HomeMy WebLinkAbout18689• "'2002149176
06/05/2002 09:00:03 AN
Filed 8 Recorded in
Official Records of
CAROLYN STALEY
ORDINANCE NO. 18,689 PULASKI COUNTY
CIRCUIT /COUNTY CLERK
Fees $11.00
AN ORDINANCE AMENDING CHAPTER 30 OF THE CODE
OF ORDINANCES OF THE CITY OF LITTLE ROCK,
ARKANSAS, PROVIDING FOR A WAIVER OF MASTER
STREET PLAN STREET IMPROVEMENTS FOR PROSPECT
STEEL LOCATED AT 8900 FOURCHE DAM PIKE
BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK,
ARKANSAS:
SECTION 1. That Chapter 30 of the Code of Ordinances be amended to provide for a waiver
of certain requirements within the Master Street Plan for the Prospect Steel as follows:
Subsection a. That Chapter 30 Article VI requiring boundary street improvements to
the requirements of the Master Street Plan be waived until such time as facilities
expansion exceeds 10% of the current building area at the site. The specific waiver is
for widening Fourche Dam Pike at 8900 Fourche Dam Pike.
SECTION 2. This ORDINANCE shall take effect thirty (30) days from and after its passage.
PASSED: MAY 28, 2002
ATTEST:
City Q erk
APPROVED:
Mayor
,v
�. °
9
Useful Facts:
Doc##® 92149176
Fourche Dam Pike is currently constructed as an Industrial Collector with open ditches and paved
shoulders. Master Street Plan calls for 4 — 12' wide lanes with 6' paved shoulders each side.
Widening would improve traffic flow on Fourche Dam Pike by allowing turn lanes along this frontage.
The applicant estimates that the project cost would be $100,000. If the applicant was granted a
hardship, Prospect would only have to put up $50,000. This would improve approximately '/2 the total
frontage.
The applicant has asserted that driveway culverts would have to be moved and reconstructed. Our
inspectors say that does not appear to be necessary for just a 10' widening project. This may
substantially reduce the applicant's estimated cost for construction.
Planning estimates that the 16,000 square foot building expansion is less than 10% of the total building
footage on -site.