the caption descriptive of the Work as used on other Contract Documents.) FIRE STATION NOS 17 DOYLS SPRINGS ROAD LITTLE ROCK, ARKANSAS ARTICLE 3 ARCHITECT The Architect for this Project is DAN COWLING AND ASSOCIATES, ARCHITECTS ARTICLE 4 TIME OF COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall be commenced upon written notice to proceed andcompleted within 120 consecutive calendar days, (Here insert any special provision, for liquidated damages relating to f,idure to complete on time.) As pointed out in Form of Bid, the bidder hereby agrees that the Owner may retain the sum of Fifty Dollars ($50,00 from the amount of compensation to be paid the undersigned for each day after the above mentioned completion date, Sundays and holidays included, that the work remains incomplete. This amount is agreed upon as the proper measure of liquidated damages which the Owner will sustain per day by the stipulated time, and is not to be construed in any sense as a penalty, AIA DOCUMENT A101 OWNER- CONERAC TOR AGREEMENT • SEF'rEM11ER 1966 EDITION AIAO (c) THE AMERICA N INSTIIUTr OF ARCHITFCIS, 1:35 NEW YORK AVENUE, N.W., WASH., D.C. 20006 2 jj: aQ: 1.. �3.:.:... �.. .,::::I.wi:- ..�.naur,.a:�As... a........un "��� .. ..�' yv..cwd.�_ b ;�8.1•� 3Yy`!'. -. �1 ,} .tF 1'`;1kwyF' ^ !T .., , ail l I i ARTICLE 5 CONTRACT SUM The Owner shall pay the Contractor for the performance of the Work, subject to additions and deductions by Change Order as provided in the Conditions of the Contract, in current funds, the Contract Sum of (State here the lump sum amount, unit prices, or both, as desired.) FIFTY -FIVE THOUSAND, TWO HUNDRED EIGHTY «EIGHT AND no /100 DOLLARS BASE BIDo „o o$55,288,00 ARTICLE 6 PROGRESS PAYMENTS Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as pro- vided in the Conditions of the Contract as follows: On or about the tenth (10th) day of each month ninety (90) per cent of the proportion of the Contract Sum properly allocable to labor, materials and equipment incorporated in the Work and ninety (90) per cent of the portion of the Contract Sum properly allocable to materials and equipment suitably stored at the site or at some other location agreed upon in writing by the parties, up to the twenty —fifth (25th day of that month, less the aggregate of previous payments in each case,- and upon Substantial Completion of the entire Work, a sum sufficient to increase the total payments to ninety (90) per cent of the Contract Sum, less such retainages as the Architect shall determine for all incomplete Work and unsettled claims. (Here insert any provisions made for limiting or reducing the amount retained after the Work reaches a certain stage of complelion.) AIA DOCUMENT A101 OWNI RCONIRACTOR AGRI TMENT • SEPTEMBER 1966 EDITION AIAOQ (O THE AMERICAN INSTITUTE OI AKCHITECTS, 17.35 NEW YORK AVENUE, N.W., WASH., D.C. 20006 ARTICLE 7 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the Contractor thirty (30) days after Substantial Completion or the Work unless otherwise stipulated in the Certificate of Substantial Completion, provided the Work has then been completed, the Contract fully performed, and a final Certificate for Payment has been issued by the Architect. ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings designated in those Conditions. 8.2 The Contract Documents, which constitute the entire agreement between the Owner and the Contractor, are listed in Article 1 and, except for Modifi( ations issued after execution of this Agreement, are enumerated as follows: (List below the Agreement, Londioons of (hr (oolrart (( ' encral, tiul�plemrn Lin, other Conditions), Drawings, Specifications, Addenda and aceePted Alternates, showing page or sheet numbers in all casus and dates where appli(able.) SPECIFICATIONS entitled] FIRS STATION NO. 17, DOYLE SPRINGS ROAD, LITTLE ROCK, ARKANSAS FOR CITY OF LITTLE ROCK, MR. ANCIL UIDUTHIT, CITY MANAGER, LITTLE ROCK, ARKANSAS, dated March 13, 19670 consisting of; Cover, Index, Notice to Bidders, Instructions to Bidders, Form of Bid, General Conditions (A.I.A. Document A201), General Conditions (Supplementary), Specifications -• Division 2 thru Division 16. PLANS entitled; FIRE STATION NO. 17, DOYLE SPRINGS ROAD, LITTLE ROCK) ARKANSASp dated March 13, 1967) consisting of; Sheets 1 of 8, 2 of 8, 3 of 8, 4 of 8, 5 of 8, 6 of 8, 7 of 8, and 8 of 8. ADDENDUM NO. 1, dated March 22, 1967 All conditions as set out in Form of Bid by and between Mr. Ancil Douthit, City Manager, City of Little Rock, City Hall, Little Rock, Arkansas, and James H, Cone, Inc., P. 0, Box 108, Little Rock, Arkansas, dated March 28, 1967s shall become a part of these contract documents. AIA DOCUMENT A101 01VNER- CONTRACTOR AGREEMENT • SEPTEMBER 1966 EDITION 4 AIA® © THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASH., D.C. 20006 This Agreement executed the day and year first written above. OWNER CITY OF LITTLE ROCK Mayor City Clerk `-� %�'_.& -YG,f/ AIA DOCUMENT A101 OWNLR CONTRACTOR AGRI LMENT • SEPTEMBER 1966 EDITION 5 AIA® © THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASH., D.C. 20006 -3- SECTION 2. There is hereby appropriated from the 1965 Capital Improvement Construction Fund to Project 52 - Fire Station No. 17 - Industrial Area - the sum of Sixty Thousand Dollars ($60,000.00) for the purpose of paying the contract price herein provided for and the cost of site improvement for said Fire Station and Architect fees. SECTION 3. This Ordinance shall be in full force and effect from and after its adoption. PASSED: April 3, 1967 ATTEST: �j.,4t APPROVED: City Clerk Mayor