HomeMy WebLinkAboutPC Minutes 082125August 14, 2025
ITEM NO.: 17 FILE NO.: Z-10128-A
NAME: Orndorff #1 – PD-R
LOCATION: SEC of E. 21st Street & Bragg Street
DEVELOPER:
Mike Orndorff
609 E. 16th Street
Little Rock, AR 72202
OWNER/AUTHORIZED AGENT:
GarNat Engineering (Agent)
PO Box 116
Bryant, AR 72015
SURVEYOR/ENGINEER:
GarNat Engineering
PO Box 116
Bryant, AR 72015
AREA: 0.16 acre NUMBER OF LOTS: 5 FT. NEW STREET: 0 LF
WARD: 1 PLANNING DISTRICT: 8 CENSUS TRACT: 46
CURRENT ZONING: R-4
A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT:
The applicant is proposing to rezone a 0.16 acre site from R-4 to PD-R. The
property is proposed to be replatted into five (5) separate lots that will contain a 5-
unit, attached multi-family residential development. The applicant will not reside
on the property and intends to market each unit for lease/sale in the future.
B. EXISTING CONDITIONS:
Properties surrounding the site contain a mixture of zoning and uses in all
directions.
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
2
C. NEIGHBORHOOD NOTIFICATIONS:
All owners of property located within 300 feet of the site and all neighborhood
associations registered with the City of Little Rock were notified of the public
hearing.
D. ENGINEERING COMMENTS (PLANNING DIVISION):
1. Drives may not exceed 40% of the lot width.
2. Contact Planning and Development Dept., Engineering Division at 501-371-
4817 or at 501-918-5348 for inspections of any work in the public right-of-way
prior to placement of concrete or asphalt or for on-site clarification of
requirements prior to commencing work. Failure to do so can result in removal
of any improperly placed concrete or asphalt at the expense of the owner or
contractor.
3. Hauling of cut and/or fill material on or off project sites over municipal streets
require approval prior to a grading permit being issued. Contact Public Works
Traffic Engineering at 621 S. Broadway 501-379-1800 with any questions or
for more information.
4. Damage to public and private property due to hauling operations or operations
of construction related equipment from a construction site shall be repaired by
the responsible party prior to the issuance of a certificate of occupancy.
ENGINEERING COMMENTS (PUBLIC WORKS): No comments.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority:
1. Please submit plans to evaluate sewer capacity
Entergy: No comments received.
Summit Utilities: No comments.
AT & T: No comments received.
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
3
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and Little Rock Fire Department is
required.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZ) is required on the domestic water
service. This assembly must be installed prior to the first point of use. Central
Arkansas Water (CAW) requires that upon installation of the RPZA, successful
tests of the assembly must be completed by a Certified Assembly Tester
licensed by the State of Arkansas and approved by CAW. The test results must
be sent to CAW's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project.
6. Fire sprinkler systems which do not contain additives such as antifreeze shall
be isolated with a double detector check valve assembly. If additives are used,
a reduced pressure zone backflow preventer shall be required.
Fire Department:
1. Full Plan Review
F. BUILDING CODES/LANDSCAPE:
Building Codes:
As per 2021 Arkansas Fire Prevention Code Volume III R302.1(1) Single Family
Dwellings have the following requirements when dealing with Dwellings that are
closer than 7’ from the property line: If the soffit assembly extends inside of 5’ from
the property line, it must be constructed with fire treated materials. 5/8” Type “X”
Drywall, stucco, fire treated plywood or some other fire treated material on
underside of the soffit, fire treated fascia, elimination of soffit vents and gable vents
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
4
and crawl space vents on the affected portion of the wall. Note: Vents must be
relocated to ensure proper venting of the attic space.
Exceptions to this are to fire block this section of the exterior wall
from the top plate to the underside of the roof decking and to fire
caulk the blocking at all joints.
Townhomes require installation as per posted document on LR.gov.
a. Townhouse Construction as per City of Littlerock and 2021 AFPC
Townhouse Construction Requirements for the City of Little Rock, Arkansas
1. Framing Requirements:
a. All Townhomes shall be constructed with 2-Hour Fire Barrier Wall extending
through the roof and exterior walls or from the slab to the roof deck and front
walls with a 1-Hour extension on both sides of the wall for 48” on the walls
and 48” on the roof structure.
i. Doors must be fire rated if they are installed in the wall.
ii. Overhead doors are not allowed to be installed in the fire rated wall
section listed above.
b. 2-Hour Fire Barrier Walls shall be independently constructed from all roof
and floor loads and must remain standing throughout a fire event. No
framing members are allowed to pass through the fire wall.
c. No power, gas, sewer, water, phone, security wiring, is allowed to be
installed in the 2-Hour fire barrier walls. No exceptions.
d. 2-Hour wall must extend out into the soffit to the back of the sub-fascia and
down to the bottom of the soffit.
e. Soffit Vents must be broken 48” from each side of the 2-hour fire barrier
wall.
f. Ridge Vents must be broken 48” from each side of the 2-hour fire barrier
wall.
2. Utilities:
g. Electrical
i. Separate Electrical Services are required. Each unit must have its
own separate electric meter and disconnecting means on the outside
of the unit.
ii. No electrical allowed in 2-hour fire barrier walls.
h. Water
i. A single water meter is allowed but water must enter each unit from
the outside with a water box / valve / union assembly before entering
the unit.
ii. Each unit requires its own water heater.
i. Sanitary Sewer
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
5
i. A single sanitary sewer service is allowed in units that are leased to
the occupants.
ii. Each unit individually owned must have its own sanitary sewer
service.
iii. Each unit individually owned where the yard is also owned must have
its own individual sanitary service on the property under ownership.
iv. Cleanouts required at the entry and exit from the building.
j. Natural Gas
i. A single natural gas meter is allowed in buildings that are leased to
the occupants or units where the building unit is owned but not the
yard.
ii. Gas Service must enter each unit from the outside and have a shutoff
on the outside of each unit.
iii. Each unit individually owned where the yard is also owned must have
its own natural gas service meter and service. Services must be
contained within each individual yard.
k. HVAC
i. All units must have their own designated HVAC System. No sharing
within the overall building or yard area.
NOTE: A site utility plan is required for all townhouse construction.
NOTE: Townhouse construction requires separately derived utility services for
Electrical, Water, Sanitary Sewer, Natural Gas and HVAC with all systems
contained in front / back yard building lines extending to a shared utility easement.
NOTE: If Townhouse Units cannot comply with utility requirements they are
classified as condominiums and are required to have fire sprinkler installations
throughout and are allowed to be separated by 1-hour fire walls.
Landscape: No comments received.
G. TRANSPORTATION/PLANNING:
Rock Region Metro: No comments received.
Planning Division:
The request is in the Central City Planning District, District 8. The development
principles for this district include encouraging infill development, encouraging
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
6
neighborhood oriented commercial uses; and improving street and drainage
facilities. The Land Use Plan shows Residential Low (RL) density use for the
requested area. The Residential Low (RL) density use category provides for single
family homes at densities not to exceed 6 dwelling units per acre. Such residential
development is typically characterized by conventional single family homes but
may also include patio or garden homes and cluster homes, provided that the
density remains less than 6 units per acre. The application is for a Planned
Development-Residential.
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
7
To the east, south and west of the application is Residential Low (RL) use
characterized by single-family homes, with four vacant lots to the south. Across E
21st Street to the north is an area of Mixed Use (MX) use with a vacant hotel. The
Mixed Use (MX) category provides for a mixture of residential, office and
commercial uses to occur.
This site is not located in an Overlay District.
Master Street Plan:
E. 21st Street and Bragg Street are designated as Local street on the Master
Street Plan. Local Streets are roads designed to provide access to adjacent
property with the movement of traffic being a secondary purpose. The standard
Right-of-way is 50’. Sidewalks are required on one side. This street may require
dedication of right-of-way and may require street improvements.
E. 21st Street and Bragg Street, at this location, have approximate right-of-ways of
60 feet. Currently, on-street parking is allowed on both sides of the E. 21st and
Bragg Street.
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
8
Bicycle Plan:
E. 21st Street and Bragg Street are not shown on the Master Bike Plan with
existing or proposed facilities in this area.
Historic Preservation Plan:
The subject site is across E. 21st Street from the Red Carpet Inn (PU8884), located
at 2020 Vance Street. The Red Carpet Inn was constructed in 1974 and listed on
the National Register of Historic Places on January 6, 2025. Designed by White,
Pillert and Associates in the International style, the structure is significant for its
role in African American history. It was built as the largest venture undertaken by
a Black business group in Arkansas and organized by Dr. Jewell, a progressive
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
9
political leader trying to offer a better avenue for his constituents in a still-racially
divided post-Civil Rights South. The Historic Preservation Plan advocates for
increased effectiveness and coordination with the review of development plans.
Staff advocates that the proposed rehabilitation of the site consider its potential
adverse impacts to adjacent historic sites. Staff finds the infill proposal will not
adversely affect the existing historic fabric and context of the area.
H. ANALYSIS:
The applicant is proposing to rezone a 0.16 acre site from R-4 to PD-R. The
property is proposed to be replatted into five (5) separate lots that will contain a 5-
unit, attached multi-family residential development. The applicant will not reside
on the property and intends to market each unit for lease/sale in the future.
Properties surrounding the site contain a mixture of zoning and uses in all
directions.
The building will contain five (5), two-story, single-family units. Each unit will be
1,320 square feet in area with a patio along the north property line facing E. 21st
Street.
Section 36-502 requires one (1) parking space for each unit for the proposed
development. The applicant’s response to required off-street parking states “lots
are wide enough to support street parking.” Staff does not support the parking
plan and suggests that the applicant provide off-street parking as required by code.
The site plan shows the building will have a twenty-one (21) foot setback from the
west property line, eight (8) feet from the east property line, five (5) feet from the
north property line and ten (10) feet from the south property line.
The building shall not exceed thirty-five (35) feet in height.
The applicant notes typical building materials will include asphalt shingles, a brick
façade with the three (3) sides being vinyl siding.
The applicant did not provide a response to staff regarding the maintenance of
common areas, if any, and required landscaping on the property.
The applicant notes that a dumpster will not be placed on the site for trash
collection and that standard city trash pick-up be utilized. If a dumpster is placed
on the site at any time in the future, it must be screened and comply with Section
36-523 of the City’s Zoning Ordinance.
Site lighting must be low-level and directed away from adjacent properties
August 14, 2025
ITEM NO.: 17 (Cont.) FILE NO.: Z-10128-A
10
The applicant is not proposing any signs at this time. Any future signs placed on
the property must comply with Section 36-551 of the City’s Zoning Ordinance
(signs permitted in residential one – and two – family zones).
Staff does not support the proposed PD-R rezoning. Although the proposed
development will not be out of character with the development pattern in the area,
staff feels that the proposed site development is overdeveloped in a manner that
will not allow the development to comply with off-street parking typically required
by code. Although the parking plan will create a minor increase in traffic, staff feels
that the proposed parking plan may have an adverse impact on the surrounding
properties, general city services and emergency vehicles that may need to access
property along the right of way.
I. STAFF RECOMMENDATION:
Staff recommends denial of the requested PD-R rezoning.
PLANNING COMMISSION ACTION: (AUGUST 14, 2025)
The applicant was present. There were no persons registered in opposition. The
applicant presented their proposal for a 5-unit, attached multi-family residential
development. The Commission raised concerns of the trash storage for each unit.
After some discussion there was a motion at the request of the Planning
Commission to defer the application until the September 11, 2025 Planning
Commission meeting so that a revised site plan could be provided. The applicant
agreed. There was a second. The vote was (10) ayes, (0) nays and (1) absent.
The motion passed. The application was deferred until September 11, 2025.