RESOLUTION NO. 7,800
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
ACCEPT BIDS AND AWARD CONTRACTS FOR TRAFFIC,
SIGNAL IMPROVEMENTS AT 12TH STREET AT CEDAR,`,
PINE AND WOODROW STREETS AND ON RODNEY PARHAM
ROAD FROM MARKHAM TO GREEN MOUNTAIN DRIVE.
236
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF
THE CITY OF LITTLE ROCK, ARKANSAS:
SECTION 1. The City Manager is hereby authorized to accept
bids and award contracts to bidders as set forth in the attached
fact sheets and bid tabulations for contracts for traffic signal
improvements at 12th Street at Cedar, Pine and Woodrow and on
Rodney Parham Road from Markham to Green Mountain Drive, for a
total price not to exceed the budget, payable from the funds
specified in the fact sheets.
ADOPTED: June 16, 1987
ATTEST:
C14 CLERK JAA CZECii
APPR A TO ORM:
MARK STODOLA, CITY ATTORNEY
APPROVED:
a
MAYOR LOTTIE SHACKELFORD
i
r - �,-4
k '1D
BO OF DIRECTORS COMMUNICPfON —
TO: MAY BOARD OF DIRECTORS
FROM: TOM
CIT GER
SUBJECT: SIGNAL IMPROVEMENT CONTRACTS
BID NOS. 7208 AND 7221
DATE: MAY 28, 1987
BOARD ACTION RECOMMENDED -- Adoption of a
authorizing the City Manager to enter into
traffic signal improvements as proposed by
follows:
I-
237
resolution
a contract for
the low bidder as
Bid No. 7208 - Rodney Parham Road Signal Interconnect
Low bid by LEG Enterprises - $81,626.75
Bid No. 7221 - 12th Street at Cedar, Pine and Woodrow
Low bid by Construction Management and Maintenance
- $103,954.35
The Rodney Parham interconnect project will allow
coordination of traffic signals on Rodney Parham Road from
Markham to Green Mountain Drive. The contract consists of
the installation of communications cable and wiring
necessary to tie these intersections into the City's
computerized signal control system. Funds for this work are
available as approved in the Bond Project Account 399 -9101.
Signal improvements on 12th Street at Cedar, Pine, and
Woodrow will bring these intersections up to the current
standards of display and hardware. This includes
installation of new steel signal poles, signal heads,
control equipment, and placing wiring underground. In
addition, these intersections will also be tied into and
coordinated through the City's computerized signal control
system. Funds for this work are available as approved in
previous budgets from Account Nos. 599 -8676, 599 -8160, and
599 -8163.
ML /TD:jw3
cc: Bob Lane, Public Works Director
CITY OF LITTLE ROCK, ARKANSAS
City of Little Rock • I Traffic Engineering
Department of 621 South Broadway
Public Works L i t e R ock, Arkansas 7
2201
371-4586
238
May 27, 1987
TO: Bob Lane, Director
VIA: Don McChesney, City Enginee� t
FROM: Mark Lyons, Traffic Systems Engineer
SUBJECT: Traffic Signal CIF`s
Funding Priorities
Table 1 shows all funding available for previously funded
projects. Table 2 lists projects and account numbers which
are recommended for spending the available funds.
It should be noted that several projects are funded from
more than one account. This resulted from appropriations
over several budget years and from various sources such as
"Street" vs. "Revenue Sharing ".
Table 3 lists projects which have been identified as needed,
but for which no funds will remain available. R shortage of
funds has resulted from:
1. Expanded scope of higher priority
projects.
2. Cost overruns as a result of
inflationary increases.
3. Unanticipated priorities for which
no funds were originally allocated.
Projects listed for which no funds are expected to be
available, will be included in future budget requests.
According to the present schedule, all intersection CIP
funds will be expended by the end -of- the -year. This does
not, however, include funds for Computer upgrade(8684) and
Fire Alarm Cable removal(9678).
i
I
I
CITY OF
LITTLE RCCK
TRAFFIC
SIGNAL C.I.P.
2399
Table 1
FUNDS AVAILABLE
January
1, 1987-.
Amt.
---------------------------------------------------------------------------
Description
Src.Act.
Available
Signals, Various FY 84
599
8160
$14,42:
Signals, Various FY 85/86
599
8163
55,641
Beyer Springs Interconnect
699
8525
:5,571
CBD- Signals FY 85
599
8644
0 Note 1.
CiD- Signals FY 80
499
8676
172,485
Fire Alm. Cable Rem.
499
8678
30,000
Traf. Computer Upgrade
499
8681
31, -'61
Street Lighting Imps.
499
8694
50,000
Rodney Parham Rd.
399
9101
39,918 Note 2.
TOTAL, Funds Available:
$492,396
Note 1: Final on this account pending
settlement with Bonding Co.
Note 2: This project will
require
a transfer.of $4,400 from
other bond funds.
CITY OF LITTLE ROCK
TRAFFIC SIGNAL C.I.P.
Table 2
RECOMMENDED EXPENDITURE
OF
AVAILABLE FUNDS
PROJECT COST BY PRIORITY:
240
* Idlcatas actual bid price
t �
BALANCE
REMAINING
PROJ.
BEFORE
COST
NO.
PROD. NAME
SRC.ACT.
ALLCATION
ALLCCATION
BALANCE
--------------------------------------------------------------------------
9101.1
Rodney Parham Interconnect
399
9i0i
$891918
W1,627 *
18,291,
Rodney Parham O.H. St. Name
399
91401
57791
7,233 *
i,05S
Reserved contengency:
1058
1,058
0
Note: This project will require
a
transfer
of $4,400 from other
bond
funds
.
8163.1
12 Th. at Cedar /Pine /Woodrow
599
8163
55,641
55,641
0
599
8160
24,420
34,420
0
499
8676
172,485
13,89v
158,592
Subtotal:
103,954 #
6676.3
University Ave. Phase I
499
8676
158,592
82,000
76,592
(Markham, 5 Th., 12 Th.)
499
8694
50,000
50,000
0
a
Subtotal:
132,000
8676.4
Broadway Design
499
8676
76,592
20,000
56,592
8163.1
Main at 14Th./17 Th.
499
8676
56,592
56,592
0
699
8525
26,571
81405
207163
Subtotal:
65,000
8525.2
Interconnect_ Hdwr., Warning
699
6525
20,163
20,1W
0
Flashers, and Other
8678.1
Fire Alarm Cable Rem.
499
8676
303000
3'x,00':
�,- � ■■� r ■i■ 4r
CITY OF LITTLE ROCS'
TRAFFIC SIGNAL C.I.P.
Table 3
UNMET FUNDING NEEDS
PROJ.
NO.
PROJ. NAME
8676.1 Traffic Sig. Imps. FY E5
Scott at 6 Th./-, Th.
Cumberland at 4 Th./7 Th.
8163.1 Chicot and Mablevale C.O. Sigralization
8676.2 Traffic Sig. Imps. - FY 85, Maintenance
Cantrell Time Base Cords.
Bond & 6 Th.
Frock 7 4Th.
Kavanaugh & Beachwood
f
NIA -
CST I ir. ; E.. D
REMAIN I G
COST
S4,16'
2S, 000
102,275
Subtotal: $214,438
24.1