Loading...
HomeMy WebLinkAbout200108706 EELECTRICAL PERMIT CITY OF LITTLE ROCK DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING CODES DIVISION PERMIT NUMB :200108706 r ISSUE DATE: 10/02/01 EXPIRATION DATE: 10/02/02 PERMISSION IS HEREBY GIVEN TO: CONTRACTOR: ARNOLD & BLEVINS* OWNER: MT ZION BAPTIST CHURCH TO PERFORM THE FOLLOWING WORK: NATURE OF WORK: CLASS OF WORK: ADD VALUATION: 0 SQ FT: 0 JOB DESCRIPTION: NEW TOILER AND REDO ELEVATOR*MISC,4INSP,40OPEN* **ADD TP, INSP** PROJECT NUMBER: A200105949 AT THE FOLLOWING LOCATION: LOT/BLOCK/SUBDIVISION: ADDRESS: 906 CROSS ST TO BE USED AS(OCCUPANCY): **COMMERCIAL This permit is issued on the express condition that the above work shall conform in all respects to the statements certified to in the application for such permit, and that all work shall be done in accordance with all applicable zoning, building, electrical, plumbing and mechanical ordinances of the City of Little Rock and the State of Arkanses. I or we further agree to abide by the applicable conditions as printed in the permit card. I or we further certify that we have read and understand the requirements of this permit and that all statements made by us in securing this permit are true and complete to the best of our knowledge. Permit Fee: 110.50 DATA PROC 1 4 TOTAL: 4.50 Issued By: ONEAL FOR: Licensed Contractor or Owner CHARLES G. GIVENS Building Official ELECTRICAL PERMIT CITY OF LITTLE ROCK DEPARTMENT OF PLANNING AND DEVELOPMENT BUILDING CODES DIVISION PERMIT NUMBER:200108706 ISSUE DATE: 10/02/01 EXPIRATION DATE: 10/02/02 PERMISSION IS HEREBY GIVEN TO: CONTRACTOR: ARNOLD & BLEVINS* OWNER: MT ZION BAPTIST CHURCH TO PERFORM THE FOLLOWING WORK: NATURE OF WORK: CLASS OF WORK: ADD VALUATION: 0 SQ FT: 0 JOB DESCRIPTION: NEW TOILER AND REDO ELEVATOR*MISC,4INSP,40OPEN* PROJECT NUMBER: A200105949 AT THE FOLLOWING LOCATION: LOT/BLOCK/SUBDIVISION: ADDRESS: 906 CROSS ST 1 TO BE USED AS(OCCUPANCY): **COMMERCIAL This permit is issued on the express condition that the above work shall conform in all respects to the statements certified to in the application for such permit, and that all work shall be done in accordance with all applicable zoning, building, electrical, plumbing and mechanical ordinances of the City of Little Rock and the State of Arkanses. I or we further agree to abide by the applicable conditions as printed in the permit card. I or we further certify that we have read and understand the requirements of this permit and that all statements made by us in securing this permit are true and complete to the best of our knowledge. Permit Fee: 77.50 DATA PROC 4.00 TOTAL: 81.50 Licensed Contractor or Owner Issued By: ONEAL FOR: CHARLES G. GIVENS Building Official dCT-30-01 10:58 AM P.01 OWNER AFFIDAVIT FOR REQUESTING TI=MPORARY CONSTRUCTION POWER TO: CHIEF ELECTRICAL INSPECTION SUPERVISOR PERMIT NO..2-ooI08770ra DATE ISSUED: ADDRESS: !sljSS EXPIRATION DATE: This is to certify that I, the undersigned, will not occupy the building structure located above until all inspections are made and a Certificate of Occupancy is issued. 1 further understand and agree that the City of Little Rack assumes no liability or responsibility for injuries resulting from the incomplete items. Section 8-102. Temporary power requirements. Before any power is supplied to the permanent electrical distribution system of a building under construction, written notice must be submitted to the Electrical Inspections Supervisor noting the length of time the temporary power will be needed before the final electrical inspection is made, the understanding the structure will not be occupied until after the final inspection and that the party submitting the request will assume liability of any damage incurred as a result of disconnection of power from the building as a result of a violation of this article. The time limit on temporary power being furnished to the building will be determined on the basis of need, not to exceed thirty {= days. An extension of time may be granted only by special permission and requested in writing. (Ord. No. 15,391, S 1(11 xE), 12-9-87 Penalties for violatlon provide for the disconnection of utility services per City Code Sections 8-101 and 8-476. Additionally, City Ordinance 1-9(c) provides a penalty of $250.00 per day for continuation of the violation. r 0 her or Contractor OCT-30-01 TUE 11:54 AM FROM: TO:PERMIT--DESK PAGE 1 -A LR la � . City of Little Rock =� � ..`...n' Builtfing Codes Division NOTICE OF ADDITIONS or "'®ORRECTIONS DO NOT REMOVE JOB ADDRESS DfITIE ' THIS JOB HAS NOT BEEN COMPETED The following additions or corrections shell be made before the, job will be accepted L- og�Gs li1�I> .ss i •� -y � Lam{ rxa 7— �.`%? II is unlawful for any Carpenter. Contractor, Builder, or other persons, to cower or cause to tie covered, any pars of ine work. with flooring lalh, earth or other malarial, unlit Iha proper in5pecior has had ample time to approve the installation. After additions or corrections have been made, call 371-4826 Building Deparimeni for an inspection. Field in5pector5 are in the office from 7.30 a.m. to 9:00 a.m. Monday through Friday. PLUMBING ;'ITY of LITTLE ROCK BUILDING CODES ELE 723 WEST MARKHAM. 2ND FLOOR BLDG LITTLE ROCK, AR. 722CI PRESS HARD -USE BALL POINT PEN ;CT--90-01 10:56 AM � c l a %J C- a.- . . bEP;aFMi I�NT" ©F PLANNING a DEVELOPMENT AUILt ING COIat;S DIVISION 723 wEs-r NSAP.KHAM, 2110 FLQ 11 LITTLI: a CK, AFR 72201 7 cAFtCIAL 415E ONL t \ P5.RN11i Noi DATE ISSUES Issu=_0 By A P;4 FeeadY E7 Slat] ROugh P.01 ,f 4-- APFLICAnON FOR: „t ELECTRICAL Pr;RMIT PRCTIONS INSPECTOR'S COMMENTS !" c nease check o WilI Call - - tier �7 PROJECT AOORESS: PROJECT NO.: LECAL 0ESCRIPTiON: LOT BLOCK •SLIBOIVI VON aut t r fii , 1 - 0�VN= J-i ENANT: U TELEPHONE: k07F=55: }r N /y ..y SE �0CRE=S: 4 worth Little Rock, AR 72115 'rL5PHON=; 140 :LAs31 O NON A001; ION C F.:PAIR" I- ►i;W?0RARY E3 COEG ❑ FL4R ROrC5E7 GE=-(GCGUFFNG'ti: CI��41�ytE=C{.0.L ❑ R-SiG&N-MAL IO R EAL F 7: {j QTY L'M T I5QU=ARE UNIT r1Nr t COST CESCT! ?T;0ti 0 e CCSi D33CR,rTi0N 0'Y CCSi 1. CC; i�i=? N", R- S13.00 17. R L14C c 1:: DATA FROC33VIiC 2. CC„ST ,MIr?. - I 1:.00 I -is. OR'-vt I � 1 �� � SPSCIAL ClicurTS 4. MFIMR LCCP Ar.'Ct:'L LOOP LOAD CeYTZ:S S. OF Tr, 6a AMO 8. LIP TO 15a f htA 9. UP TO2CO•AMp 10. 2 _'7 +r EA- I COA ia" �0 � 19. CISrOS.�L 12.00 ! Z0. DIS�'tlA5si8R 8.0G 21. VEN-MCCO 122. T!As ► CCI :PAC-r. 740 14.C'0 2=1 30M 4.50 M❑T4R W1RE 1i. u? TO ; lip G.00 12. 2 - a pp 7.0 i3. S • ;❑ Frp l 10.50 1S- i 1 • i5 Pp 13.50 15. 13.20 P 1650 le. 21 + r1P 20.00 r hQ.y 'f certify that tha data tto lF riatiorr cont2fnad h =• s»aAXATE ra s.cc 31. 20.30 AMP d.Cc' aL 31 • so AMP I 4.00 34.INS-75C1Cti5 ELECT e71C C AITRAL HWI 23. 1-1 S WN 24. 16 - 25 iC H _ 25. MY"n1Na ELa HEAT 29. RATE{ FA'i HEAT 27. WATER HEATER 28. WEAUST PAN 29. GeiLING-FANS 30. SrG.V WEININCS 135. 1.14 5.50 133. '11.20 9. 50 137. 21.40 4.00 1 3B. 41. 60 4.00 j 3S. 41.60 1:,CQ 40. 81- JCa 4.00 41. 101.200 4.t0 42.201-Soo 11CO F43.3o1.40 44. MR M 2.5 OVErZ 400 •b;mind crj'Gr lrllth this application is true and correct Any devIstlOn frOM L-r1less approved by the auNdlnQ Off1dai wni render this QerrrrlCltull and void. RXqujRmD Fort GAS, Frt,t M31HG AND HVAC W DRX �A ����_d M-0 a^0 13.CO 13.00 Sao ICUO 17ro' 22M . 46.00 sm B6 N . &CO •OCT-30-01 TUE 11 : 53 AM FROM: TO: PERMIT -DESK PAGE 1 OCT-02-01 08:30 AM� P.01 WITY PF: LITt L-, 4'"J" �EPARTNIt:N', OF pLANNINC & I)EVELOPMENT APPLICATION FOR: RUILDINO COJ3r:5 A)VISION �* 723 Ws"J- rjAF.KHAM� 2ND FLOOR `ELECTRICAL t`,rll�' lr _ITTLr= ROCK, AR 7220'1 3}i: (501) 37-1-4826 r-= (501) 371-6865 oFnCfA4 V$EONLY INSPECTIONS INSPI±CTOWS COMMENTS pER, Irr No. APPLI (Please check,,") 23 0 --SOD _/_b_ of AA ea © will call DA►E ISSUED �I�� d Li S-1a5' - Cl a ISSU❑ SY lJ���- - RCi[Ig �ROJGCi ADDRESS: � 55 PRO1ECi NO:�pp60 4�: Q �'u3me as a Qitfgw GAL DESCRIPTION: LOT . BLOCK 'SUSOMSION 74VN�?GyAN% . G � C rr� T6tEPFIONIr: kDOPESS: :Q�NT ACTOR: /�rrc?�-3 svl�s ?;w��ric 61 LIC;i55 NO.: m 5' North LittleRack, AR 72115 TELEPHONE: :ASS OP WORX. ❑ Neiv ADI71 i I.ON Q R45PA1R D 7��I1-dR�RY d CI gG FIRS �zonsw Us- (OCCUPANCY); CQMI4iE�C1.AL C2 Rc5I0V- JTIAL 0 R:!ITAL SQUAB: Feel: C_SC= IF s iopi QTY L'Nm I UHIT COST CESCR!P T eN QTY I Cov, C'SSCRIF_JI jc m QTY UNri Cos; 1. C-11;=T MTR. CWNF.R $1:,Cr7 'I7. R�+tiIG� " iO.Cn i OAiF PROCiSaliiC 2. CCNS7 *ATR - � 1:.00 IS. - DRYER I 42C4 ! SPSCt:,L CIRC1475 3. i lg-nP. PERMANENT� 18.1114 19. cis�oSA� � � a.m � 31. 70. 30 A,�aP 650 d. fdFr;R LOOP � 12.00 � 20. 01 kWA5'r.;R i � 4.00 31 31- 60 AMP � 8.50 S. =:, AODML LOOP 9.00 21. Vri00G 3� 4.O0 133. MISC. LOAD CIEN-EnS 22. TRjd_ct-i COMPACT. 440 I $C. lNS?9CrCN5 15.00 S. UP 70 ea V,4 7.00 � � GPSi'iiNGS 7. UP TO 'ICO AMP � I 14,00 � 27 9CMIC C=?` T AL HEAT � 35. 1- 40 Lm 2. UP TC150AIMP 1 2100 23. 1-"ISW 5 5-3 136. '11. 20 �L 10,00 9. UP To 2CO'Amp 30,00 24. 16-25 XW 930 37. 21.40' 1750 10. 2CQ+MA,'ICOA 4.50 25. MTWNO ELE 4.00, 38. 41.60 ?.ZSC . M dY0 R WiRf 25. BATH FA WHEAT 4.00 39. 61 + 80 5650 11. UP TO HP 4.00 1 27. WATSR HEATER 12.001 40. 81-100 28� 1i, 2.4 HP 7.00 29. E -AUSf FAN a.ao 41. i01+200 46:00 13, 5- ;0 HP 10.50 29. CEIUNO-FAN5 4.CC 42. 201.300 44. i1+Islip 13.50 se. S;Gi1 13.0d 43_301+A00 66 50 15. 1 B - 20 Y.p 18,50 44. FOR FA. 23 CVER400 4.00 16. 3 i t lip20.Cd �� -�iGr � .�� I here4•{ Cer-Ll lnf(7rm that the data subrr =sd an'or with thLs ap 1lattan is true and cQrr Ct AiSY dCV19 3Oez iioRi by the BuNdIM2 Ofs'ldal WTI render th)s permit Mull gild Yotd. U contained herein, unless approved t'*Tire. ABATE AZriZMITS ARE McQulPAn FCIR C;AS, PLUMBING AND HVAC W9Ei1t, f DATE OCT-02-01 TUE 08.26 AM FROM; TO;PERMITs-DESK PAGE 1