Civil Engineering Review Comments
Board of Adjustment ☒Planning Commission Agenda Date: 4/9/2026
Z –10083-A
7814 T st.
All documents are to be submitted to Planning and Development for complete plan check. – Will Comply
All documents shall be prepared by an Arkansas Licensed Professional Engineer. – Will Comply
Land Survey to be no older than five (5) years. – Will Comply
All documents shall be prepared based on the current Arkansas Fire Prevention Codes, City of Little Rock Municipal codes and ordinances, and current Stormwater Management and Drainage
Manual. – Will Comply
All streets to meet the current City of Little Rock Master Street Plan. – Will Comply
Any new development shall be reviewed to ensure all codes, specifications, and ordinances are met before issuing any related permits. – Will Comply
LITTLE ROCK PLANNING COMMISSION AGENDA
4/9/2026
PUBLIC WORKS ENGINEERING COMMENTS
Z-10083-A Access Village – Rev. POD, 7814 T St.
If right-of-way exists, an application should be filed to abandon the T St. right-of-way west of Watt St.; – Will Comply
Due to the proposed use of the property, the Master Street Plan specifies that Watt Street for the frontage of this property must meet commercial street standards. Dedicate right-of-way
to 30 feet from centerline; – Will Comply
With site development, provide design of street conforming to the Master Street Plan. Construct one- half street improvement to these streets including 5-foot sidewalks with planned
development. With parking allowed on both sides of Watt St. Street widening will be required with this development for on- street parking. Vehicle backing into Watt St. is not permittable.
– Will Comply
Storm water detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. Maintenance of the detention pond and all private
drainage improvements is the responsibility of the developer and/or local property owners’ association and detailed in the bill of assurance. – Will Comply
Street Improvement plans shall include signage and striping. Public Works must approve completed plans prior to construction. – Will Comply
SUBJECT: Z-10083-A – 7814 “T” Street
Revised POD ACTION: LANDSCAPE REVIEW COMMENTS DATE: APRIL 9, 2026
Site development plans, with landscape and screening, must be submitted for review, and approval, prior to site clearing and tree removal. – Will Comply
To: Romie Price Date: February 23,2026 From: Fire Marshal Derek Ingram and Captain Tony Rhodes
April 9,2026 Planning Commission Agenda Items Comment for the following Locations:
Z-10083-A Access Village - Revised POD 7814 'T' Street
Must Comply with Arkansas Fire Prevention Code 2021 edition All projects submitted for zoning approval must comply with the
Arkansas Fire Prevention Code, 2021 Edition, including any comments or requirements provided by the Little Rock Fire Marshal's Of�ice, prior to acceptance. – Will Comply
Maintain Access:
Fire Hydrants.
Maintain �ire apparatus access roads at �ire hydrant locations as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width with a hydrant. Where
a
�ire hydrant is located on a �ire apparatus access road, the minimum road width shall be 26 feet, exclusive of shoulders. – Will Comply
Grade
Maintain �ire apparatus access roads as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not exceed 10 percent
in grade except as approved by the �ire chief. If the grade exceeds 10 percent, approval will be denied and the applicant must submit request to be reviewed by Fire Chief for Approval.
– Will Comply
Loading
Maintain �ire apparatus access road design as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities, buildings or portions of
buildings hereafter constructed shall be accessible to �ire department apparatus by way of an approved �ire apparatus access road with an asphalt, concrete or other approved driving
surface capable of supporting the imposed load of �ire apparatus weighing at least 75,000 pounds. – Will Comply
Commercial and Industrial Developments – 2 means of access. - Maintain �ire apparatus access roads as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1
Section D104.1 Buildings exceeding three stories or 30 feet in height. Building or facilities exceeding 30 feet or three stories in height shall have at least two means of �ire apparatus
access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or facilities having a gross building area of more than 62,000 square feet shall be provide with two separate
and approved �ire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square feet that have a single approved �ire apparatus access road when all building are equipped throughout with approved
automatic sprinkler systems.
D104.3 Remoteness. Where two �ire apparatus access roads are required, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal
dimension of the lot or area to be served, measured in a straight line between accesses. – Will Comply
Dead Ends.
Maintain �ire apparatus access roads at dead end locations as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead Ends. Dead-end �ire apparatus access
roads in excess of 150 feet shall be provided with width and turnaround provisions in accordance with Table D103.4. Requirements for Dead-end �ire apparatus access roads. – Will Comply
Gates
Maintain �ire apparatus access road gates as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road gates. Gates securing the
�ire apparatus access roads shall comply with all of the following criteria:
Minimum gate width shall be 20 feet. – Will Comply
Gates shall be of swinging or sliding type. – Will Comply
Construction of gates shall be of material that allow manual operation by one person. – Will Comply
Gate components shall be maintained in an operable condition at all times and replaces or repaired when defective. – Will Comply
Electric gates shall be equipped with a means of opening the gate by �ire department personnel for emergency access. Emergency opening devices shall be approved by the �ire code official.
– Will Comply
Manual opening gates shall not be locked with a padlock or chain and padlock unless they are capable of being opened by means of forcible entry tools or when a key box containing the
keys to the lock is installed at the gate location. – Will Comply
Locking device specifications shall be submitted for approval by the �ire code official– Will Comply
Electric gate operators, where provided, shall be listed in accordance with UL 325. – Will Comply
Gates, intended for automatic operation shall be designed, constructed and installed to comply with requirements of ASTM F 2200. – Will Comply
LR City Comments 4/09/26
Z-10083-A – Access Village – Revised POD, 7814 T St. - All Central Arkansas Water requirements in effect at the time of request for water service must be met. – Will Comply
The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the Developer's expense.
Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas
Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire
Department is required.
If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer.
The facilities on-site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications
and
installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required.
Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must
be
installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project.
Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated with a double detector check valve assembly. If additives are used, a reduced pressure zone
backflow preventer shall be required.