Loading...
HomeMy WebLinkAbout201911424 EPCity of Little Rock Department of Planning & Development 723 W Markham Street Second Floor Little Rock, AR 72201-1334 City of Phone: 501-371-4832 Little Rock ELECTRICAL PERMIT Permit No: 201911424 Issue Date: 02/25/2019 Expiration Date: 02/25/2020 Permission is given to: Contractor: J & S ELECTRIC 19 CAYLOR LANE LITTLE ROCK AR 72209 To perform the following work: Class of Work: REPAIR Sq Ft: 0.00 Job Description: ML, INSP Project Number: 201911424 At the following location: Subdivision/Lot/Block: MID -CITY/ 1128 Address: 1900 ELM ST LITTLE ROCK, AR 72204 Owner: NEAL STACY Valuation: $0.00 1 "1, To be used as (occupancy): SINGLE FAMILY This permit is issued on the express condition that the above work shall conform in all respects to the statements certified to in the application for such permit~ and that all work shall be done in accordance with all applicable zoning building, electrical, plumbing and mechanical ordinances of the City of Little Rock and the State of Arkansas I or we further agree to abide by the applicable conditions as printed on the permit card I or we further certify that we have read and understand the requirements of this permit and that all statements made by us in securing this permit are true Permit Fees: ELEMTRLP Meter Loop Fee EINSP Inspection Fee BDATA Data Processing Fee ELEMIN Electrical Applciation Fee ISSUED BY: Ayisha Hawkins $3.74 $5.39 $5.00 123.42 Total Permit Fees: $37.55 Licensed Contractor or Owner For: Charles G. Givens Building Official To schedule a building inspections call: Greg Grounds at (501)371-4838 City of Little dock Department of Planning and Development Building Codes 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4826 Fax (501) 371-6M OWNER AFFIDAVIT REQUESTING TEMPORARY PERMANENT CONSTRUCTION POWER TO: ELECTRICAL INSPECTION SUPERVISOR PERMIT NUMBER W I S �bADDRESS: DATE ISSUED: EXPIRATION DATE: This is to certify that I, the undersigned will not occupy the building structure located above until all inspections are made and a "Cerli icate of Occupancy" is issued I further understand and agree that the City of Liftle Rock assumes no liability or responsibility for injuries resulting from the incomplete items. Section 842. Temporary Power Requirements (From the Little Rock City Code 1988 Revised) Before any power is supplied to the permanent distribution system of a building under construction, written potice must be submitted to this office noting the length of time the temporary power will, be needed before the final electrical insp; won is made, the undo,—cmid;ug tbat the structure will not be occupied until after the final inspection, and that the party submitting the request will assume liability of any damage incurred as a result of disconnection of power from the building as a result of a violation of this ordinance. The time limit on temporary power being famished to the building will be determined on the basis of need, not to exceed thirty (30) days. An extension of time may be granted on by special permission. Ord No. 15,394§1(II)(E), 12-9-87,• Ord No. 17,073, 1,§12-96. Penalties for violation provide for the disconnection of utility services per City Code Section 8-101. City Ordinance 1-9(c), provides a penalty of $250.00 per day for continuation of the violation. Owner or Contractor Electrical Supervisor Application Date Date Approved Temporary Power Exp. Date