Loading...
HomeMy WebLinkAbout201912256 EP(a of Lifile Rock ®epatf rent of Planning and Development 723 West Markham Street We Rock, Arkansas 72201-1334 Phone: (501) 371-4826 F= (501) 371-6663 Building Codes VP OWNER AFFIDAVIT REQUESTING TEMPORARY PERMANENT CONSTRUCTION POWER TO: ELECTRICAL INSPECTION SUPERVISOR PER1vIIT NUMBER �'W ADDRESS: DATE ISSUED:EXPIRATION DATE: This is to certify that I, the undersigned will not occupy the building structure located above until all inspections are made and a "Certificate of Occupancy" is issued I furlher understand and agree that the City of Little Rock assumes no liability or responsibility for injuries resulting from the incomplete items. Section 8-1 b2. Temporary Power Requirements (From the Little Rock City Code 1988 Revised) Before any power is supplied to the permanent distribution system of a building under construction, written notice must be submitted to this office noting the length of time the temporary power will be needed before the final electrical inspection ;4 madA, the urad^r�-ti,.r ding that fac structure will not be occupied until after the final inspection, and that the party submitting the request will assume liability of any damage incurred as a result of disconnection of power from the building as a result of a violation of this ordinance. The time limit on temporary power being furnished to the building will be determined on the basis of need, not to exceed thirty (30) days. An extension of time maybe granted on by special permission. Ord No. 15,391, §1(II)(E), 12-9-87,• Ord No. 17,073, 1,§1-2-96. Penalties for violation provide for the disconnection of utility services per City Code Section 8-10L City Ordinance 1-9(c), provides a penalty of $75t -00 per day for continuation of the violation ner or Contractor Application Date Date Approved Electrical Supervisor Temporary Power Erp. Date