HomeMy WebLinkAbout201911896 TPCPEt
City of Little Flock
Department of Planning and Development
723 West Markham Street
Little Rock, Arkansas 722014 334
Phone: (501) 371-4826 Fax (501) 371-6863
G
Building Codes
OWNER AFFIDAVIT REQUESTING TEMPORARY PERMANENT CONSTRUCTION POWER
TO: ELECTRICAL INSPECTION SUPERVISOR
PERMIT NUMBER. q b 19 11 %Clk ADDRESS: 1�0 6/ 5
DATE ISSUED:
EXPIRATION DATE:
This is to certify that I, the undersigned will not occupy the building structure located above until all
inspections are made and a "Certificate of Occupancy" is issued I further understand and agree that the
City of Little Rock assumes no liability or responsibility for injuries resulting from the incomplete items.
Section 8-1 b2. Temporary Power Requirements (From the Little Rock City Code 1988 Revised)
Before any power is supplied to the permanent distribution system of a building under construction, written
notice must be submitted to this office noting the length of time the temporary power will be needed before
the final electrical inspection is made, the understanding that the structure will not be occupied until after
the final inspection, and that the party submitting the request will assume liability of any damage incurred
as a result of disconnection of power from the building as a result of a violation of this ordinance. The time
limit on temporary power being furnished to the building will be determined on the basis of need, not to
exceed thirty (30) days. An extension of time maybe granted on by special permission.
Ord No. 15,391,§7(II)(E), 12-9-87,• Ord No. 17,073, 1,§7 2-96.
Penalties for violation provide for the disconnection of utility services per City Code Section 8-101. City
Ordinance 1-9(c), provides a penalty of $250.00 per day for continuation of the violation.
iy
Owner or Contractor
Application Date Date Approved
Electrical Supervisor—
Temporary Power Exp. Date