Loading...
HomeMy WebLinkAbout81341 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 RESOLUTION NO. 8,134 221 A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH FLYNCO, INC. FOR $112121600 FROM THE 1987 BOND FUND, ACCOUNT NO. 301 - 900 -0039, IN ORDER TO CONSTRUCT THE WEST LITTLE ROCK BRANCH LIBRARY, AND APPROVING CHANGE ORDER #1 IN THE AMOUNT OF $119,797.00. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS: SECTION 1: The City Manager is hereby authorized to enter into a contract with Flynco, Inc., for an amount not to exceed $1,212,600 from the 1987 Bond Fund, Account No. 301 - 900 -0039 to construct the West Little Rock Branch Library. SECTION 2: The City Manager is also authorized to approve Change Order #1 in an amount not to exceed $119,797.00. ADOPTED: April 18, 1989 ATTEST: CIA CLERK J;NO CZECH APPROVED AS TO FORM: MARK STODOLA, CITY ATTORNEY APPROVED: - q6j Z' I C I MAYOR FL YD G. VILLINES, III R -Z, /" 7 MOA F RIECM C "UNIVOP TO: MAYOR AND BOARD FROM: M ON R' OF DIRECTORS SUBJECT: WEST LITTLE ROCK BRANCH LIBRARY DATE: APRIL 6, 1989 222 BOARD ACTION RECOMMENDED: Approval of a resolution authorizing the City Manager to enter into a contract with Flynco, Inc. for $1,212,600 from the 1987 Bond Fund, Account No. 301 - 900- 0039,in order to construct the West Little Rock Branch Library, and approving Change Order #1 in the amount of $119,797 BACKGROUND INFORMATION: The 1987 Bond issue allocated $2,000,000 for the construction and furnishing of a West Little Rock Branch Library. Plans for this facility weres developed by Polk, Stanley & Associates. After final plans were completed, it was apparent that the entire project could not be built as designed within the $2,000,000 budget. Upon the recommendation of the architects, bidding was suspended and several deletions to the project were made to reduce the total cost. An addendum was then issued to all bidding contractors, Polk, Stanley & Associates estimates that, working with the Director, Assistant Director, and the West Little Rock Branch Committee, the project cost was reduced by approximately $500,000 through the following deletions: 1. Interior brick work (except for foyer area) 2. Modification of interior lighting coves 3. Modification of entryway /foyer from vaulted ceiling to lowered, flat ceiling 4. Removal of all exterior porches, except over main entrance (modified porches to be added back under change order) 5. Deletion of perimeter sidewalks 6. Circulation desk and kitchen millwork (to be added back under change order) 7. Fin -tube heating system 8. Change lower roofing from copper to built -up roof CITY OF LITTLE ROCK, ARKANSAS ?23 Page 2 April 6, 1989 Bid opening for the project was subsequently held at 2:00 p.m., March 9, 1989 in the second floor auditorium of the Central Arkansas Library System, 700 Louisiana Street, Little Rock, Arkansas. The bid opening was conducted by Joe Stanley, Polk, Stanley & Associates. Tommy Polk, Polk, Stanley & Associates served as recorder. Also attending were Lee Gordon and Sherry Walker, trustees and members of the West Little Rock Branch Library Committee; Gary Greeson, City of Little Rock liaison for the project; Rosemary S. Martin, Director, and David Macksam, Assistant Director. Rick Campbell, trustee and member of the committee, was absent. Larrie Ohlemeyer, Administrative Secretary to the Director, also attended to assist with recording of bids. The following general contractors presented bids. (See attached bid tab for details.) Contractor Base Bid Baldwin & Shell $1,236,777 CWR Construction 1,301,476 Flynco, Inc. 1,198,000 Kullander Construction 1,301,500 Matson, Inc. 1,239,000 N.P. Alessi, Inc. 1,259,000 Progressive Construction 1,206,238 Thomas Harding Construction 1,400,029 Flynco, Inc. presented the low bid of $1,198,000. After careful review by Polk, Stanley & Associates, it was determined that Flynco, Inc. met all requirements, including bonding and insurance requirements. Joe Stanley then reviewed the bid with the West Little Rock Branch Committee. At that time, Polk, Stanley recommended that the committee add to the base bid Alternate #1, changing the air handling unit, for a total of $1,212,600, which would become the contract price for the building. Polk, Stanley also recommended that they be allowed to explore prices for adding back the circulation desk and meeting room kitchen millwork, as well as modified porches to provide protection from weather for library users. This recommendation anticipates these additions by change order. ?24 Page 3 April 6, 1989 The items to be added to the contract by change order are as follows: Net Additions for Flynco Items 1. Circulation Desk and Meeting Room Millwork add: $ 37,854 2. Modified Porches add: $ 86,793 NET ADDITIONS $132,302 Less Budget Adjusted Reductions 1. Delete Some Brick Pavers deduct: <$ 7,655> 2. Electrical Conduit Change deduct: <$ 4,850> TOTAL DEDUCTS <$12,505> TOTAL FOR CHANGE ORDER #1 $119,797 This results in a total construction cost of $1,332.397. Further refinement of the overall budget provides for the addition of the recommended items (1 and 2 above) without exceeding the project budget of $2,000,000, and without use of the contingency line item of $34,676. TD :kw9