RESOLUTION NO. 9.475
2
3
A RESOLUTION DIRECTING THE CITY MANAGER TO
COMMUNICATE TO THE ARKANSAS DEPARTMENT OF
4
POLLUTION CONTROL AND ECOLOGY CONCERNS REGARDING
5
THE LANDFILL OWNED BY BROWNING- FERRIS INDUSTRIES,
INC. ( "BFI").
6
7
8
WHEREAS, Browning- Ferris Industries, Inc. ( "BFI") owns
9
and operates the Model Fill Landfill (the "Landfill ") which
10
is located in the Fourche Creek bottoms, along Mabelvale
11
Pike, and was annexed to the City of Little Rock, Arkansas
12
(the "City ") in November, 1994; and
13
WHEREAS, the City has entered into an agreement with
14
the Federal Emergency Management Agency ("FEMA") to provide
15
flood insurance to its citizens and, pursuant to that
16
agreement, has adopted Ordinance No. 15,302 to regulate the
17
100 -year flood plain within the City as depicted on maps
18
published by FEMA, and the Landfill is located in the
19
regulatory floodway of Fourche Creek; and
20
WHEREAS, no construction may occur in the floodway
21
without a permit from the City, and a condition to receiving
22
such a permit is that the applicant provide an engineering
23
demonstration that the proposed activity will not increase
24
the regulatory flood; and
25
WHEREAS, the U.S. Corps of Engineers ( "Corps "), as a
26
contractor to FEMA, has modeled the 100 -year flood in the
27
area of the Landfill and has calculated that flood storage
28
at that site reduces the 100 -year flood by between 3.00 and
29
3.50 feet; and
30
WHEREAS, BFI has applied to the Arkansas Department of
31
Pollution Control and Ecology (the "Department ") for a
32
permit to expand the Landfill and proposes to extend the
33
Landfill laterally, vertically and horizontally; and
34
WHEREAS, Ordinance No. 15,302 mandates that BFI obtain
35
a permit from the City to carry on the proposed activities
36
in the regulatory floodway and will be required to provide
0.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
an engineering demonstration that the proposed construction
will not increase the flood height, or that BFI will perform
mitigating activities, such as the construction of a
reservoir, to offset any such increase, but the problem is
complicated by the fact that BFI has apparently already
performed filling at the site which may require additional
mitigation or remediation.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF
DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS:
SECTION 1. That the City Manager is directed to
communicate to the Arkansas Department of Pollution Control
and Ecology the Board of Directors concern that the
Department not authorize any further activities by BFI at
the Model Fill Landfill until and unless BFI complies with
Ordinance No. 15,302.