Loading...
HomeMy WebLinkAboutDrainage Report 013126WHITE - DATERS & ASSOCIATES, INC. 24 Rahling Circle Little Rock, Arkansas 72223 Phone; 501-821-1667 www.whitedaters.com Preliminary D_, rainage Report October 22, 2025 Cottages at Carter Lane Project Descrilltion The Cottages at Carter lane is a single-family residential subdivision. It includes 23 residential lots and 2 tracts for drainage and detention on 5 acres. The project currently has a single-family residence, asphalt drives and a detached carport and storage shed. The project is divided by an unnamed tributary to Taylor Loop Creek. The predominate gradient on the site is from south to north with approximately 6 feet of fall across the site, with an average slope of 2%. The western portion of the site generally drains to the unnamed tributary, the eastern portion of the site drains to the unnamed tributary and to east along the eastern boundary of the project. A well-defined ridge or hump runs along the northern side of the project. This is a fill constructed in association with a long -abandoned railroad constructed to haul timber from the area to the Arkansas River. The top of the fill is significantly higher than the adjacent overbank area along the tributary. Slopes on the site are typically 2% to 5% sloping to the north and the unnamed tributary to Taylor Loop Creek. The proposed Preliminary Plat is attached as Exhibit A. Owner Carter Lane Properties LLP 24 Rahling Circle Little Rock, Arkansas 72223 501-821-1667 _Developer Carter Lane Properties LLP 24 Rahling Circle Little Rock, Arkansas 72223 501-821-1667 Engineer Timothy E. Daters. P.E. White-Daters & Associates 24 Rahling Circle, Little Rock, AR 72223 501-821-1667 Address 4809 Carter Lane Little Rock, Arkansas 72223 W PWMWNW A Existing Conditions The developed Subdivision, Madison Valley is East of this project. At present the adjacent lots in Madison Valley experience moderate flooding in the rear yards during extreme storm events. The City of Little Rock has proposed multiple projects to correct this. Thus far, no work has been completed by the City of Little Rock. Plans considered by the City of Little Rock have included; 1. A cut-off ditch west of and adjacent to the western edge of Madison Valley with an overflow on the north into the existing unnamed tributary. 2. Construction of a earthen berm west of Madison Valley to confine the flow in the unnamed tributary and prevent full bank over flows from flowing eastward into Madison Valley. 3. Lowering the 48" diameter between lots 47 & 48, Madison Valley. Madison Valley was constructed in 2004. The Final Plat was recorded in 2005, attached as Exhibit B. Based on a review of the construction plans provided by the City of Little Rock, the storm drainage system appears to be designed to accommodate the 10-year storm event. A cursory review of the drainage system would indicate that portions of the system are inadequate for even the 10-year design event. Plans are attached as Exhibit C. Existing Area Drainage Problems Yard flooding has been reported along the Western side of Madison Valley. The western side of Madison Valley is lower than the top bank of the Eastern Tributary to the west of Madison Valley. When flows in the unnamed tributary exceed the capacity of the shallow natural channel, they flow into the eastern overbank area and north along the western lot lines in Madison Valley. The abandoned rail road embankment interrupts overbank flow and pushed the flow to the east towards Madison Valley. The existing 48" storm drain in the Northwest Corner of Madison Valley is inadequate for the flow in the overbank area adjacent to the creek. Yards in the Southwest corner of Madison Valley, adjacent to Carter Lane Estates are also subject to flooding for local rainfall. They are not impacted by out of channel flow in the unnamed tributary. Approximately 2,500 feet to the north of this project on Glenn Valley Drive existing culverts and ditches are overtopped during extreme rain fall events. Proposed Improvements Plans call for the subdivision to be constructed in three phases. Phase 1 includes lots in the vicinity of Carter Lane. be constructed to access Phase 1. Phase 2 includes improvements to the western limit of the unnamed tributary to Taylor Loop Creek. Phase 3 includes the Tributary crossing and the lots on the east side of the Tributary. The Preliminary Drainage 2 w D A Map for this project is attached as Exhibit D. Design Methodology Unnamed Tributary Tributary flow rates are based on design flows for Chenal Valley Phase 31 and Carter Lanes Estates. Time of Concentration was calculated using TR-55. Curve Numbers are based on current and future land use and are consistent with those in the Little Rock Drainage Manual. Basins, Sub -Basins and Detention Facilities were modeled using the Soil Conservation Service method (SCS). Hydrological modeling was completed using Hvdraflow Hydrogra hs Extension for Autodesk® Civil 31)® by Autodesk, Inc. v2025 Within the Subdivision Storm water runoff rates will be computed with the Rational Method. Stormwater Detention will be calculated with the Simplified Volume Method as per the 2018 Little Rock Storm Drainage Manual. Storm drains and inlets will be designed using Hydroflow Storm Sewers. The Old Cottage Lane crossing of the unnamed tributary is detailed in Appendix E. Hydraulic Analysis of the post construction channel is detailed in Appendix F. Minimum finish floor elevations for 8 through 17 will be established and shown on the Construction Plans and the Final Plat. Finish floor elevations will be a minimum of 1 foot above the 100- year event water surface elevation. To minimize overtopping flow during the 100-year event (1,159 CFS) a 23-foot wide, 6- foot-tall opening was modeled. Inlet depth is 6.86 feet (100 Yr) and 4.93 feet (25 Yr) with only 4.32 CFS overflowing the crossing and into the street. Any overflows will follow the minor north -south street to the north where overflows would re-enter the tributary channel. As noted, finish floor elevations on Lots 9-14 would be at least 1 foot above the street gutter elevation on the high side of the lots. Preliminary Plans indicate a 100 year water surface elevation of approximately 329 on the high side of Old Cottage Lane. As noted in Appendix F, the hydraulic gradient will likely increase at 0.50% to 1.00% upstream of the crossing. Finish floor elevations on 15, 16 & 17 would be expected to be in the range of 332 to 333. The unnamed tributary will be modeled with HEC-RAS to establish 100 year water surface elevations as part of the final design process. Tributary flows will be contained within the street ROW and adjacent yards along Old Cottage Cove, they will not flow eastward towards Madison Valley. 3 W D A Predevelopment/Post Development SumM&a Predevelopment discharges for the 5-acre project are detailed in Appendix G. Post Development discharges for the 5-acre development are detailed in Appendix H. Detention volume required will be determined by the Simplified Volume Method as noted earlier. Adequate areas for stormwater detention are available in Tract A and on the rear of lots 5-8 if necessary. Architectural stone features may be constructed adjacent to the main channel of the tributary to provided additional detention. Hydraulic Analvsi5 of 10 foot wide V Ditches Small V Ditches are proposed at three locations in the subdivision. The northern ditch cuts off flow from developed lots I through 8 and directs storm runoff to the unnamed tributary. This ditch drains Sub Area #4 with a total area of 0.5 acres. This ditch is approximately 400 feet long and will have a minimum longitudinal slope of 0.50%. Discharge from this ditch on the east end will be approximately 2 cubic feet per second for the 10-year event. This ditch provides positive drainage for lots 1 through 8, and protects the downgradient property. The eastern ditch cuts off flow from developed lots 9 through 14 and directs storm runoff to the existing 48" inch storm drain. This ditch drains Sub Area 45 of this project with a total on site area of 0.4 acres. This ditch is approximately 330 feet long and will have a minimum longitudinal slope of 1.30%. Discharge from this ditch on the north end will be approximately 2 cubic feet per second for the I0-year event. This ditch provides positive drainage for lots 9 through 14 and protects the existing lots in Madison Valley to the east. Property owners in Madison Valley will be allowed to direct storm water in their rear yards to this ditch which will be in a platted easement adjacent to the rear lot lines in Madison Valley. Flow into this ditch from Madison Valley rear yards will likely exceed flows from this project. The northern ditch cuts off flow from developed lots 17 through 23 and directs storm runoff to the unnamed tributary. This ditch drains Sub Area # 1 with an on -site area approximately 120 feet wide and 300 feet long, with an area of 0.8 acres. This ditch is approximately 300 feet long and will have a minimum longitudinal slope of 1.00%. Discharge from this ditch on the east end will be approximately 3 cubic feet per second for the I0-year event. This ditch provides positive drainage for lots 17 through 23. The detention facility on the upgradient development will intercept flow from the developed lots in Carter Lane Estates. 11 WI D' A Discussions pending with the Owner/Developer of the lots in Carter Creek Cove Estates (CCCE). If the grading and drainage improvements in are modified to benefit CCCE and Madison Valley, a storm drain with inlets may be constructed from the NE corner of CCCE to the 48" storm drain described earlier in Madison Valley. The proposed ditch would be replaced by a storm drain with surface inlets at appropriate intervals. Storm Water Pollution Prevention Plan & Erosion Control A Storm Water Pollution Prevention Plan (SWPPP) will be prepared and will be submitted to the Arkansas Department of Environmental Quality to obtain a Notice of Coverage. The SWPPP will be implemented and monitored in accordance with the plan. A Notice of Termination will be filed when sufficient areas of the site have been permanently stabilized. A three phase Erosion Control Plan has been prepared and is pending approval by the City of Little Rock prior to any land alteration activities. 404 Permitting A Wetlands and Waters of the United States delineation will be completed to determine is the unnamed tributary is jurisdictional. Any necessary permits for the Corps of Engineers will be secured to disturbance of any jurisdictional WOUS. Attachments Exhibit A Cottages at Carter Lane Preliminary Plat Exhibit B Madison Valley Final Plat Exhibit C Madison Valley Construction Plans Exhibit D Sketch Drainage Map — Cottages at Carter Lane Exhibit E Bridge/Culvert Analysis — Old Cottage Lane Exhibit F Channel Analysis Exhibit G PreDevelopment Hydrographs Exhibit H Post Development Hydrographs Exhibit I V Ditch Analysis Exhibit J Carter Lane Estates Preliminary Plat Exhibit K Carter Lane Estates Construction Plans Exhibit L Rinke Analysis Exhibit M Carter Creek Cove Estates Final Plat Exhibit N Chenal Valley Phase 31 Detention Analysis Exhibit O Chenal Valley Phase 31 Construction Plans 5 W D A CERTIFICATION I, Timothy E. Daters, Registered Professional Engineer No. 5033 in the State of Arkansas, hereby certify that the preliminary drainage designs and specifications contained in this Preliminary Report have been prepared by me, or under my responsible supervision, in accordance with the regulations of the City of Little Rock, Arkansas, the Professional Engineers Registration Act of the State of Arkansas, and reflect the application of generally accepted standards of engineering practice for preliminary design. I understand that review of these preliminary plans is limited to general compliance with the City codes and regulations and does not warrant the engineer's design or imply any liability to the City of Little Rock for the designs contained herei Timothy E. Daters, P.E. Date n Carter Lane Unnamed Tributary