HomeMy WebLinkAbout17140 1 RESOLUTION NO. 17,140
2
3 A RESOLUTION TO IDENTIFY EXPENDITURES IN VARIOUS
4 WARDS FOR CAPITAL PROJECTS TO BE FUNDED FROM THE
5 PROCEEDS OF THE 2026 CAPITAL IMPROVEMENT BONDS
6 FOR STREET AND DRAINAGE; AND FOR OTHER PURPOSES.
7
8 WHEREAS, Little Rock, Ark., Ordinance No. 22,132 (May 17, 2022) ("LRO 22,132"),
9 authorized the issuance of Limited Tax General Obligation Capital Improvement Bonds for a
10 maximum of Forty Million, Five Hundred Thousand Dollars ($40,500,000) to finance Street
11 Improvements and Forty Million, Five Hundred Thousand Dollars ($40,500,000) to finance
12 Drainage Improvements;and,
13 WHEREAS, LRO No. 22,192 (November 15, 2022)authorized the Series 2022A Bonds
14 allocated among the improvements to include Twenty-Three Million, Seventy Thousand, Seven
15 Hundred Ninety-One and 50/100 Dollars ($23,070,791.50) for Street Improvements and Twelve
16 Million,Nine Hundred Sixty-Eight Thousand,Eighty-Six and 15/100 Dollars($12,968,086.15)for
17 Drainage Improvements;and,
18 WHEREAS,the Board of Directors intends to pass an Ordinance to authorize 2026 Bonds
19 for the remaining balance of the authorization less any costs of issuance to include Seventeen
20 Million, Four Hundred Twenty-Nine Thousand, Two Hundred Eight Dollars ($17,429,208) for
21 Street Improvements and Twenty-Seven Million, Five Hundred Thirty-One Thousand, Nine
22 Hundred Fourteen Dollars($27,531,914)for Drainage Improvements; and,
23 WHEREAS,a series of public meetings have been held in each City Ward to present a list
24 of recommended projects and seek public input on projects to be completed with proceeds of the
25 2026 Bonds for Streets and Drainage in the various Wards.
26 NOW,THEREFORE,BE IT RESOLVED BY THE BOARD OF DIRECTORS OF
27 THE CITY OF LITTLE ROCK,ARKANSAS:
28 Section 1. The ward boundaries of each ward set forth in this ordinance are the ones that
29 exist on the date of this ordinance.
30 Section 2. The Board of Directors intends to accomplish the following list of Street and
31 Drainage Improvement Projects in Ward 1 with approximately Five Million,Three Hundred Fifteen
32 Thousand,One Hundred Forty-Two and 86/100 Dollars($5,315,142.86):
33 a) Martin Street Reconstruction from 24th St to Asher Ave
34 b) West 10t Street Reconstruction from Valentine St to Maple St
[Page 1 of 5]
1 c) Valmar Street Reconstruction from Maryland Ave to West 8th St
2 d) Martin Luther King Jr. Drive at West 36th Street Sidewalk
3 e) West 19th Street Drainage from State St to Gaines St
4 f) East 6th Street Drainage at College St
5 g) Boulevard Avenue Drainage from 28th St to 29th St
6 h) West 21St Street Drainage from Oak St to Maple St
7 i) 1916 Harrison Street Drainage
8 j) Abigail Street Drainage from W 13th St to W 14th St
9 k) Gaines Street Drainage from W 33"1 St to W 34th St
10 1) Sherman Street Drainage from Capitol Ave to W 7th St
11 m) West 19th Street and Martin Luther King Jr Drive Drainage
12 n) West 10th Street and Commerce Street Drainage
13 o) 2417 S Pulaski Street Drainage
14 p) 3010 West 11th Street Drainage
15 q) Resurfacing—Street resurfacing priorities throughout the Ward
16 Section 3. The Board of Directors intends to accomplish the following list of Street and
17 Drainage Improvement Projects in Ward 2 with approximately Five Million,Three Hundred Fifteen
18 Thousand, One Hundred Forty-Two and 86/100 Dollars($5,315,142.86):
19 a) Chicot Road Improvements
20 b) Cloverdale Neighborhood Street Improvements
21 c) Reck Road Drainage from Baseline Rd to Pinecone Dr
22 d) Ackerman Dr, Esser Dr, and Lovett Dr Drainage
23 e) Tulip Road Drainage
24 f) East 59th Street Drainage from Geyer Springs Rd to Kerr Rd
25 g) 5501 Western Lane Drainage
26 h) Geyer Springs Road Drainage
27 i) Wakefield Neighborhood Drainage
28 j) Resurfacing—Street resurfacing priorities throughout the Ward
29 Section 4. The Board of Directors intends to accomplish the following list of Street and
30 Drainage Improvement Projects in Ward 3 with approximately Five Million,Three Hundred Fifteen
31 Thousand, One Hundred Forty-Two and 86/100 Dollars($5,315,142.86):
32 North Polk Street Reconstruction from G Street to F Street:
33 a) Pine Valley Sidewalk from S Terrace Rd to Durwood Rd
34 b) Maryland Avenue Reconstruction from Children's Library to
[Page 2 of 5]
1 Jefferson St
2 c) Pulaski Heights Handrail
3 d) Coolwood Drive Drainage
4 e) Capitol View Drainage
5 f) Lee Avenue and Clarkson St Drainage
6 g) North Grant Street Drainage from P St to O St
7 h) Hawthorne Rd and Van Buren Rd Drainage
8 i) B Street Drainage from Ash St to Rose St
9 j) Resurfacing—Street resurfacing priorities throughout the Ward
10 Section 5. The Board of Directors intends to accomplish the following list of Street and
11 Drainage Improvement Projects in Ward 4 with approximately Five Million,Three Hundred Fifteen
12 Thousand,One Hundred Forty-Two and 86/100 Dollars($5,315,142.86):
13 Reservoir Road Widening from Meredith Ct to Old Forge Rd:
14 a) Huron Lane Sidewalks
15 b) North Shackleford Road Sidewalk
16 c) Alvin Lane Drainage
17 d) Shawbridge Lane Drainage
18 e) El Dorado Drive Drainage
19 f) Coachlight Drive Drainage
20 g) Iowa Street Drainage from Watt St to 320 feet west
21 h) Foreman Drive Drainage
22 i) Pleasant Valley Drainage
23 j) Pleasant Forest Drainage
24 k) Black Street Drainage from Old Oak Dr to Cantrell Rd
25 1) Resurfacing—Street resurfacing priorities throughout the Ward
26 Section 6. The Board of Directors intends to accomplish the following list of Street and
27 Drainage Improvement Projects in Ward 5 with approximately Five Million,Three Hundred Fifteen
28 Thousand, One Hundred Forty-Two and 86/100 Dollars($5,315,142.86):
29 St. Charles Guardrail:
30 a) Napa Valley Drive Sidewalk
31 b) Drew Drive Reconstruction from Georgeanne Cv.to Cantrell Rd.
32 c) Napoleon Road Drainage
33 d) Taylor Loop Drainage
34 e) Pleasant Tree Cove Drainage
[Page 3 of 5]
1 f) Kirk Road and Wellington Village Road Drainage
2 g) Baronne Court Drainage
3 h) Chenal Parkway Underdrains
4 i) Resurfacing—Street resurfacing priorities throughout the Ward
5 Section 7. The Board of Directors intends to accomplish the following list of Street and
6 Drainage Improvement Projects in Ward 6 with approximately Five Million,Three Hundred Fifteen
7 Thousand, One Hundred Forty-Two and 86/100 Dollars($5,315,142.86):
8 a) Arthur Lane Reconstruction from Gamble Rd to Nix Rd
9 b) Boyle Park Road Sidewalk from Westpark Dr to S Cleveland St
10 c) 30th Street Reconstruction from Ludwig St to Malloy St
11 d) Shari Court Drainage
12 e) Vanderbilt Drive Drainage
13 f) Hiawatha Drive and Cherokee Circle Drainage
14 g) Tatum Street Drainage
15 h) Meadowbrook Drive Drainage
16 i) 30th Street Drainage from Gillman St to Potter St
17 j) John Barrow Drive Drainage
18 k) Sandlewood Drive Drainage
19 1) 34th Street Drainage from Katherine St to Boyle Park
20 m) Ware Street Drainage from Archwood Dr to 30th St
21 n) Resurfacing—Street resurfacing priorities throughout the Ward
22 Section 8. The Board of Directors intends to accomplish the following list of Street and
23 Drainage Improvement Projects in Ward 7 with approximately Five Million,Three Hundred Fifteen
24 Thousand,One Hundred Forty-Two and 86/100 Dollars($5,315,142.86):
25 Vimy Ridge Road Widening from Railroad Crossing to Alexander Rd:
26 a) Cooper Orbit and Manor Drive Drainage
27 b) West Baseline Neighborhood Drainage
28 c) David O Dodd at Shady Brook Dr Drainage
29 d) Timberside Road Drainage
30 e) South University Avenue Drainage
31 f) Java Court Drainage
32 g) Wimbledon Loop Drainage
33 h) Timberland Drive Drainage
34 i) Resurfacing—Street resurfacing priorities throughout the Ward
[Page 4 of 5]
1 Section 9. The Board of Directors intends to accomplish the following list of Street and
2 Drainage Improvement Projects considered to be of city-wide importance with approximately Four
3 Million,One Hundred Thirty-Four Thousand Dollars($4,134,000.00):
4 a) Markham Street Pedestrian Crossing Improvements
5 b) Chenal Parkway at Autumn Road Intersection Improvements
6 c) Chenal Parkway Traffic Improvements
7 d) Hilaro Springs Bridge Repairs
8 e) Bridge Repairs on 5 City-Owned Bridges
9 f) Hermitage Road Drainage Improvements
10 g) Briarwood Drainage Phase 3 Design Only
11 h) Resurfacing—Street resurfacing priorities city wide
12 Section 10. Severability. In the event any title, section, paragraph, item, sentence, clause,
13 phrase, or word of this resolution is declared or adjudged to be invalid or unconstitutional, such
14 declaration or adjudication shall not affect the remaining portions of the resolution which shall
15 remain in full force and effect as if the portion so declared or adjudged invalid or unconstitutional
16 was not originally a part of the resolution.
17 Section 11. Repealer. All laws, ordinances, resolutions, or parts of the same, that are
18 inconsistent with the provisions of this resolution, are hereby repealed to the extent of such
19 inconsistency.
20 ADOPTED: September 15,2026
21 ATTEST: APPROVED:
22
23
24 Allison Segars,City erk Frank Scott,Jr.,Mayor
25 APPROVED AS TO FORM:
26
27 •
28 Thomas M.Carpenter,City Attorney
29 //
30 //
31 //
32 //
33 //
34 //
[Page 5 of 5]