Loading...
HomeMy WebLinkAbout89131 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 RESOLUTION NO. 0 8,913 M M M A RESOLUTION EXPRESSING THE WILLINGNESS OF THE CITY OF LITTLE ROCK TO UTILIZE FEDERAL -AID SURFACE TRANSPORTATION FUNDS FOR THE CONSTRUCTION OF YOUNG CREEK BRIDGE ON NABELVALE PIKE. 207 WHEREAS, the City of Little Rock understands Federal -Aid Surface Transportation funds are available for projects on City streets at the following Federal participating ratios; and WHEREAS, an Arkansas Highway and Transportation Department bridge inspection has determined that the wooden substructure of this bridge needs replacing. A five ton load limit has been placed on the bridge WHEREAS, this project will reconstruct this bridge over Young Creek on Mabelvale Pike. Mabelvale Pike will be widened to collector standards adjacent to the new structure. FEDERAL CITY WORK PHASE SHARE MATCH 1. Traffic Signals CONSTRUCTION & 100% -0- ENGINEERING 2. Intersection CONSTRUCTION & 100% -0- Improvements ENGINEERING RIGHT -OF -WAY & 80% 20% UTILITIES 3. Roadway & Bridge ALL PHASES 80% 20% Construction 4. City Projects ALL PHASES -0- 100% programmed but not let to contract NOW THEREFORE, BE IT RESOLVED BY THE CITY BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS, THAT: SECTION 1: The City of Little Rock will participate in accordance with its designated responsibility in this project. SECTION 2: The City Manager is hereby authorized and directed to execute all appropriate agreements and contracts necessary to expedite the construction of the improvements of City street. SECTION 3: The City of Little Rock pledges its full �P Q � s !i support and hereby authorizes the Arkansas State Highway and Transportation Department to initiate action to construct this project. ADOPTED: May 18, 1993 ATTEST: I'd _ I I P, _ _. p "ji • :4. 6iV, W,