HomeMy WebLinkAbout201913546 PPCITY OF LITTLE ROCK
DEPARTMENT OF PLANNING & DEVELOPMENT
BUILDING CODES DIVISION APPLICATION FOR:
723 WEST MARKHAM, 2ND FL MECHANICAL (HVACR) PERMIT
LITTLE ROCK, AR 72201
PHONE (501) 918-5282 OR (501) 918-5292
ER FAX: (501) 371-4546 EMAIL: permits@littlerock.gov
OFFICIAL USE ONLY
PERMIT NO. 2019
DATE ISSUE
ISSUED
INSPECTIONS
APPLICANT (Please Check)
❑ WILL CALL []ROUGH
[]SLAB ❑ FINAL
❑OTHER
INSPECTOR'S COMMENTS
PROJECT ADDRESS: y R �� PROJECT NO.:
(Same as Building Permit No.)
LEGAL DESCRIPTION: LOT` _BLOCK SUBDIVISION
OWNIRITENANT: C \S Lke\ < ,-- v1 L TELEPHONE:
ADDRESS: FAX
CONTRACTOR MA ^ r S C• LICENSE NO.: v O
ADDRESS: 1 Z?-L7 57. TELEPHONE/FAX SCJ t - - 5 I L0�
CLASS OF WORK: []NEW []ADDITION REPLACEMENT ❑ ALTERATION
PROPOSED USE (OCCUPANCY): ❑COMMERCIAL
❑ MODULARIMOBILE HOME ❑ BOILER*
SQUARE FEET: I VJO VALUATION:
Heating/Air Mac anical Permit Fees:
A New one and two-family DWELLING Construction - $.0875/sq ft (INCLUDES ROUGH & FINAL INSPECTIONS)
OTHER OCCUPANCIES
B. Replacements, repairs, alterations and additions and new commercial — heating, ventilation, ductwork, air conditioning, boilers', and refrigeration
systems shall be as follows:
$32.55 for the first $500.00 up to $1,000 plus $5.40 for each additional thousand or fraction thereof to and including $500,000.00.
• $2,727.15 for the first $500,000 plus $4.30 for each additional thousand or fraction thereof, to and including $1,000,000.
• $4,877.15 for the first $1,000,000 plus $3.25 for each additional thousand or fraction thereof
THESE PRICES INCLUDE ONLY ONE INSPECTION; ADDITIONAL INSPECTIONS ARE $21.55 EACH:
Minimum fee for any permit shall be $32.55. Additional fee for Data Processing: $5.00 (residential) $7.00 (comm.)
NO. Of Heating Units: j NO. OfAir-Conditioning Units: 1 Ductwork: Bye;— ❑ No
(ALL DUCTWORK REQUIRES A ROUGH INSPECTION)
Commercial Ventilation System Commercial Refrigeration Split System No. Of Inspections
CHECK ONE OR MOR ELOW:
[]Electric ❑ Gas Fired EfSplit System[] Package Unit ❑Water Source ❑Condenser Coil []Condenser ❑ Evaporative Coil ❑ Other (Explain)
NOTE: BOILER PERMITS ARE ISSUED WITH PROOF OF SPECIAL BOILER LICENSE
Penalties (Working without a permit): Where work for which a permit is required by the 2010 Arkansas Mechanical payment of such triple fee,shall not relieve any
person from fully complying with the requirements of the 2010 Arkansas Mechanical Code in the execution of the work nor from any penalges prescribed herein
and no additional permits shall be granted until all fees have been paid.
NOTICE: SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, GAS, PLUMBING AND HVACR WORK.
I hereby tha da a submitted o or with is application is true and correct Any deviation from information contained herein,
U e s ap o A uilding O r der this permit null and void.
�y"Ev '�'9
N URE OF CONTRACTOR, OWNER OR AGENT DATE