HomeMy WebLinkAboutResponse to Comments 111225City of Little Rock Planning and Development Department
Attention: Mr. Torrance Thrower and Ms. Amelia Goldman
tthrower@littlerock.gov | agoldman@littlerock.gov
From: Ryan Brooks, Apex Professional Construction
Re: Z-10234 – Applicant Responses to Development Staff and Other Department Comments
Date: November 7, 2025
Dear Mr. Thrower and Ms. Goldman,
Please find below our combined responses to the Development Staff and Other Department comments
for the Apex Duplexes Conditional Use Permit (Z-10234).
Responses to Development Staff Comments
1. Will duplex units be for sale or lease/rent?
The duplex units are always underwritten as “for sale.” If any units do not sell, they will be rented
out.
2. Will the duplex building contain one or two stories?
Each duplex building will be one story.
3. The building shall not exceed thirty-five (35) feet in height.
Understood. The proposed duplexes are single-story structures and will not exceed 35 feet in height.
4. Provide description of building materials.
The buildings will be constructed on a concrete slab foundation. The exterior siding will be
predominantly board and batten vinyl siding, with the potential for some brick accents on portions of
the building.
5. Will the duplex building contain a deck, patio area, etc.?
No, the duplexes will not include a deck or patio area.
6. How will trash be collected?
Each individual unit will have its own trash bin and recycle can for collection.
7. All lighting must be low-level and directed away from adjacent properties.
Understood. All lighting will be low-level and directed away from adjacent properties.
8. Any fence or wall erected must comply with Section 36-516 of the City’s Zoning Ordinance.
Understood. Any fencing or walls constructed will fully comply with Section 36-516 of the City’s
Zoning Ordinance.
9. Submit revised site plans as per meeting with Civil Engineering on November 6, 2025.
Understood. The revised site plans will be submitted in a separate document as discussed.
Responses to Other Department Comments
Civil Engineering Review Comments
We met as requested and discussed parking locations. A solution was agreed upon by all parties, and
this updated design is shown on the revised site plans.
Based on the meeting outcome, no alley improvements will be made. Therefore, a plan showing alley
improvements to city standards will not be provided.
Following the meeting discussions, parking will be located at the front of the duplex units. There will
be no rear-access parking on any of the buildings.
Public Works Engineering Comments
Elam Street is classified on the Master Street Plan as a residential street. A dedication of right-of-way
25 feet from centerline will be required.
This requirement will be adhered to.
Landscape Review Comments
No specific comments were provided. Acknowledged. Any landscaping or screening requirements will
comply with applicable city codes.
Building Code Comments
The Building Code section noted no specific comments. Acknowledged.
Fire Marshal Comments
The Fire Marshal requires compliance with the Arkansas Fire Prevention Code, 2021 Edition. The
project will comply fully with the Arkansas Fire Prevention Code (2021).
Central Arkansas Water Comments
Central Arkansas Water indicated no objections to the proposed project. Acknowledged. All CAW
requirements in effect at the time of service request will be met.
Summit Utilities Comments
Summit Utilities had no objections. Acknowledged.
We appreciate the feedback from all departments and have incorporated the required adjustments into
the revised site plans. Please contact us if further information or clarification is needed.
Sincerely,
Ryan Brooks
Apex Professional Construction