Loading...
HomeMy WebLinkAbout170660. 0 h r � O 621 ORDINANCE NO. 17,066 AN ORDINANCE AMENDING ORDINANCES NOS. 16,367 AND 15,777 AND ORDINANCE ESTABLISHING PERMIT FEE SCHEDULES FOR BUILDING, ELECTRICAL, PLUMBING AND RELATED WORK PERFORMED IN THE CITY OF LITTLE ROCK; REPEALING ALL TECHNICAL CODE ORDINANCE AND CODE OF ORDINANCE PROVISIONS IN CONFLICT THEREWITH; DECLARING AN EMERGENCY; AND FOR OTHER PURPOSES. BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS. SECTION 1. The following are hereby established as permit fee schedules for building, electrical, plumbing and other related work in the City of Little Rock, Arkansas. FEE SCHEDULE I. Building Permit Fees A. Permit Fees Total Valuation Fee $1,000.00 and less No fee, unless inspection required, in which case a $30.00 fee for each inspection shall be charged. $1,001.00 to $15,000.00 $20.00 for the first $1,000.00 plus $2.00 for each additional thousand or fraction thereof, to and including $15,000.00. $15,001.00 to $50,000.00 $48.00 for the first $15,000.00 plus $2.50 for each additional thousand or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $135.50 for the first $50,000.00 plus $2.00 for each additional thousand or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $235.50 for the first $100,000.00 plus $1.25 for each additional thousand or fraction thereof, to and including $500,000.00. $500,0001.00 to $1,000,000.00 $735.50 for the first $500,000.00 plus $.75 or each additional thousand or fraction thereof, to and including $1,000.000.00. Page 1 of 10 0 $1,000,001.00 and up 0 $1,110.50 for the first $1,000,000.00 plus $.50 for each additional thousand or fraction thereof. Note: Proper documentation, i.e. copy of contract or letter of affidavit from applicant, must be presented when obtaining permits. If documentation is not present or cannot be obtained, the latest Building Valuation Data Chart as published by the Standard Building Code will be used in determining permit fees. B. Data Processing Fee: The following are hereby established as the data processing fee schedule for building, electrical, plumbing and other related work in the City of Little Rock, Arkansas. Collected fees shall be set in a separate account and shall be used for the purpose of purchasing and maintaining data processing equipment, software and to provide training for the Department of Neighborhoods and Planning. All purchases shall be made within the guidelines as set by city purchasing procedures and shall not be made without prior written approval from the Director of Neighborhoods & Planning. PERMIT VALUATION FEE $ .01 to $15,000.00 - $1.00 $15,001.00 to $50,000.00 - $2.00 $50,001.00 to $100,000.00 - $3.00 $100,001.00 to $500,000.00 - $4.00 $500,001.00 to $1,000,000.00 - $5.00 $1,000,001.00 and up - $6.00 *Fees are in addition to permit charge C. Barricade Fees: The area of public property on which fees shall be paid shall be that space enclosed within and occupied by any barricade, fence, covered walkway or tunnel. Fee may be waived in conjunction with application for new building permit. Charges shall be made for the day, and any fraction of a day, on the following basis: for public space occupied - $.01 per sq. ft. with minimum fee per day of $30.00. D. Housing Moving Fees Moving structure off lot - $100.00 Moving structure on same lot - $ 50.00 Inspection fee inside City - $ 30.00 Page 2 of 10 622 0 0 Inspection fee outside City, but in Pulaski County - $ 50.00 Inspection fee outside Pulaski County, but in the State of Arkansas - $100.00 E. Demolition of Structure: $.02.sq. ft. of floor area. Min. Fee$.02 /sq.ft. /$30.00 F. Fuel Tanks and Pumps: (New or Replacement) Tanks $40.00 Pumps $30.00 G. Minimum fee for any permit shall be: $30.00 H. Investigative Fee: In those instances wherein the information submitted to obtain a permit is in adequate or incomplete, or work has begun without a permit, or an inspection is required to determine the "on- site" conditions prior to issuance or denial of a permit, the Building Official may charge the owner an investigative fee of $30.00. The payment of the investigative fee shall not exempt any person from compliance with the provisions of the code, or from any penalty prescribed by law. I. Reinspection Fee: A reinspection fee of $25.00 will be charged when an additional trip is made by an inspector due to rejections, lockouts, insufficient information as to location of building or structure, work not ready for inspection, or any other cause due to neglect or failure on the part of the applicant. J. Plan Checking Fee: When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be submitted by 103.2 of the 1992 Arkansas Fire Prevention Code, Vol. II, a plan checking fee shall be paid to the Building Official at the time of submitting plans and Page 3 of 10 M 623 M M = M = M = i M � M M 0 7 specifications for checking. Said plan checking fee shall be equal to one -fourth of the building permit fee as set forth in 103.7.4, of the 1992 Arkansas Fire Prevention Code, Vol. II. Minimum fees shall be $50.00 for new construction (added square feet) and $30.00 for repair, remodels and miscellaneous permits requiring plan review. Such plan checking fee is in addition to the building permit fee. K. Blasting Fee: In addition to insurance and bond as required in Ordinance #11361, a permit fee of $30.00 per day shall be paid. L. Curb Cuts: 1. Residential drives: 2. Commercial drives: 3. Minimum fee: M. Tent Permit: Flat fee of $30.00 upon proper completion of Fire Department Approval Form. N. Construction Shack or Field Office: Flat fee of $30.00 with site plan. Fee waived if included with permit application. O. Franchise Fee (Public Right -of -Way) A flat fee of $75.00 shall be included with each permit application. P. Copy Fees: 1. Duplicate Permit Cards (lost, stolen, misplaced, etc.) - $5.00 per card 2. Permit Background Computer Readouts - $2.00 per copy 3. Copier Fees - $.50 per copy 4. Duplicate Copy of Certificate of Occupancy - $10.00 Page 4 of 10 $ 4.00 per cut $ 7.00 per cut $30.00 624 625 Q. Board of Appeals applications (building or electrical) A flat fee of $30.00 shall be included with each Board of Appeals application. R. Parking Lot Fees: A minimum routing fee of $50.00 shall be charged and permit fees shall be assessed as set forth in the cost schedules in paragraph I.A. S. Miscellaneous Permit Fees: Satellite dishes, towers and cell cites, fire alarm systems, fences, retaining walls and any other miscellaneous permit, unless previously outlined, shall be set forth in the unit cost schedules paragraph I.A. T. Penalties (Working without a Permit): Where work for which a permit is required by the 1992 Arkansas Fire Prevention Code, Vol. H is started or proceeded prior to obtaining said permit, the fee herein specified shall be tripled, but the payment of such triple fee shall not relieve any persons from fully complying with the requirements of the 1992 Arkansas Fire Prevention Code, Vol. II in the execution of the work nor from any other penalties prescribed herein. II. Electrical Permit Fees A. New Construction: 1. One and two family dwellings - $.05 /sq.ft. under roof 2. All Other Occupancies: As set forth in the unit cost schedules in paragraph II C. B. Repair /Alteration/Addition to existing Construction: 1. As set forth in the unit cost schedules in paragraph II C. Page 5 of 10 • • szG C. 1. Meter Loops a. First b. Additional 2. Load Centers: Regardless of Voltage - Up to 60 amp Up to 100 amp Up to 150 amp Up to 200 amp Over 200 R3 Openings 1to10 11 to 20 21 to 40 41 to 60 61 to 80 81 to 100 101 to 200 201 to 300 301 to 400 over 400 $12.00 $ 6.00 $ 7.00 $14.00 $22.00 $30.00 $ 4.50 per 100 amp over 200 amp $ 5.50 $10.00 $17.50 $22.50 $26.50 $28.50 $46.00 $58.00 $66.50 $ 4.00 for each 25 4. Motor and Generator Wiring: 1/8 to 1 H.P. or K.W. $ 4.00 2 to 4 H.P. or K.W. $ 7.00 5 to 10 H.P. or K.W. $10.50 11 to 15 H.P. or K.W. $13.50 16 to 20 H.P. or K.W. $16.50 21 or over H.P. or K.W. $20.00 fraction horsepower motors can be grouped for their total horsepower and paid for as one unit. 5. Temporary Construction Meter $15.00 6. Temporary Power to Building $18.00 7. Outside Electrical Signs $15.00 8. Electrical Window Signs $15.00 9. Neon Borders, Window or Outside $15.00 Page 6 of 10 0 10. Sign Boards Regular Permit $ 5.50 11. Rectifiers $13.50 12. Motion Picture Machines $12.00 13. Electric Stoves, Ranges, Dryers, $15.00 5. Water Heaters $12.00 14. X -ray Machines $12.00 15. Vent Hoods /Bath Fan/Exhaust Fan $ 4.00 16. Dishwashers /Trash Compactors $ 4.00 17. Disposals /Ceiling Fans $ 4.00 18. Electric Heat 1 to 15 K.W. $ 5.50 16 to 25 K.W. $ 9.50 19. Special Circuits such as Window Air Conditions: 20 to 30 amp $ 6.50 30 to 60 amp $ 8.50 20. Special Equipment per 1000 watts $ 3.00 21. Festoon or Temporary Decorative Lights: Outdoor Sales and Display Lights; Meter Loop $12.00 Each Circuit $12.00 Each 50 Lamps $ 3.00 22. Inspections (each) $15.00 As per conditions of I. I. $20.00 23. Reinspections (each) $25.00 As per conditions of 1. J. $15.00 D. Examinations: Renewal Fee - 1.. Master Electrician $35.00 2. Journeyman Electrician $20.00 3. Specialist Refrigeration Electrician $15.00 4. Supervising Air Conditioning Elect. $15.00 5. Air Conditioning Electrician $15.00 6. Air Conditioning Maint. Electrician $15.00 7. Specialist Sign Electrician $15.00 8. Maintenance Electrician $15.00 Examination - 1. Supervising Air Conditioning Elect. $30.00 2. Air Conditioning Electrician $25.00 3. Air Conditioning Maintenance Elect. $25.00 4. Specialist Sign Electrician $25.00 Page 7 of 10 621 Homeowner - 1. Examination Fee $25.00 E. Temporary Power Requirements: Before any power is supplied to the permanent distribution system of a building under construction, written notice must ben submitted to this office noting the length of time the temporary power will be needed before the final electrical inspection is made, the understanding that the structure will not be occupied until after the final inspection, and that the party submitting the request will assume liability of any damage incurred as a result of disconnection of power from the building as a result of a violation of this ordinance. The time limit on temporary power being furnished to the building will be determined on the basis of need, not to exceed thirty (30) days. An extension of time may be granted only by special permission. F. Work with No Permit: In case it shall be discovered that any electrical work has been installed or put into use for which no permit has been issued, the violator shall pay a fee equal to three (3) times the permit fee which shall have been paid for work done in violation thereof and no additional permits shall be granted until all fees have been paid. III. Plumbing Permit Fee A. New Construction: 1. One and Two Family Dwellings: 2. All other occupancies: As set forth in the unit cost schedules in paragraph III, B. Page 8 of 10 $.05 /sq.ft. under roof M M 628 0 E B. Repair /Alterations /Addition to Existing Construction: 1. Unit Costs - Each nlumbinQ fixture outlet or annliance - $ 4.00 Shall include each water closet, urinal, bidet, sink, lavatory, basin, laundry sink, wash tray, dishwasher, garbage disposal, ice maker, beer or soda fountain, bath tub, hot tub, shower, sauna, drinking fountain, wet bar, washing machine, hose cabinet or hose rack, fire pump, sewer ejector, cooling tower, sill cock, dental unit, hub drain, floor, area or roof drain, sand trap, grease trap, sump pump or any other plumbing element commonly known as plumbing fixture. 2. Water Service 3. Lawn Sprinkler Service 4. Water House Piping 5. Swimming and Wading Pools 6. Renewal of soil, waste or vent lines (each branch or stack) 7. Gas Service (up to 5 meter openings) 8. Gas House Piping (up to 5 openings) Each Additional Opening: 9. Each Gas Fired Appliance: Shall include each water. heater, floor furnace, unit heater, vented wall furnace, commercial clothes dryer, commercial range or oven, or other gas fired appliance not specifically mentioned excluding portable heating stoves and space heaters 10. Domestic Gas Fired Appliance - Ranges, Clothes Dryer 11. Renewal of gas fired appliance vent 12. Central Heating.Furnace of Boiler 13. Direct Fired Makeup Heater 14. Conversion 15. Inspections (each) 16. Reinspections (each) As per conditions of I.J. 17. Investigative Inspections (each) As per conditions of I.I. D. Work located out of City limits shall be charged a surcharge of 50% of total permit charge. Page 9 of 10 M $25.00 $25.00 $12.00 $12.00 $ 5.50 $15.00 $15.00 $ 3.00 $13.00 $ 3.00 $ 5.00 $12.00 $12.00 $12.00 $15.00 $25.00 $30.00 62� • (Ordinance ,',117,066) E. Work with no Permit: The penalty for failure to obtain a permit for work as called for in City Code shall be as described in the penalty section of this Code, and in addition to any such fine or imprisonment as may be imposed pursuant to said penalty section, the violator shall pay a fee equal to three times the permit fee which shall have been paid for work done in violation hereof. SECTION 2. Fees on work requiring a building permit as set forth in Section 105 of the Arkansas Fire Prevention Code shall be paid as required at the time of filing an application. SECTION 3. The provisions of all technical codes, ordinances and codes of ordinances in conflict with the provisions of this ordinance are hereby repealed. SECTION 4. Emergency. The ability to properly inspect and permit building structure in the City, and to assure proper funding for these inspections, is essential to the public health, safety, and welfare. To assure consistent collection in this regard, an emergency is declared to exist and this Ordinance shall be in full force and effect from and after January 1, 1996. PASSED: December 26, 1995 ATTEST: City Clerk Robbie Hancock APPRO D: ` lPJ/ Mayor i Dailey APPROVED AS TO FORMr�Y ��'• City Attorney Tom Car enter Page 10 of 10