Preliminary D_, rainage Report October 22, 2025
Cottages at Carter Lane
Project Descrilltion
The Cottages at Carter lane is a single-family residential subdivision. It includes 23
residential lots and 2 tracts for drainage and detention on 5 acres. The project currently has a
single-family residence, asphalt drives and a detached carport and storage shed. The project
is divided by an unnamed tributary to Taylor Loop Creek. The predominate gradient on the
site is from south to north with approximately 6 feet of fall across the site, with an average
slope of 2%. The western portion of the site generally drains to the unnamed tributary, the
eastern portion of the site drains to the unnamed tributary and to east along the eastern
boundary of the project.
A well-defined ridge or hump runs along the northern side of the project. This is a fill
constructed in association with a long -abandoned railroad constructed to haul timber from
the area to the Arkansas River. The top of the fill is significantly higher than the adjacent
overbank area along the tributary.
Slopes on the site are typically 2% to 5% sloping to the north and the unnamed tributary to
Taylor Loop Creek.
The proposed Preliminary Plat is attached as Exhibit A.
Owner Carter Lane Properties LLP
24 Rahling Circle
Little Rock, Arkansas 72223
501-821-1667
_Developer Carter Lane Properties LLP
24 Rahling Circle
Little Rock, Arkansas 72223
501-821-1667
Engineer Timothy E. Daters. P.E.
White-Daters & Associates
24 Rahling Circle, Little Rock, AR 72223
501-821-1667
Address 4809 Carter Lane
Little Rock, Arkansas 72223
W
PWMWNW
A
Existing Conditions
The developed Subdivision, Madison Valley is East of this project. At present the adjacent
lots in Madison Valley experience moderate flooding in the rear yards during extreme storm
events. The City of Little Rock has proposed multiple projects to correct this. Thus far, no
work has been completed by the City of Little Rock.
Plans considered by the City of Little Rock have included;
1. A cut-off ditch west of and adjacent to the western edge of Madison Valley with an
overflow on the north into the existing unnamed tributary.
2. Construction of a earthen berm west of Madison Valley to confine the flow in the
unnamed tributary and prevent full bank over flows from flowing eastward into
Madison Valley.
3. Lowering the 48" diameter between lots 47 & 48, Madison Valley.
Madison Valley was constructed in 2004. The Final Plat was recorded in 2005, attached as
Exhibit B. Based on a review of the construction plans provided by the City of Little Rock,
the storm drainage system appears to be designed to accommodate the 10-year storm event.
A cursory review of the drainage system would indicate that portions of the system are
inadequate for even the 10-year design event. Plans are attached as Exhibit C.
Existing Area Drainage Problems
Yard flooding has been reported along the Western side of Madison Valley. The western side of
Madison Valley is lower than the top bank of the Eastern Tributary to the west of Madison
Valley. When flows in the unnamed tributary exceed the capacity of the shallow natural channel,
they flow into the eastern overbank area and north along the western lot lines in Madison Valley.
The abandoned rail road embankment interrupts overbank flow and pushed the flow to the east
towards Madison Valley.
The existing 48" storm drain in the Northwest Corner of Madison Valley is inadequate for the
flow in the overbank area adjacent to the creek.
Yards in the Southwest corner of Madison Valley, adjacent to Carter Lane Estates are also
subject to flooding for local rainfall. They are not impacted by out of channel flow in the
unnamed tributary.
Approximately 2,500 feet to the north of this project on Glenn Valley Drive existing culverts and
ditches are overtopped during extreme rain fall events.
Proposed Improvements
Plans call for the subdivision to be constructed in three phases. Phase 1 includes lots in the
vicinity of Carter Lane. be constructed to access Phase 1. Phase 2 includes improvements to
the western limit of the unnamed tributary to Taylor Loop Creek. Phase 3 includes the
Tributary crossing and the lots on the east side of the Tributary. The Preliminary Drainage
2
w
D
A
Map for this project is attached as Exhibit D.
Design Methodology
Unnamed Tributary Tributary flow rates are based on design flows for Chenal Valley Phase 31
and Carter Lanes Estates. Time of Concentration was calculated using TR-55. Curve Numbers
are based on current and future land use and are consistent with those in the Little Rock Drainage
Manual. Basins, Sub -Basins and Detention Facilities were modeled using the Soil Conservation
Service method (SCS). Hydrological modeling was completed using Hvdraflow Hydrogra hs
Extension for Autodesk® Civil 31)® by Autodesk, Inc. v2025
Within the Subdivision Storm water runoff rates will be computed with the Rational
Method. Stormwater Detention will be calculated with the Simplified Volume Method as per the
2018 Little Rock Storm Drainage Manual. Storm drains and inlets will be designed using
Hydroflow Storm Sewers.
The Old Cottage Lane crossing of the unnamed tributary is detailed in Appendix E.
Hydraulic Analysis of the post construction channel is detailed in Appendix F. Minimum
finish floor elevations for 8 through 17 will be established and shown on the Construction
Plans and the Final Plat. Finish floor elevations will be a minimum of 1 foot above the 100-
year event water surface elevation.
To minimize overtopping flow during the 100-year event (1,159 CFS) a 23-foot wide, 6-
foot-tall opening was modeled. Inlet depth is 6.86 feet (100 Yr) and 4.93 feet (25 Yr) with
only 4.32 CFS overflowing the crossing and into the street. Any overflows will follow the
minor north -south street to the north where overflows would re-enter the tributary channel.
As noted, finish floor elevations on Lots 9-14 would be at least 1 foot above the street gutter
elevation on the high side of the lots. Preliminary Plans indicate a 100 year water surface
elevation of approximately 329 on the high side of Old Cottage Lane. As noted in Appendix
F, the hydraulic gradient will likely increase at 0.50% to 1.00% upstream of the crossing.
Finish floor elevations on 15, 16 & 17 would be expected to be in the range of 332 to 333.
The unnamed tributary will be modeled with HEC-RAS to establish 100 year water surface
elevations as part of the final design process. Tributary flows will be contained within the
street ROW and adjacent yards along Old Cottage Cove, they will not flow eastward
towards Madison Valley.
3
W
D
A
Predevelopment/Post Development SumM&a
Predevelopment discharges for the 5-acre project are detailed in Appendix G.
Post Development discharges for the 5-acre development are detailed in Appendix H.
Detention volume required will be determined by the Simplified Volume Method as noted
earlier.
Adequate areas for stormwater detention are available in Tract A and on the rear of lots 5-8
if necessary. Architectural stone features may be constructed adjacent to the main channel of
the tributary to provided additional detention.
Hydraulic Analvsi5 of 10 foot wide V Ditches
Small V Ditches are proposed at three locations in the subdivision.
The northern ditch cuts off flow from developed lots I through 8 and directs storm runoff to
the unnamed tributary. This ditch drains Sub Area #4 with a total area of 0.5 acres. This
ditch is approximately 400 feet long and will have a minimum longitudinal slope of 0.50%.
Discharge from this ditch on the east end will be approximately 2 cubic feet per second for
the 10-year event. This ditch provides positive drainage for lots 1 through 8, and protects the
downgradient property.
The eastern ditch cuts off flow from developed lots 9 through 14 and directs storm runoff to
the existing 48" inch storm drain. This ditch drains Sub Area 45 of this project with a total
on site area of 0.4 acres. This ditch is approximately 330 feet long and will have a minimum
longitudinal slope of 1.30%. Discharge from this ditch on the north end will be
approximately 2 cubic feet per second for the I0-year event. This ditch provides positive
drainage for lots 9 through 14 and protects the existing lots in Madison Valley to the east.
Property owners in Madison Valley will be allowed to direct storm water in their rear yards
to this ditch which will be in a platted easement adjacent to the rear lot lines in Madison
Valley. Flow into this ditch from Madison Valley rear yards will likely exceed flows from
this project.
The northern ditch cuts off flow from developed lots 17 through 23 and directs storm runoff
to the unnamed tributary. This ditch drains Sub Area # 1 with an on -site area approximately
120 feet wide and 300 feet long, with an area of 0.8 acres. This ditch is approximately 300
feet long and will have a minimum longitudinal slope of 1.00%. Discharge from this ditch
on the east end will be approximately 3 cubic feet per second for the I0-year event. This
ditch provides positive drainage for lots 17 through 23. The detention facility on the
upgradient development will intercept flow from the developed lots in Carter Lane Estates.
11
WI
D'
A
Discussions pending with the Owner/Developer of the lots in Carter Creek Cove Estates
(CCCE). If the grading and drainage improvements in are modified to benefit CCCE and
Madison Valley, a storm drain with inlets may be constructed from the NE corner of CCCE
to the 48" storm drain described earlier in Madison Valley. The proposed ditch would be
replaced by a storm drain with surface inlets at appropriate intervals.
Storm Water Pollution Prevention Plan & Erosion Control
A Storm Water Pollution Prevention Plan (SWPPP) will be prepared and will be submitted to
the Arkansas Department of Environmental Quality to obtain a Notice of Coverage. The
SWPPP will be implemented and monitored in accordance with the plan. A Notice of
Termination will be filed when sufficient areas of the site have been permanently stabilized.
A three phase Erosion Control Plan has been prepared and is pending approval by the City of
Little Rock prior to any land alteration activities.
404 Permitting
A Wetlands and Waters of the United States delineation will be completed to determine is the
unnamed tributary is jurisdictional. Any necessary permits for the Corps of Engineers will be
secured to disturbance of any jurisdictional WOUS.
Attachments
Exhibit A
Cottages at Carter Lane Preliminary Plat
Exhibit B
Madison Valley Final Plat
Exhibit C
Madison Valley Construction Plans
Exhibit D
Sketch Drainage Map — Cottages at Carter Lane
Exhibit E
Bridge/Culvert Analysis — Old Cottage Lane
Exhibit F
Channel Analysis
Exhibit G
PreDevelopment Hydrographs
Exhibit H
Post Development Hydrographs
Exhibit I
V Ditch Analysis
Exhibit J
Carter Lane Estates Preliminary Plat
Exhibit K
Carter Lane Estates Construction Plans
Exhibit L
Rinke Analysis
Exhibit M
Carter Creek Cove Estates Final Plat
Exhibit N
Chenal Valley Phase 31 Detention Analysis
Exhibit O
Chenal Valley Phase 31 Construction Plans
5
W
D
A
CERTIFICATION
I, Timothy E. Daters, Registered Professional Engineer No. 5033 in the State of Arkansas,
hereby certify that the preliminary drainage designs and specifications contained in this
Preliminary Report have been prepared by me, or under my responsible supervision, in
accordance with the regulations of the City of Little Rock, Arkansas, the Professional
Engineers Registration Act of the State of Arkansas, and reflect the application of generally
accepted standards of engineering practice for preliminary design. I understand that review of
these preliminary plans is limited to general compliance with the City codes and regulations
and does not warrant the engineer's design or imply any liability to the City of Little Rock for
the designs contained herei
Timothy E. Daters, P.E. Date
n
Carter Lane Unnamed Tributary