HomeMy WebLinkAbout201609663 EPIR
City of Little Rock
Department of Planning and Development
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501) 3714826 Fax: (501) 371-6863
Building Codes
OWNER AFFIDAVIT REQUESTING TEMPORARY PERMANENT CONSTRUCTION POWER
TO: ELECTRICAL INSPECTION SUPERVISOR
PERMIT NUMBER: �j� ADDRESS: `61Z —�
DATE ISSUED: 1l z�i(( EXPIRATION DATE:
This is to certify that 1, the undersigned, will not occupy the building structure located above until all
inspections are made and a "Certificate of Occupancy" is issued 1 further understand and agree that the
City of Little Rock assumes no liability or responsibility for injuries resulting from the incomplete itenas.
Section 8-102. Temporary Power Requirements (From the Little Rock City Code 1988 Revised)
Before any power is supplied to the permanent distribution systern of a building under construction, written
notice must be submitted to this office noting the length of time the temporary power will be needed before
the final electrical inspection is made, the understanding that the structure wiII not be occupied until after
the final inspection, and that the party submitting the request will assume liability of any damage incurred
as a result of disconnection of power from the building as a result of a violation of this ordinance. The time
limit on temporary power being furnished to the building will be determined on the basis of need, not to
exceed thirty (30) days. An extension of tune maybe granted on by special permission.
Ord. No. 1 S, 391, §1(11) (E), 12-9-87; Ord. No. 17,073, 1, §I -2-96.
Penalties for violation providefor the disconnection of utility services per City Code Section 8-101. City
Ordinance 1-9(c), provides a penalty of S250.00 per day for continuation of the violation.
ner or Contractor
Application Date
Electrical Supervisor
Date Approved Temporary Power Exp. Date