Loading...
HomeMy WebLinkAbout061726 PC MinutesJune 11, 2026 ITEM NO.: 11 FILE NO.: S-867-E(11) NAME: Lot 9, Tract 1 and Lots 1-6, Tract 3, Chenal Valley - Preliminary Plat LOCATION: East side of Chenal Parkway, between La Marche Road and Chenal Valley Drive DEVELOPER: Potlatch Deltic, LLC 2 Chenal Club Blvd. Little Rock, AR 72223 OWNER/AUTHORIZED AGENT: Deltic Real Estate, LLC - owner Tim Daters - agent SURVEYOR/ENGINEER: White-Daters & Associates 24 Rahling Circle Little Rock, AR 72223 AREA: 41.98 acres NUMBER OF LOTS: 7 FT. NEW STREET: 1,400 L.F. WARD: 5 CURRENT ZONING: O-2, C-1 and C-3 VARIANCE/WAIVERS: None requested A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT: The applicant proposes to subdivide 41.98 acres of property into seven (7) lots for future office and commercial development. B. EXISTING CONDITIONS: The property is currently undeveloped and mostly wooded. June 11, 2026 ITEM NO.: 11 (Cont.) FILE NO.: S-867-E(11) 2 C. NEIGHBORHOOD NOTIFICATIONS: All owners of property abutting the site and all neighborhood associations registered with the City of Little Rock were notified of the public hearing. D. ENGINEERING COMMENTS (PLANNING DIVISION): 1. All documents shall be prepared based on the current Arkansas Fire Prevention Codes, City of Little Rock Municipal codes and ordinances, and current Stormwater Management and Drainage Manual. 2. All streets to meet the current City of Little Rock Master Street Plan. 3. Any new development shall be reviewed to ensure all codes, specifications, and ordinances are met before issuing any related permits. ENGINEERING COMMENTS (PUBLIC WORKS): 1. The nose of the proposed median should not extend beyond the projection of the back of existing sidewalk crossing the proposed street. 2. Due to the curvature of Chenal Valley Drive, provide a letter prepared by a registered engineer certifying the intersection sight distance at the intersection(s) comply with the latest version of the AASHTO Green Book standards. 3. A franchise permit is required to be issued by the City of Little Rock for any private improvements proposed to be placed within the right-of- way, islands and medians. 4. The proposed Lamarche Road shall be constructed to the Master Street Plan standards as a commercial collector with sidewalks on both sides. E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING: Little Rock Water Reclamation Authority: Submit Plans for sewer. Entergy: No comments received. Summit Utilities: No comments. AT & T: No comments received. Central Arkansas Water: NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. June 11, 2026 ITEM NO.: 11 (Cont.) FILE NO.: S-867-E(11) 3 Fire Department: Must Comply with Arkansas Fire Prevention Code 2021 edition All projects submitted for zoning approval must comply with the Arkansas Fire Prevention Code, 2021 Edition, including any comments or requirements provided by the Little Rock Fire Marshal's Office Maintain Access: Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet, exclusive of shoulders. Grade Maintain fire apparatus access roads as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not exceed 10 percent in grade except as approved by the fire chief. If the grade exceeds 10 percent, approval will be denied and the applicant must submit request to be reviewed by Fire Chief for Approval. Loading Maintain fire apparatus access road design as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds. Commercial and Industrial Developments – 2 means of access. - Maintain fire apparatus access roads as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D104.1 Buildings exceeding three stories or 30 feet in height. Building or facilities exceeding 30 feet or three stories in height shall have at least two means of fire apparatus access for each structure. Section D104.2 Building exceeding 62,000 square feet in area. Buildings or facilities having a gross building area of more than 62,000 square feet shall be provide with two separate and approved fire apparatus access roads. Exception: Projects having a gross building area of up to 124,000 square feet that have a single approved fire apparatus access road when all building are equipped throughout with approved automatic sprinkler systems. D104.3 Remoteness. Where two fire apparatus access roads are required, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal dimension of the lot or area to be served, measured in a straight line between accesses. June 11, 2026 ITEM NO.: 11 (Cont.) FILE NO.: S-867-E(11) 4 30’ Tall Buildings - Maintain aerial fire apparatus access roads as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D105.1 – D105.4 D105.1 Where Required. Where the vertical distance between the grade plane and the highest roof surface exceed 30’, approved aerial fire apparatus access roads shall be provided. For the purposes of this section the highest roof surfaces shall be determined by measurement to the eave of a pitched roof, the intersection of a roof to the exterior wall, or the top of the parapet walls, whichever is greater. D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed with of 26’, exclusive of shoulders, in the immediate vicinity of the building or portion thereof. D105.3 Proximity to building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. D105.4 Obstructions. Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. Other obstructions shall be permitted to be places with the approval of the fire code official. Dead Ends. Maintain fire apparatus access roads at dead end locations as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with width and turnaround provisions in accordance with Table D103.4. Requirements for Dead-end fire apparatus access roads. Gates Maintain fire apparatus access road gates as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road gates. Gates securing the fire apparatus access roads shall comply with all of the following criteria: 1. Minimum gate width shall be 20 feet. 2. Gates shall be of swinging or sliding type. 3. Construction of gates shall be of material that allow manual operation by one person. 4. Gate components shall be maintained in an operable condition at all times and replaces or repaired when defective. 5. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. June 11, 2026 ITEM NO.: 11 (Cont.) FILE NO.: S-867-E(11) 5 6. Manual opening gates shall not be locked with a padlock or chain and padlock unless they are capable of being opened by means of forcible entry tools or when a key box containing the keys to the lock is installed at the gate location. 7. Locking device specifications shall be submitted for approval by the fire code official 8. Electric gate operators, where provided, shall be listed in accordance with UL 325. 9. Gates, intended for automatic operation shall be designed, constructed and installed to comply with requirements of ASTM F 2200. Parks and Recreation: No comments received. County Planning: No comments received. F. BUILDING CODES/LANDSCAPE: Building Codes: No comments received. Landscape: No comments received. G. TRANSPORTATION/PLANNING: Rock Region Metro: No comments received. Planning Division: Land Use Plan: The request is in Planning District 19, the Chenal Planning District. The development principles of the district include developing roads for all modes of transportation, and the preservation of greenways, open spaces, and significant environmental features. The Land Use Plan shows Office (O) and Neighborhood Commercial (NC) for the application area. The Office (O) category represents services provided directly to consumers (e.g., legal, financial, medical) as well as general offices which support more basic economic activities. The Neighborhood Commercial (NC) category includes limited small-scale commercial development near a neighborhood, providing goods and services to that neighborhood market area. To the north of the application area is area designated for Office (O) uses and is characterized by undeveloped woodlands and Little Rock Fire Station 21. East of the application area is area designated for Residential High Density (RH) uses and June 11, 2026 ITEM NO.: 11 (Cont.) FILE NO.: S-867-E(11) 6 is characterized by an apartment complex. South of the application area is area designated for Commercial (C) uses and is characterized by a bank, a sit- down restaurant, two strip office building, and a hotel. West of the application area, across from Chenal Parkway, is area designated for Residential Low Density (RL) and Park/Open Space (PK/OS) uses and are characterized by single -family residences and the Chenal Country Club Golf Course. The subject site is in the Chenal/Financial Center Design Overlay District (Ord. 16861). The purpose of the Chenal/Financial Center Design Overlay District is to create a scenic parkway by removing utility infrastructure and by controlling signage and lighting and to use the existing master street and land use plans to ensure a well-designed corridor. Master Street Plan: Chenal Valley Drive is a Collector on the Master Street Plan. Collectors are designed to connect traffic from Local Streets to Arterials or to activity centers, with the secondary function of providing access to adjoining property. The standard Right of way is 60’. Sidewalks are required on one side of Collectors. This street may require dedication of right-of-way and may require street improvements. Chenal Parkway is a Principal Arterial on the Master Street Plan. Principal Arterials are roads designed to serve through traffic, and to connect major traffic generators or activity centers within urbanized areas. The standard Right of way of 110 feet is required. Sidewalks are required on both sides. This street may require dedication of right-of-way and may require street improvements. Bicycle Plan: Chenal Valley Drive is on the Master Bike Plan as a Proposed Class III Bike Route. Class III Bike Routes require no additional right -of-way, but either a sign or pavement marking to identify and direct the route. Chenal Parkway is on the Master Bike Plan as a Proposed Class I Bike Route. Class I Bike Routes are routes designated for the sole use of bicycles that are physically separated from vehicular lanes. Historic Preservation Plan: The application, as shown, should have no effect on identified historic resources. H. ANALYSIS: June 11, 2026 ITEM NO.: 11 (Cont.) FILE NO.: S-867-E(11) 7 The applicant proposes to subdivide 41.98 acres of property into seven (7) lots for future office and commercial development. The property is zoned O-2, C-1 and C- 3. The property is located along the east side of Chenal Parkway, between La Marche Road and Chenal Valley Drive. The property is currently undeveloped and mostly wooded. The applicant is proposing the following seven (7) lots: Lot 9, Tract 1 - 7.91 acres (C-3) Lot 1, Tract 3 - 2.92 acres (C-3) Lot 2, Tract 3 - 2.87 acres (C-1 & C-3) Lot 3, Tract 3 - 2.71 acres (C-1) Lot 4, Tract 3 - 6.98 acres (C-1 & O-2) Lot 5, Tract 3 - 7.52 acres (C-1 & C-3) Lot 6, Tract 3 - 8.96 acres (O-2) The remainder of LaMarche Road will be constructed between Chenal Parkway and Chenal Valley Drive with this project. Several of the lots will have street frontage along LaMarche Road and Chenal Valley Drive. There will be a private street running between Lot 1, Tract 3 and Lot 5, Tract 3, which will serve as internal cross-access between these lots. All the proposed lots will have 25-foot building lines along the LaMarche Road and Chenal Valley Drive frontages and 50-foot building lines along the Chenal Parkway Frontage. All the proposed lots will conform with the minimum lot area and size requirements found in Sections 36-280, 36-299 and 36-301 of the City's Zoning Ordinance. The applicant plans to grade the lots with the construction of LaMarche Road. This will allow the balancing of the cuts and fills throughout the site. All required stormwater/drainage information for a preliminary plat must be submitted to the engineering division prior to a grading permit being issued. Staff is supportive of the requested preliminary plat. The applicant is requesting no variances with this request. I. STAFF RECOMMENDATION: Staff recommends approval of the requested preliminary plat, subject to compliance with the comments and conditions outlined in paragraphs D and E, and the staff analysis, of the agenda staff report. June 11, 2026 ITEM NO.: 11 (Cont.) FILE NO.: S-867-E(11) 8 PLANNING COMMISSION ACTION: ( June 11, 2026 ) The applicant was present. There were no objectors present. The application was placed on the Consent Agenda for approval as recommended by staff. There was a motion to approve the Consent Agenda. The motion passed by a vote of 11 ayes, 0 nays, 0 absent. The application was approved.