Loading...
HomeMy WebLinkAbout201911896 TPCPEt City of Little Flock Department of Planning and Development 723 West Markham Street Little Rock, Arkansas 722014 334 Phone: (501) 371-4826 Fax (501) 371-6863 G Building Codes OWNER AFFIDAVIT REQUESTING TEMPORARY PERMANENT CONSTRUCTION POWER TO: ELECTRICAL INSPECTION SUPERVISOR PERMIT NUMBER. q b 19 11 %Clk ADDRESS: 1�0 6/ 5 DATE ISSUED: EXPIRATION DATE: This is to certify that I, the undersigned will not occupy the building structure located above until all inspections are made and a "Certificate of Occupancy" is issued I further understand and agree that the City of Little Rock assumes no liability or responsibility for injuries resulting from the incomplete items. Section 8-1 b2. Temporary Power Requirements (From the Little Rock City Code 1988 Revised) Before any power is supplied to the permanent distribution system of a building under construction, written notice must be submitted to this office noting the length of time the temporary power will be needed before the final electrical inspection is made, the understanding that the structure will not be occupied until after the final inspection, and that the party submitting the request will assume liability of any damage incurred as a result of disconnection of power from the building as a result of a violation of this ordinance. The time limit on temporary power being furnished to the building will be determined on the basis of need, not to exceed thirty (30) days. An extension of time maybe granted on by special permission. Ord No. 15,391,§7(II)(E), 12-9-87,• Ord No. 17,073, 1,§7 2-96. Penalties for violation provide for the disconnection of utility services per City Code Section 8-101. City Ordinance 1-9(c), provides a penalty of $250.00 per day for continuation of the violation. iy Owner or Contractor Application Date Date Approved Electrical Supervisor— Temporary Power Exp. Date