Loading...
HomeMy WebLinkAbout031226 PC MinutesMarch 12, 2026 ITEM NO.. 13 FILE NO.: Z-7838-A NAME: Benbran Storage — Conditional Use Permit LOCATION: Immediately south of 4111 S. University Avenue DEVELOPER: Benbran, LLC 10809 Executive Center Drive, Suite 100 Little Rock, AR 72211 OWNER/AUTHORIZED AGENT: Benbran, LLC (Owner) Phillip Lewis (Applicant) SURVEYOR/ENGINEER: Phillip Lewis Engineers, Inc. 23620 1-30 Bryant, AR 72022 AREA: 7.39 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF E-D CURRENT ZONING: C-3 VARIANCE/WAIVERS: None requested. A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT: The applicant requests a conditional use permit to allow a mini- warehouse/commercial development on the C-3 zoned property located immediately south of 4111 S. University Avenue. B. EXISTING CONDITIONS: The property is currently undeveloped. Some site work has taken place in preparation for future development. March 12, 2026 ITEM NO.: 13 (Cont.) FILE NO.: Z-7838-A C. NEIGHBORHOOD NOTIFICATIONS: All owners of property located within 300 feet of the site and all neighborhood associations registered with the City of Little Rock were notified of the public hearing. D. ENGINEERING COMMENTS PLANNING DIVISION: 1. Grading Permit will be required. 2. ADA Access shall be shown to the Right -of -Way. 3. Handicap Parking shall include one van stall 11ft wide with a 5ft minimum aisle. 4. Contact Planning and Development Dept., Engineering Division at 501-371- 4817 or at 501-918-5348 for inspections of any work in the public right-of-way prior to placement of concrete or asphalt or for on -site clarification of requirements prior to commencing work. Failure to do so can result in removal of any improperly placed concrete or asphalt at the expense of the owner or contractor. 5. Hauling of cut and/or fill material on or off project sites over municipal streets require approval prior to a grading permit being issued. Contact Public Works Traffic Engineering at 621 S. Broadway 501-379-1800 with any questions or for more information. 6. Damage to public and private property due to hauling operations or operations of construction related equipment from a construction site shall be repaired by the responsible party prior to the issuance of a certificate of occupancy. 7. Any new development shall be permitted and receive all reviews to ensure all codes, specifications, and ordinances are met. ENGINEERING COMMENTS (PUBLIC WORD No comments. E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING: Little Rock Water Reclamation Authority: No comments received. Entergy: No comments received. Summit Utilities: No comments. AT & T: No comments received. Central Arkansas Water: 2 March 12, 2026 ITEM NO.: 13 (Cont.) FILE NO.: Z-7838-A 1. Provide a 10' utility easement on the West side of the property adjoining University Avenue. 2. All Central Arkansas Water requirements in effect at the time of request for water service must be met. 3. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. 4. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. 5. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. 6. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. 7. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. 8. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. 9. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated with a double detector check valve assembly. If additives are used, a reduced pressure zone backflow preventer shall be required. t1 March 12, 2026 ITEM NO.: 13 Cont. FILE NO.: Z-7838-A Fire Department: Must ComDIV with Arkansas Fire Prevention Code 2021 edition All projects submitted for zoning approval must comply with the Arkansas Fire Prevention Code, 2021 Edition, including any comments or requirements provided by the Little Rock Fire Marshal's Office, prior to acceptance. Maintain Access: Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet, exclusive of shoulders. Grade Maintain fire apparatus access roads as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not exceed 10 percent in grade except as approved by the fire chief. If the grade exceeds 10 percent, approval will be denied and the applicant must submit request to be reviewed by Fire Chief for Approval. Loading Maintain fire apparatus access road design as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds. Commercial and Industrial Developments — 2 means of access. - Maintain fire apparatus access roads as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D104.1 Buildings exceeding three stories or 30 feet in height. Buildings or facilities exceeding 30 feet or three stories in height shall have at least two means of fire apparatus access for each structure. rd March 12, 2026 ITEM NO.: 13 (Cont. FILE NO.: Z-7 Section D104.2 Building exceeding 62,000 square feet in area. Buildings or facilities having a gross building area of more than 62,000 square feet shall be provided with two separate and approved fire apparatus access roads. Exception: Projects having a gross building area of up to 124,000 square feet that have a single approved fire apparatus access road when all buildings are equipped throughout with approved automatic sprinkler systems. D104.3 Remoteness. Where two fire apparatus access roads are required, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal dimension of the lot or area to be served, measured in a straight line between accesses. 30' Tall Buildings - Maintain aerial fire apparatus access roads as per Appendix 'D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D105.1 — D105.4 D105.1 Where Required. Where the vertical distance between the grade plane and the highest roof surface exceeds 30', approved aerial fire apparatus access roads shall be provided. For the purposes of this section the highest roof surfaces shall be determined by measurement to the eave of a pitched roof, the intersection of a roof to the exterior wall, or the top of the parapet walls, whichever is greater. D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the building or portion thereof. D105.3 Proximity to building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. D105.4 Obstructions. Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. Other obstructions shall be permitted to be placed with the approval of the fire code official. Dead Ends. Maintain fire apparatus access roads at dead end locations as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 5 March 12, 2026 ITEM NO.: FILE NO.: Z-7838-A feet shall be provided with width and turnaround provisions in accordance with Table D103.4. Requirements for Dead-end fire apparatus access roads. Gates Maintain fire apparatus access road gates as per Appendix D of the 2021 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road gates. Gates securing the fire apparatus access roads shall comply with all of the following criteria: 1. Minimum gate width shall be 20 feet. 2. Gates shall be of swinging or sliding type. 3. Construction of gates shall be of material that allow manual operation by one person. 4. Gate components shall be maintained in an operable condition at all times and replace or repaired when defective. 5. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. 6. Manual opening gates shall not be locked with a padlock or chain and padlock unless they are capable of being opened by means of forcible entry tools or when a key box containing the keys to the lock is installed at the gate location. 7. Locking device specifications shall be submitted for approval by the fire code official 8. Electric gate operators, where provided, shall be listed in accordance with U L 325. 9. Gates, intended for automatic operation, shall be designed, constructed and installed to comply with requirements of ASTM F 2200. Parks and Recreation: No comments received. County Planning: No comments received. F. BUILDING CODES/LANDSCAPE: Building Codes: No comments received. C. March 12, 2026 ITEM NO.: 13 (Cont.) FILE NO.: Z-7838-A Landscape: Section 15-84 Developments with fewer than one hundred fifty (150) parking spaces shall have: (1)Single-trunk trees with a minimum caliper of two (2) inches measured twelve (12) inches above grade at planting; or 0(2) Multitrunk trees with a minimum of three (3) canes with a minimum caliper of one (1) inch each measured twelve (12) inches above grade at planting. 15.96 states that: A perimeter planting strip is required along any side of a vehicular use area that abuts adjoining property or the ri ht-of-wa y of any street, highway or freeway. This strip shall be at least nine (9) feet wide. 15-95 states: Where development which requires screening abuts land use of a more restrictive nature at least eighty (80) percent of the view of the vehicular use area and parked vehicles shall be screened so as to not be visible when viewed from the adjacent property. A wooden fence may satisfy sixty-five (65) percent of the requirement and evergreen trees may be used to satisfy the balance. 15-95(4) states that screening standards are intended to apply during all seasons of the year. A minimum of fifty (50) percent of the trees and a minimum of seventy-five (75) percent of the shrubs to be used for screening purposes shall be evergreen varieties. Sec. 15-96. - Perimeter planting strips. (a)A perimeter planting strip is required along any side of a vehicular use area that abuts adjoining property or the right-of-way of any street, highway or freeway. This strip shall be at least nine (9) feet wide. The perimeter planting strip adjacent to freeways or expressways shall be at least thirty (30) feet wide except within mature areas. (b)Trees shall be planted with an average linear spacing of not less than thirty (30) feet within the required landscape or buffer area. Three (3) shrubs or vines for every thirty (30) linear feet shall be planted in the perimeter planting strip. Massing is permitted as long as trees are spaced not more than one hundred (100) linear feet apart including width of driveway. (d) Where a fence or wall is utilized in a perimeter planting strip, the fence or wall shall be constructed with the face toward the adjacent property with any supporting structural members screened from view of the adjoining property. 15.97 (a) Interior landscape areas shall comprise at least eight (8) percent of any vehicular use area containing twelve (12) or more parking spaces. 7 March 12, 2026 ITEM NO.: 13 (Cont. FILE NO.: Z-7838-A (b)ln order to apply toward the required eight (8) percent landscape area, the minimum size of an interior landscape area shall be one hundred fifty (150) square feet for developments with one hundred fifty (150) or fewer parking spaces. 15.98 (b)One (1) tree and four (4) shrubs shall be planted in the building landscape areas for each forty (40) linear feet of vehicular use area abutting the building. (c)For buildings greater than forty (40) feet in height at least one-third ('/3) of the trees to be placed in the building landscape area shall be of a species with a mature height greater than thirty (30) feet. Sec. 15-100. - Protection of landscaping. (a) Raised concrete curbing or other approved devices shall be placed around the base of each landscaped area to protect plantings from automobile and pedestrian traffic. Such curbing should be offset two (2) feet from planting areas abutting parked vehicles in order to protect plantings from vehicle front end overhang and vehicle doors opening into planter areas. (b) The soil within the landscape areas shall be properly prepared prior to plant installation in accordance with acceptable horticultural practices. (c) Massing of shrubs is permitted only in mulch beds and not in grass or turf areas. (d) An irrigation system shall be required for developments of one (1) acre or larger. Developments of less than one (1) acre shall have a water source within seventy-five (75) feet of the plants to be irrigated. Consult Zoning Code 15-87 for allowable trees. Planning Division: Land Use Plan: The request is in Planning District 9, the 1-630 Planning District. The development principles of this district are to preserve the residential character of the area and isolate the non-residential use to specific locations without affecting adjacent neighborhoods. The Land Use Plan shows Commercial (C) and Park/Open Space (PK/OS) for the application area. The Commercial (C) category includes a broad range of retail and wholesale sales of products, personal and professional services, and general business activities. Commercial activities vary in type and scale, depending on the trade area that they serve. The Park/Open Space (PK/OS) category includes all public parks, recreation facilities, greenbelts, flood plains, and other designated open space and recreational land. The application is for a Mini - Storage Facility. 0 March 12, 2026 ITEM NO.: 13 (Cont. FILE NO.: Z-i To the north of the application area is area designated for Commercial (C) uses and is characterized by restaurants and strip commercial buildings. South of the application area is area designated for Park/Open Space (PK/OS) uses and is characterized by the floodplain of Fourche Creek. Farther south across Fourche Creek is area designated for Commercial (C) uses and is characterized by commercial buildings and a grocery store. West and northwest of the application area are areas designated for Mixed Use (MX) uses and are characterized by restaurants, a theater, a gym, office buildings, and strip commercial buildings. This site is not located in an Overlay District. Master Street Plan: South University Avenue is a Principal Arterial on the Master Street Plan. Principal Arterials are roads designed to serve through traffic, and to connect major traffic generators or activity centers within urbanized areas. The standard Right of way of 110 feet is required. Sidewalks are required on both sides. This street may require dedication of right-of-way and may require street improvements. Bicycle Plan: South University Avenue is on the Master Bike Plan as a Proposed Class II Bike Lane. Class II Bike Lanes provides a portion of the pavement for the sole use of bicycles. Historic Preservation Plan: The application area is south of the site of El Porcellino, a restaurant in a commercial strip building. This site has not been identified eligible or ineligible for the National Register of Historic Places, though it has been assigned a resource number. The application, as shown, should have no effect on identified historic resources. H. Analysis: The applicant requests a conditional use permit to allow a mini- warehouse/commercial development on the C-3 zoned property located immediately south of 4111 S. University Avenue. The property is currently undeveloped. Some site work has taken place in preparation for future development. A portion of the property, along the south property line and at the southeast corner of the property, is located in the floodway. The proposed site plan shows a required twenty-five (25) foot easement for maintenance of the floodway area. 0 March 12, 2026 ITEM NO.: 13 Cont. FILE NO.: Z-7838-A The proposed development will have a single access point from S. University Avenue. Cross -access is being proposed between this development and the existing development to the north. The applicant is proposing a 9,000 square foot single story building within the west half of the property, along the S. University Avenue frontage. This building will be a multi -tenant commercial building. The building setback and height will comply with ordinance standards. The building will contain C-3 permitted uses. A total of thirty-nine (39) parking spaces is proposed for the commercial building. Section 36-502 requires a minimum of thirty (30) parking spaces for the multi - tenant building. The proposed parking complies with the code. A total of five (5) mini -warehouse buildings will be located within the east half of the property. The buildings will range in size from 6,000 square feet to 16,000 square feet. The largest northernmost building will be for climate controlled storage. The other four (4) buildings will be for traditional mini -storage. An office for the mini -warehouse development will be located in the climate controlled building. There will be six (6) parking spaces for the mini -warehouse development. Staff believes the parking will be sufficient. The middle portion of the overall property will be a compacted gravel area. This area will be used for the storage of vehicles, RV's and trailers. Proposed hours of operation for the mini -warehouse development will be 6:OOam to 10:00pm, seven days a week. The office will be open Monday -Saturday, 8:OOam to 6:OOpm. All dumpster areas must be screened as per Section 36-523 of the City's Zoning Ordinance. Any fencing must comply with Section 36-516. All signage must comply with Section 36-555. Screening must be provided along the east property line, as allowed based on the location of the floodway. All site lighting must be low-level and directed away from adjacent properties. 10 March 12, 2026 ITEM NO.: 13 (Cont. FILE NO.: Z-78 Staff is supportive of the requested CUP to allow a commercial development. The proposed development will be consistent with the development pattern along S. University Avenue. There are many other properties along S, University Avenue which contain C-4 uses and are zoned C-4. I. STAFF RECOMMENDATION: Staff recommends approval of the requested conditional use permit, subject to compliance with the comments and conditions outlined in paragraphs D, E and F, and the staff analysis, of the agenda staff report. PLANNING COMMISSION ACTION: (March 12, 2026) The applicant was present. There were no objectors present. The application was placed on the Consent Agenda for approval as recommended by staff. There was a motion to approve the Consent Agenda. The motion passed by a vote of 7 ayes, 0 nays, 3 absent and 1 open position. The application was approved. 11