HomeMy WebLinkAbout201911893 TPCPCity of Liftle Dock 1-1-116
Department of Planning and Development Building Codes
723 West Markham Street
We Rode, Arkansas 72201-1334
Phone: (501) 371-4826 FeDc (501) 371-6863
OWNER AFFIDAVIT REQUESTING TEMPORARY PERMANENT CONSTRUCTION POWER
TO: ELECTRICAL INSPECTION SUPERVISOR
6--�201g1Isc,3 C-
PERMIT NUMBER: DRESS: / (9 6 �, 5 /A,
DATE ISSUED:
EXPIRATION DATE:
This is to certify that I, the undersigned will not occupy the building structure located above until all
inspections are made and a "Certificate of Occupancy" is issued Ifurther understand and agree that the
City of Little Rock assumes no liability or responsibility for injuries resulting from the incomplete items.
Section 8-1 b2. Temporary Power Requirements (From the Little Rock City Code 1988 Revised)
Before any power is supplied to the permanent distribution system of a building under construction, written
notice must be submitted to this office noting the length of time the temporary power will be needed before
the final electrical inspection is made, the understanding that the structure will not be occupied until after
the final inspection, and that the party submitting the request will assume liability of any damage incurred
as a result of disconnection of power from the building as a result of a violation of this ordinance. The time
limit on temporary power being famished to the building will be determined on the basis of need, not to
exceed thirty (30) days. An extension of time may be granted on by special permission.
Ord No. 15,391,,§7(II)(E), 12-9-87,• Ord No. 17,073, 1,§§I-2-96.
Penalties for violation provide for the disconnection of utility services per City Code Section 8-101. City
Ordinance 1-9(c), provides a penalty of $250.00 per day for continuation of the violation
ner or con6wdor
Application Date
Date Approved
Electrical Supervisor
Temporary Power Exp. Date