HomeMy WebLinkAbout15929•
ORDINANCE NO. 15,929
= = = = = M i
E
AN ORDINANCE AMENDING CHAPTER 31. OF
THE CODE OF ORDINANCES OF THE CITY OF
LITTLE ROCK, ARKANSAS, PROVIDING FOR
DEFINITION, MODIFICATION AND PROCEDURAL
REVISIONS.
WHEREAS, the City of Little Rock is in need of maintaining
accurate parcel and related information; and
WHEREAS, a Geographic Information System (PAGIS) is designed
to fill this need; and
and
`52
WHEREAS, accurate surveying and plat information is essential;
WHEREAS, surveys completed over the last several years fail to
meet necessary and desired levels of accuracy; and
WHEREAS, the Subdivision Regulations are the appropriate
instrument for achieving this accuracy; and
WHEREAS, the technical staff of PAGIS recommends improving the
accuracy of subdivision plats to maintain the accuracy of the
overall system; and
WHEREAS, City staff and related professionals have reviewed
the proposals for appropriateness.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF DIRECTORS OF
THE CITY OF LITTLE ROCK, ARKANSAS.
SECTION 1. That Chapter 31. of the Code of Ordinances be
amended as follows:
Subsection a. That Chapter 31., Article I., Section 31 -2 be
amended to provide the inclusion of the following definitions:
PAGIS means Pulaski Area Geographic Information System, a
computerized geographic information system developed and
maintained by the City of Little Rock, Little Rock
Municipal Water Works and Little Rock Wastewater Utility.
Principle Subdivision Boundary means the property
boundary; (edge) of the total ownership being the approved
preliminary plat boundary..
D -45
1 c -9
M
PAGIS Monument means a cast in place or prefabricated
monument which shall consist of similar construction
describe as: a six -inch diameter steel reinforced
concrete post with a stamped survey cap (see section
31 -380).
Subsection b. That Chapter 31, Article II., Division 1.,
Section 31- 36.(3) be amended to provide for the modification
of sentence four for the purpose of providing the Clerk with
sole authority for the filing of plats and reads as follows:
3. The third step involves submittal of a final plat
conforming to the preliminary plat. This step shall be
initiated not later than twelve (12) months after
approval of the preliminary plat by the planning
commission unless construction work is actively
progressing, in which case the preliminary approval
remains valid. The final plat is a completed document
incorporating engineering specifications in a form,
required for legal record and sale of lots. No
subdivision plat or any part thereof shall be recorded
prior to obtaining final plat approval from the
Neighborhood Revitalization and Planning Department, nor
shall the subdivider convey title to any lot or lots
before obtaining final plat approval and recording of the
final plat by the City.
Subsection c. That Chapter 31., Article II., Division 3.,
Section 31- 89.(1) be amended to provide for additional
vertical information on preliminary plats and read as follows:
1. Contours shown at intervals of not more than five (5)
feet for terrain with an average slope exceeding ten
percent (10 %) or more, and at an interval of two (2) feet
for terrain with slopes less than ten percent (10 %). The
source of the contours along with the source from which
all elevations were derived shall be clearly described.
Subsection d. That Chapter 31., Article II., Division 3.,
section 31- 89.(14) be amended to provide for the requirement
of additional boundary survey information on the preliminary
plat and read as follows:
14. Boundary survey information of the tract shall be as
follows:
a) Boundary lines shall be indicated by a heavy line.
M
b) Adjusted bearings and distances shall be shown on
all boundary lines and ties to all corners of record
utilized. Where boundary lines are curves,
sufficient curve data shall be provided to
adequately describe said curve. As a minimum, curve
data for each curve shall consist of radius, arc
distance, delta angle and chord bearing and
distance. Where boundary lines are common with
previously platted properties, record bearings and
distances shall also be shown.
C) Accurate locations and adequate physical
descriptions of all monuments shall be shown
indicating size, type of material and construction
thereof.
d) Metes and bounds legal description of the tract
boundary.
Subsection e. That Chapter 31., Article II., Division 3.,
Section 31,89, be amended to add a provision that plats be
duly filed in the State Surveyor and County Court House within
the last seven years.
17) Certifications that the plat has been surveyed and
duly filed for record in the offices of the State
Surveyor and the Pulaski County Circuit Clerk /Recorder
within the last seven (7) years.
Subsection f. That Chapter 31., Article II., Division 3.,
Section 31 -89, be amended to add a provision for phasing and
monumentation of the subdivision.
18) A phasing plan outlining the boundaries for each
phase and the location of all PAGIS monuments for
the subdivision. PAGIS monuments shall be placed
such that each corner of the principle subdivision
boundary has a PAGIS monument and any phase shall
have at least two (2) PAGIS monuments.
0
0
Subsection Q. That Chapter 31., Article II., Division 3.,
Section 31 -91., Certificate of Preliminary Plat Accuracy be
amended to state that the subdivision rules and regulations
and the Arkansas Plat Law have been complied with.
CERTIFICATE OF PRELIMINARY
SURVEYING ACCURACY
I, , hereby certify that this plat correctly
represents a boundary survey made or verified by me that all
surveying requirements of the State of Arkansas and City of
Little Rock Subdivision Rules and Regulations have been
complied with and a copy of said boundary has been duly filed
for record in the offices of the State Surveyor and the
Pulaski County Circuit Clerk on
19 , in Plat Book Page
Date of Execution Name
Registered Professional
Land Surveyor No.
Arkansas
355
Subsection h. That Chapter 31., Article II., Division 4.,
Section 31- 117.,(a) be amended to provide that a reproducible
copy of the final plat be supplied to the City and to
establish a time frame for the Clerk to file plats after
approval and read as follows:
a. Submission for certification of final plat approval shall
consist of the document and two (2) transparent originals
(one (1) shall be a mylar), plus fifteen (15) copies
showing all certificates as specified in Section 31 -118,
with the certificate of owner, Certificate of Engineering
Accuracy and Certificate of Surveying Accuracy being
executed. The final plat shall be clearly and legibly
drawn in black ink on suitable tracing material at the
same scale and dimensions used for the approved
preliminary plat. Upon approval and execution of the
Certificate of Final Plat Approval, the Owner's
representative will file the plat for record at Circuit
Clerk's Office and return a certified mylar to the City
within two (2) working days, unless mutually agreed to by
the owner's agent and City representative.
4
0
0
Subsection i. That Chapter 31., Article II., Division 4,
Section 31- 117.(b) be amended to provide that sufficient
survey information be provided to support the input of the
plat into the PAGIS system. Items 5 and 6 shall be combined
into Item 5 with a serial restructuring of Items 1 through 18
accordingly to read as follows:
b. The final plat shall indicate the following information:
1. Name and address of owner of record and subdivider.
2. Name of subdivision.
3. Date of the plat, north point and graphic scale.
4. Names of all streets.
5. Boundary information of the tract shall be as
follows:
a) Boundary lines shall be indicated by a heavy
line.
3156
b) Adjusted Arkansas State Plane Coordinates
(North Zone, NAD -83) shall be shown for all
boundary corners and all corners of record
utilized, along with a statement indicating the
ratio error of closure of the field work.
C) Adjusted bearings and distances shall be shown
on all boundary lines and ties to all corners
of record utilized. Where boundary lines are
curves, sufficient curve data shall be provided
to establish or re- establish said curve. As a
minimum, curve data for each curve shall
consist of radius, arc distance, delta angle
and chord bearing and distance. Where boundary
lines are common with previously platted
properties, record bearings and distances shall
also be shown.
d) Accurate locations and adequate physical
descriptions of all monuments shall be shown
indicating size, type of material and
construction thereof, and size and type of
survey disk utilized. Where found monuments
are replaced with more permanent monuments,
such replacement shall be noted and a
description of the type of found monument
indicated.
5
• • 357
6. Streets and alleys within and abutting the
subdivision, with street names indicated and showing
the source of dedication.
7. Street Center line shall be shown with the following
information provided:
a) Bearings and distances along all line segments.
b) Angles of intersection.
C) Curve data for all curves indicating the
following:
1. Radius
2. Length of tangents
3. Delta Angle
4. Chord Bearing and Distance
Sufficient geometric data shall be provided
along all rights -of -way to produce a closed
polygon figure within the bounds of the tract
being platted.
S. Source of title giving deed record book and page
number or instrument number.
9. Sufficient geometric data shall be provided along
all lot lines (bearings and distances and /or angles)
to produce a closed polygon figure for each lot,
with chord bearings and distances and radii of
rounded corners.
lo. Building setback lines with dimensions.
11. Lot and block numbers.
12. Easement, buffer strips and public service utility
right -of -way lines giving dimensions, locations and
purpose.
13. Sufficient geometric data shall be provided to
produce a closed polygon figure along with a
description of any areas to be dedicated or reserved
for public use or acquisition with the purpose
indicated thereon; and of any areas to be reserved
by deed covenant for common use of all property
owners.
14. Accurate locations and descriptions of all
monuments.
15. Key map where more than one (1) sheet is required to
present map.
25
• •
16. Location of tract by metes and bounds legal
description giving acreage to the nearest one
thousandth of an acre.
17. Any area or lot which may be prone to local flooding
shall have the lowest allowable finished floor
elevation indicated on the final plat. This
elevation shall be compared to the one- in -one-
hundred -year flood elevation shown on the flood
insurance study or, if not available, any other
applicable study in which the one-in- one - hundred-
year flood elevation is depicted. The Engineering
Division shall review an approved compliance with
Chapter 8, Article IV.
Subsection i. That Chapter 31., Article II., Division 4.,
Section 31- 117.,(c) be amended to include submittal of all
survey calculations and field notes upon request when errors
or noncompliance to the regulations are suspected on the final
plat and read as follows:
C. Copies of all survey calculations and field notes shall
be submitted for review when requested. When errors are
suspected, the Planning Commission may cause a surveyor
to check the final plat for correctness. Certification
of approval of water supply and sanitary sewage disposal
by the appropriate agency, when not connected to the
municipal system, shall be submitted.
Subsection k. That Chapter 31., Article II., Division 4.,
Section 31 -117, be amended to include requirements for
monumentation of final plats.
d. All PAGIS monuments shown on the approved preliminary
plat for the phase being final platted shall be
monumented.
Subsection 1. That Chapter 31., Article II., Division 4.,
Section 31 -118., Certificate of Surveyor Accuracy be amended
to certify that all required monumentation has been completed
and all surveying requirements have been complied with at time
of submittal of plat for approval and read as follows:
7
CERTIFICATE OF SURVEYING ACCURACY
I, , hereby certify that this plat
correctly represents a boundary survey made or verified by me,
all monuments required actually exist and are correctly shown
hereon and that all surveying requirements of the Little Rock
Subdivision Rules and Regulations have been complied with.
Date of Execut
Name
Registered Professional
Land Surveyor No.
Arkansas
Subsection m. That Chapter 31., Article II., Division 4.,
Section 31- 121.,(b) be amended to include the review for
compliance with survey requirements into the final plat
approval process and read as follows:
b. Review of Final Plat. The Engineering Division shall
review final plats for conformance with drainage and /or
construction plans approved in conjunction with the
preliminary plat and for conformance with the survey
requirements within this chapter. Comments will be
forwarded to the Planning Department for use in final
plat review.
Subsection n. That Chapter 31, Article II., Division 4.,
Section 31- 121.,(c) be amended to include the provision that
the survey requirements be verified before approval of final
plat and read as follows:
C. Approval. Responsibility for final plat approval shall
reside with the Planning Director, who shall approve or
disapprove the final plat within thirty (30) days of the
submission thereof, unless the Subdivider agrees in
writing to deferral. Within fifteen (15) days of the
submittal of the final plat, the Planning Director, or
designee, shall notify the applicant of the status of his
plat. No final plat shall be approved until its
conformance with the preliminary plat and the survey
requirements within this chapter has been verified and
the subdivider and the City have entered into an
Agreement assuring completion of all required
improvements as specified in Section 31 -431. Approval of
the final plat shall be accomplished when the Planning
Director signs the certificate of final plat approval as
shown in -this division.
• • goo
Subsection o. That Chapter 31., Article I., Section 31 -2. be
amended to provide for the definition of PAGIS Geodetic
Control Network and read as follows:
PAGIS Geodetic Control Network means a group of survey
monuments dispersed within the planning jurisdiction of
the City for which horizontal and /or vertical positions
have been determined and which have been approved by the
City for use as ground control for surveying and
engineering projects within the planning jurisdiction of
the City.
Subsection P. That Chapter 31.,'Article III. be amended to
add Division 9. Minimum Survey Standards and read as follows:
DIVISION 9. MINIMUM SURVEY STANDARDS
Section 31 -377. Generally
This division is provided to establish minimum standards for
surveying work performed for the development of subdivisions
within the jurisdiction of the Little Rock Planning
Commission. This division shall apply to all developments
requiring the submittal of a preliminary and /or final plat to
the Planning Commission for review and approval. All boundary
surveys performed for the purpose of subdividing properties
within the jurisdiction of the City shall conform to the
"Arkansas Minimum Standards for Property Boundary Surveys and
Plats" except where the standards contained within this
chapter exceed those established by the State.
Section 31 -378. Horizontal Control Standards
a) The horizontal datum for all survey work performed shall
be the Arkansas State Plane Coordinate System - North
Zone - NAD -83 Adjustment. All horizontal control work
shall commence and end at a PAGIS geodetic control
network monument or other approved monument.
b) Horizontal positions for all subdivision boundary corners
shall be determined to an accuracy standard equal to
Second Order, Class II classification as defined by the
Federal Geodetic Control Committee. All field techniques
and procedures shall be compatible with the equipment
utilized to insure that a true Second Order, Class II
accuracy level is achieved.
C) A minimum of two (2) subdivision boundary corners shall
be tied into a PAGIS geodetic control monument by closed
traverse. The two (2) corners shall be intervisible with
each other. Position and reference information shall be
provided on a standard form for each corner and submitted
with the final plat. Forms may be obtained from the
• 0
Planning Department. These monuments will be included
into the PAGIS Geodetic Control Network if, after their
review by the Engineering Staff, they are determined to
be suitable for inclusion into the network.
d) All interior corners of the subdivision (lot corners,
street center line control points, etc...) shall be
established and monumented to meet the minimum accuracy
standards established by the Arkansas Minimum Standards
for Property Boundary Surveys and Plats for Urban, Type A
property.
Section 31 -379. Vertical Control Standards
a) The vertical datum for all survey work performed shall be
the National Geodetic Vertical Datum 1929 Adjustment
(NGVD29). All vertical control work shall commence and
end at PAGIS geodetic control monument or other approved
monument.
b) Elevations for all concrete monuments shall be determined
to an accuracy standard equal to Third Order
classification as defined by the Federal Geodetic Control
Committee. All field techniques and procedures shall be
compatible with the equipment utilized to insure that a
true Third Order accuracy level is achieved.
C) Elevations shall be determined for all subdivision
boundary corners.
Section 31 -380. Monumentation
a) All principle subdivision boundary corners shall have
PAGIS monuments with at least two monuments per phase as
approved on the preliminary plat. These monuments may be
cast in place or prefabricated and shall be of a similar
construction described as follows:
1. Six -inch diameter steel reinforced concrete post set
flush with ground.
2. Monument shall be a minimum of thirty (30) inches in
depth.
3. Steel reinforcement shall consist of a minimum of
two (2) 34 -inch long 1/2 -inch diameter steel bars.
Bars shall be driven a minimum of 6- inches into
undisturbed soil.
4. A brass or aluminum survey cap, a minimum of
2- inches in diameter, shall be cast or grouted into
the top of the concrete post.
10
362
The following information shall be stamped into the
survey cap.
a) A stamped "X" or 11.11 to mark the precise location of
point being monumented.
b) Registration No. of the Surveyor in charge.
b) All lot corners and boundary corners other than those
described in paragraph (a), above, shall be monumented
according to the specifications outlined with the
"Arkansas Minimum Standards -for Property Surveys and
Plats" and any amendment made thereto.
C) All street center line intersections and beginning and
ending points of curves shall be monumented and shall be
of a similar construction described as a 112 -inch or
larger diameter steel rebar, a minimum of 24- inches in
length. The highest point shall be at least 1/2 -inch
below the surface of the asphalt roadway. For concrete
roads, said monuments shall be flush with the finished
roadway. Test bore hole may be used to set pin.
Subsection 4. That Chapter 31., Article IV., Division 1.,
Section 31 -405 be amended to combine items (a) and (b) and utilize
a reference to Section 31 -380 defining monumentation and read as
follows:
All permanent boundary, lot and street center line control
monuments shall be set in accordance with Section 31 -380 of
this chapter and shall be indicated on all plats. Removal
of any monument by anyone not under the direct supervision
of a Registered Land Surveyor registered under the Laws of
the State of Arkansas is prohibited.
PASSED: September 4, 1990
ATTEST:
Asst. City Clerk Robbie Hancock
APPROVED: l
1 r
Mayo F oyd G. Villines, III
11