HomeMy WebLinkAbout17162 1 RESOLUTION NO. 17,162
2
3 A RESOLUTION TO AUTHORIZE THE CITY MANAGER TO ENTER
4 INTO A CONSTRUCTION CONTRACT WITH WAGNER GENERAL
5 CONSTRUCTION,INC.,IN THE AMOUNT OF SIX HUNDRED TWENTY-
6 FIVE THOUSAND DOLLARS ($625,000.00), INCLUDING A FIFTY
7 THOUSAND DOLLAR ($50,000.00) OWNER AMENITIES ALLOWANCE,
8 APPLICABLE TAXES AND FEES,FOR RESERVOIR PARK BALLFIELD
9 CONSTRUCTION, UTILIZING PARTIAL FEMA FUNDING TO
10 REBUILD PARK FACILITIES DAMAGED BY THE MARCH 2023
11 TORNADO,WITH A TEN(10)PERCENT CONTINGENCY UP TO SIXTY-
12 TWO THOUSAND, FIVE HUNDRED DOLLARS ($62,500.00), TO
13 ADDRESS UNFORESEEN CIRCUMSTANCES THAT MAY ARISE
14 DURING THIS CONSTRUCTION PROJECT; AND FOR OTHER
15 PURPOSES.
16
17 WHEREAS, the March 31, 2023 tornado caused widespread damage across the City including
18 extensive damage at Reservoir Park; and,
19 WHEREAS,the City was awarded federally issued funds from the Federal Emergency Management
20 Agency earmarked to repair tornado damaged City facilities; and,
21 WHEREAS,under Bid Event No.211,779,the City solicited bids for this project and received two(2)
22 responsive bids to repair damage and improve Reservoir Park amenities including the Ballfield; and,
23 WHEREAS, vendor selection of Wagner General Construction,Inc., was made after determining the
24 bidder had the lowest, responsive, and responsible bid of One Hundred Thirty-Four Thousand Dollars
25 ($625,000.00)for the Southside Park Facilities Access Improvements Construction project which includes
26 a Fifty Thousand($50,000.00)Owner Amenities Allowance attached hereto as Exhibit A; and,
27 WHEREAS, since the vendor's December 2025 bid submission,the City's subsequent bid award and
28 the City's full realization of the project scope in September 2026, there has been vendor supply cost
29 increase,resulting in a Fourteen Thousand Five Hundred Ninety-eight Dollar($14,598.00)cost adjustment
30 issued by the vendor's concrete subcontractor, raising the vendor's project cost estimate to Six Hundred
31 Thirty-Nine Thousand,Five Hundred Ninety-Eight Thousand Dollars($639,598.00). However,the built-in
32 Owner's Amenities Allowance included in the City's bid documents is sufficient to cover this cost increase.
[Page 1 of 3]
1 WHEREAS,to address any unforeseen circumstances that may arise during this construction project,
2 Parks is requesting a ten(10)percent project contingency up to Sixty-Two Thousand,Five Hundred Dollars
3 ($62,500.00).
4 NOW,THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY
5 OF LITTLE ROCK,ARKANSAS;
6 Section 1. The City Manager is authorized to enter into a construction contract with Wagner General
7 Construction, Inc., in the amount of$625,000.00 including a Fifty-Thousand Dollar($50,000.00) Owner
8 Amenities Allowance,applicable taxes,and fees,for Reservoir Park Ballfield construction,to rebuild Park
9 facilities damaged by the March 2023 tornado utilizing partial FEMA funding, with a ten (10) percent
10 contingency up to Sixty-Two Thousand,Five Hundred Dollars($62,500.00),for unforeseen circumstances
11 that may arise during this construction project.
12 Section 2.Funds for this project in the specified amounts below are allocated in the following accounts:
13 • $356,700.00 in FEMA Fund Account No. 270459-72799-G45DF232;
14 • $150,000.00 in Insurance Fund Account No.210459-72799-S45B715; and
15 • $180,800.00 in Bond Account No.332459-72799-B45D004.
16 Section 3. Severability. In the event any title, section, paragraph, item, sentence, clause, phrase, or
17 word of this resolution is declared or adjudged to be invalid or unconstitutional, such declaration or
18 adjudication shall not affect the remaining portions of the resolution which shall remain in full force and
19 effect as if the portion so declared or adjudged invalid or unconstitutional were not originally a part of the
20 resolution.
21 Section 4.Repealer. All laws,ordinances, resolutions, or parts of the same, that are inconsistent with
22 the provisions of this resolution,are hereby repealed to the extent of such inconsistency.
23 ADOPTED: September 29,2026
24 ATTEST: APPROVED:
25
26 AX.LOrn
27 Allison Segars,City Fran ott,Jr.,Mayor
28 APPROVED AS TO LEGAL FORM:
29
30 �
31 Thomas M. Carpenter,City Attorney
32 //
33 //
34 //
[Page 2 of 3]
EXHIBIT A
RESERVOIR PARK IMPROVEMENTS
01 11000 BID FORM
• Quantities listed are estimates only and are used for evaluation purposes
• Inc City shall have the right to adjust the quantit.es based on the actual usage.
• Ary cost not denuf=ad by the successful vendor but subsequently incurred in order to achieve successful
operation shall be borne by the vendor.
DESCRIPTION UNIT QTY
PRICE
1. This Reservoir Park Improvements protect consists of replacing the former softball
field including site fill.finish grades.grass,irrigation.striping,fencing,dugouts.
sidewalks,scoreboards,bleacher seating and other balttleld amenities.
2. The project also includes site utility improvements to meet the new finish grades
and prepare for future phases. The site utilities include city water,storm water,tie
hydrant and electrical oowar.
3. The project also includes coordinating athletic field lighting with the previously 1.3 1
procured lighting vendor and installing the power infrastructure.It will include utility
infrastructure improvements to the existing fire hydrant line, irrigation line,end
stormwater drainage. There will also be partial sidewalk and parking lot I
improvements to tie them to existing Dark amenties.
4. See the contract and construction documents for detail information.
5. BID PRICE twumaruCay
6. BID PRICE fwRmuq
rt et 40.04.a 0. 4.8. +1....k,.* f"a.,r tit J..d ee.i ha t^.c
7. Prey=de an Allowance price of:60,000.00 for Owner approved site and other project
amenity work. All work shall be approved by the Owner. See the Contract and 1
Construction Documents for coordination not the project. f
8. BID PRICE esuun rcK1 _
SO 00 0, c.,.0) LS
9. BID PRICE fwenmit
CI C41 +I-wsr-.1 64ASk.s
11. BID PRICE ALLOWANCE- 2 a)Piuwer.ul
I W?, 0p__
12. BID PRICE ALLOWANCE- 2 bj rwairrrie
1L TOTAL BID PRICE S,8&11(mamma.)
CO ZS- Duo
14.TOTAL BID PRICE 6,8 A 12 mne a _ ,
5;x L,-sLe1 1-.)e,.ts rI we +►.,.ac..,A tie II.rs
[Page 3 of 3]