HomeMy WebLinkAboutZ-10316 - 14 Otter Creek MinutesJULY 16, 2026
ITEM NO. 9 Z-10316
1
File No.: Z-10316
Owners: Sanscript Enterprises LLC/Doris Smith
Applicant: Vernon Huiett (Agent)
Address: 14 Otter Creek Court
Legal Description: Lot 4, Otter Creek Business Park, Otter Creek Community,
Little Rock, Arkansas
Zoned: C-1
Present Use: Vacant
Proposed Use: Parking Lot
Variance(s) Requested: A variance from the regulations of Section 36-299(e)(1) to
allow a reduction in the front yard setback in a C-1 district.
A variance from the regulations of Section 36-510 to allow
the construction of a new parking area without interior
landscaping or portion of the perimeter screening in a C-1
district
A variance from the regulations of Section 30-45 to allow
construction of the new parking area without interior curb,
gutter and wheel stops in a C-1 district
Justification: The applicant’s justification letter was submitted with the
application.
STAFF REPORT
A. Planning and Development Civil Engineering Comments:
No Comment
B. Buffering and Landscape Comments:
No Comments
C. Building Codes Comments:
No Comments.
JULY 16, 2026
ITEM NO. 9 Z-10316
2
D. Staff Analysis:
The property located at 14 Otter Creek Court is within a predominately C-1 zoned
neighborhood, within the Otter Creek Business park subdivision. The survey
indicates the lot has a width of 319 feet and a depth of 110 feet and is currently
vacant.
The applicant is proposing to construct a new 4,098 square foot laundormat on the
west side of the property with an adjoining twenty-six (26) space parking lot.
The site plan indicates that the lot is bordered along the north perimeter by
Callagahan Creek and floodway. The Callagahan Creek flooding is shown to
extend into the property rendering greater than 40% of the lot unusable for
placement of a structure. This floodway designation also requires that an
unhindered fire access way be provided along its perimeter.
Section 36-299(e)(1) states: There shall be a front yard having a depth of not less
than twenty-five (25) feet to the front line of the building”. Therefore, the applicant
is requesting to allow a reduction in the front setback from twenty-five (25) feet to
ten (10) feet.
Section 36-510 states: The landscaping and screening requirements set forth in
chapter 15, article IV, shall be in full force and effect when erecting, constructing,
enlarging or otherwise altering any vehicular use area”. Therefore, the applicant is
requesting to allow the omission of the landscaping and screening on the north
property line, which abuts the floodway.
Section 15-97(a) states: Interior landscape areas shall comprise at least eight (8)
percent of any vehicular use area containing twelve (12) or more parking spaces.
Therefore, the applicant is requesting to allow the omission of the required interior
parking area landscape.
Section 36-45 states: When an off-street parking area adjoins public right-of-way,
inner curbing shall be provided as follows:
(1) When no sidewalk exists or is proposed in the right-of-way the inner curb may
be located on the property line.
(2) if the proposed parking is to be parallel to the right-of-way the inner curbing
may be located on the property line.
(3) If there is an existing or proposed sidewalk and the proposed parking stalls
are to be oriented into the sidewalk, the inner curbing shall be located two and
one-half (2 ½ ) feet inside the property line.
JULY 16, 2026
ITEM NO. 9 Z-10316
3
(4) The inner curb shall be at least four (4) inches in width and extend a minimum
of four (4) inches above the driving surface and a minimum of six (6) inches
below the driving surface.
(5) a reinforced precast curb or fence equivalent to this curb may be used upon
approved by planning and development.
Therefore, the applicant is requesting a variance to allow construction of the new
parking area without interior curb gutter and wheel stops along the north property
line to allow fire and rescue access.
Staff is supportive of the requested variances. Staff views the requests as
reasonable. Staff believes that due to the extremely limited useable area of the lot
that a genuine hardship exists so as to allow the property to have a viable use.
Staff agrees with the proposed location of the structure and dumpster along with
the parking layout which maximizes the limited area of the lot.
E. Staff Recommendation:
Staff recommends approval of the requested front yard setback reduction from
twenty-five (25) feet to no less than ten (10) feet.
Staff recommends approval of the request to allow the omission of the required
interior parking area landscape.
Staff recommends approval of the request to allow the omission of the required
landscaping and screen on the north perimeter of the lot which abuts the floodway.
Staff recommends approval of the request to allow construction of the new parking
area without interior curb gutter and wheel stops adjacent to the floodway
perimeter.
Subject to the following conditions:
1. A building permit must be obtained prior to construction.
2. A SFHA Development permit must be obtained prior to receipt of
construction permit.
______________________________________________________________________
Board of Adjustment (July 16, 2026)
The applicant was present. There were no objectors present.
Staff presented the application to the Board and stated it recommended
approval as per the staff report.
JULY 16, 2026
ITEM NO. 9 Z-10316
4
The item remained on the consent agenda for approval. There was a consent
motion to approve the application. The motion was seconded. The application
was approved on consent. The vote was 5 ayes and 0 nays. The motion passed.