STAFF REPORT
ITEM NO B.
DATE: �ywt l 1, ?� 4 l
APPLICANT: David Anderson & Allison Vandever
ADDRESS: 1418 Rock Street
COA REQUEST: New Infill House
PROJECT BACKGROUND AND DESCRIPTION:
The subject property is located at 1418 Rock Street. The
property's legal description is "the north 45' of Lot 8,
Block 49 Original City of Little Rock, Pulaski County,
Arkansas."
This is a vacant lot. The former building was demolished
partly because of the tornado.
This application is for a New Infill House. The property
will be developed with two structures of identical size, the
front structure being used for office/studio and the rear
structure being the living quarters (1 bedroom and 1 bath
open plan design) surrounding a courtyard preserving the
existing elm tree. The project will require a hearing at the
Planning Commission for a Conditional Use permit for the
location of a home occupation in an accessory structure.
PREVIOUS ACTIONS ON THIS SITE:
On August 5, 1999, a COA was filed for the repair of the roof after the tornado. The COA was
not granted due to lack of information.
On January 6, 2000, A COA was granted for demolition to Raymond Rogers.
PROPOSAL:
Following is an explanation of a rainscreen from the applicant: `Rainscreen wood wall will be
set approx 4" off structure and spaced approx 112" in between each board, creating a screening
effect from the structure of the house. This technology allows wind to move in between and up
and down between the screen and the main structure to act as a multi -functioning wall system.
Some of the advantages include creating a wind break, a rain screen, and a thermal screen for
shading the main structure from UV and solar gain. It creates a similar aesthetic to board and
batten with the vertical breaks, and becomes a low maintenance, low risk siding. There are
moments where translucent screen is the interior finish, allowing daylight to pass through the
rainscreen it is diffused into the living area through the polycarbonate screen, allowing a
reduction in energy usage and creating a daylight system that is all encompassing. (photo 10
shows the spacing off the
main structure, and photo 11 J�
shows the rainscreen with
polycarbonate wall behind it.
both of these images are
taken from the residence at
16th and Commerce, where
the rainscreen is horizontal)"
In essence, the rainscreen
sets off the wall and does not
provide total waterproofing to
the house. As shown in
Photo 11, tarpaper provides
the waterproofing for the
house. The photo shows
that the house cantilevers off
the foundation somewhat.
The house built by UofA archite
�•. .M1^. tit "�k...r . - .
Photo 10
cture students at 1623 Rock utili
Ph
zes this rainscreen.
WRITTEN ANALYSIS OF THE APPLICATION BASED OFF OF INTENT AND GUIDELINES:
As stated on page 63 of the guidelines: Primary buildings should maintain, not disrupt, the
existing pattern of surrounding historic buildings along the street by being similar in:
12. Shape: While not typical, the shape and arrangement of the structures are compatible
with the surrounding buildings (based on a cottage with accessory structure in the rear.)
13. Scale (height and width): The height of the proposed building approximately 20 feet,
which is slightly less than the adjacent buildings. The width of the building is compatible with
the adjacent buildings on that block face.
14. Roof shape and pitch: The proposed buildings will have a 12/12 roof that is similar to the
house at 1410 Rock Street. The gable ends will be to the north and south on both structures.
The latest submittal shows the roofing material will be TAMKO Heritage Mountain Slate asphalt
shingles. (The earliest submittal had an option of metal or asphalt.) The roof will have eaves
that are 8" deep, which is slightly larger than the rainscreen detail. Staff believes that this will
read as if the house has no eaves, which is more typical of 1950's minimalist architecture. The
office/studio building has a flat portion on the roof that is not compatible with the neighborhood.
There are other buildings in the area (namely apartments) that have flat roofs, but those
buildings are larger in footprint and height (two stories or more). The roofing material on the flat
portion of the roof is proposed to be Versico VersiWeld TPO in white (a membrane roof).
15. Orientation to the street. The orientation of the building is compatible with the
neighborhood. The proposal is to have a 15' front yard setback and 5-2" and 5-10" side yard
setbacks. These are compatible with the district and within zoning parameters.
16. Location and proportion of entrances, windows, porches, and divisional bays: The
proposed buildings are not compatible. The lack of windows on the front building's front (east)
facade and the lack of windows on the north and south facade are not compatible. Homes in
the area feature windows on all sides of the structures, not just in the courtyard areas and
minimally on the front. A minimum to be considered compatible would be two windows on the
front (east) facade to be either ganged or hung individually. Window size would need to be at
least 3' x 5' vertical. A window would need to be installed on both the north and south
elevations of the front structure on the eastern half of the wall at least 3' x 5' vertical in size.
Windows in the district need to read as windows. Polycarbonate translucent panes behind the
rainscreen will not read as windows and cannot be considered compatible.
17. Foundation height: The new building will have a maximum of 22" high foundation of
concrete block with natural finish. This height of the foundation is lower than most homes in the
area, but is compatible. The foundation will be 34 feet wide and the structure will be 35'-6" wide
with and overhang of 9" all around. This could make the house appear as it is floating. This
would be the first infill house with this type of foundation to wall relationship.
18. Floor to ceiling height: The ceiling height is approximately 9 feet and is appropriate.
19. Porch height and depth: The porch on the front structure is recessed into the building
and is approximately five feet wide. It will feature three or four full width steps constructed of
white pine in a natural sealed finish. The handrail at the front steps will be stained wood.
20. Material and material color (if brick —closely matching mortar and brick color tones, if
frames —matching lap dimension with wood or smooth masonite, not vinyl or aluminum siding):
The exterior material of the structures are 4" wide white cedar planks. No information is given if
the material is to be sealed or stained. These boards will be installed vertically with a 1/2 inch
space between them. The rainscreen would be a first for the historic district. Using board in a
vertical fashion for sheathing is not new. Board and battens are simply vertical board of
different sizes for sheathing. While this is not typical, the use of this technology would not be
incompatible with the district. The finish of the boards would make a large impact on if the
siding blended in with the neighborhood.
The windows at the northeast corner of the front structure are to be Pella Designer
series wood windows with aluminum cladding in brown finish or equivalent. They will
feature three transoms over three wide and three wide over three awning for a 7'-6
"wide x 7'-6" tall opening. Other windows will be of a polycarbonate translucent panels
(plastic panels) that is located behind the rainscreen so that light passes through
spaces in the rainscreen as shown in the photo above labeled "Rainscreen front view."
See attached Poly0210 information attached at end of report.
Doors will be custom made with the polycarbonate translucent panels insert with white cedar
frames. The doors will be 3'-8" wide and 7' tall. Trim on the doors will be between 8 and 12
inches painted wood.
21. Texture (details such as trim around windows, doors, eaves, watercourses, corner
boards, eave depths, etc.) should be similar in size, The Hardie board trim around the eves has
not been specified as to the width of the boards. There appears to be a trim board at the
corners of the structure and a horizontal band separating the gable from the wall sections.
22. Placement on the lot (front and side yard setbacks): The setback of the proposed front
structure is in keeping with the setbacks of the two adjacent structures.
Fencing will enclose the courtyard and extend north and south to the property lies. This was
amended after the drawings were submitted. The fencing will match the white cedar rainscreen
and be four feet tall.
Walks to the structures will be of concrete pavers. The Drive will be of "grassctrete". This is
similar to what is installed at the art center loading dock on the north side of their building, but
not exactly the same technology.
Exterior lighting will be recessed cans at the entries.
Mechanical units will be placed inside the courtyard.
The chimney will be a standard metal stove chimney.
They are not requesting the following at this time: Signage, guttering on house, satellite dishes
NEIGHBORHOOD COMMENTS AND REACTION: At the time of distribution, there were no
comments regarding this application.
STAFF RECOMMENDATION: Approval with the following conditions:
2. Obtaining a building permit.
3. Remove flat portion of roof and continue same pitch and materials as proposed on the
rest of the front structure.
4. Add windows to east, north, and south facades of front structure.
COMMISSION ACTION: March 14 2011
Brian Minyard, Staff, made a presentation to the Commission. David Anderson, the applicant
then presented to the Commission and stated that he did not oppose Staff's recommendation.
He stated that he wanted a green roof, but the Staff recommendation of modifying the roof was
okay with him. He also stated that the addition of the windows was okay, but the house and
office structures focus inwards to the courtyard area. He stated that they could produce
drawings with the windows shown.
Commissioner Julie Wiedower stated that she drove by the application and thought that the tree
was closer than is shown. She asked how deep is the front portion of the office/studio building
and the answer was 8' deep. He continued that there was a deck porch area to the rear. She
continued to ask about the polycarbonate and how did it read at night. The response was that
at night it could glow as a light box based on how the panels were illuminated. The
conversation continued on how much polycarbonate was to be used in the project.
Commissioner Wiedower discussed the size of the living structure.
A discussion ensued on the windows. The Commission looked at the large-scale drawings.
Commissioner Wiedower stated that revised drawings would need to be submitted. The
windows on the east side of the office/studio structure have awning windows on the bottom of
the units and transoms above.
Commissioner Chris Vanlandingham asked if the front structure was for business. Mr.
Anderson stated that it was.
Further discussion was held about the windows and the sizes of the proposed windows to be
added to the structure. The windows shown on the front of the office/studio structure is a 7 1/2
foot square. Mr. Anderson suggested that he could add a 5' x 7 1/2 foot bank of windows on the
front elevation and a 2 1/2 x 7 1/2' bank on the north and south side of that building. Staff
commented that the addition of windows on the rear structure is not as necessary as adding
them to the front half of the office/studio building. Trim around the windows was discussed and
it was decided to hold the rainscreen detail back so that the trim around the windows would be
exposed.
Commissioner Wiedower asked about the size of the siding. Mr. Anderson responded that it
was 3 1/2" wide with a gap of 1/2 inch. Commissioner Vanlandingham asked about the finish of
the rainscreen. It will be white cedar with a clear coat finish. Eventually, the boards will weather
out and become silver-gray. It is pest resistant. Commissioner Wiedower suggested that it be
kept 8" off the ground at least.
Commissioner Wiedower asked about switching the flat green roof to the rear structure. Mr.
Anderson stated that it was a sleeping loft and that it could not be a green roof.
Commissioner Vanlandingham asked about signage. Mr. Minyard stated that it would require a
separate COA for any exterior signage.
Commissioner Wiedower stated that she was okay with resubmitting new drawings for the April
Meeting by 5:00 on March 21 st. Commissioner Vanlandingham stated that changing the roof on
the front makes it more compatible with the neighborhood.
Commissioner Wiedower made a motion to defer the item to the next meeting for additional
information. Commissioner Vanlandingham seconded and the motion passed with 4 ayes, and
1 absent (Randy Ripley).
F UPDATE:
ril 4. 2011
The applicant has resubmitted drawings with the following changes:
1. Removing flat portion of roof on front office/studio structure and extending the pitch of
the gable roof to the south.
2. Windows have been modified and/or added. The windows on the Rock Street facade of
the office/studio have been modified. Originally, it was a grouping of nine windows,
three transoms, three large windows, and three awning windows at the bottom. With this
change, the transoms have been removed. A window has been added to the north
elevation of the office/studio building with a transom above. A grouping of windows have
been added to the office portion of the Rock Street facade with two large windows and
two awning windows below. No window has been added to the south facade of the
office/studio building. An opening to the open porch at the rear of the office/studio
building has been added to the south facade.
3. The new perspective shows the fence coming out to the property line to the north (and
the east elevation also shows it to the south.) See drawing at the end of this report titled
"Revised drawings of perspectives elevations dated 03-17-2011."
An additional drawing shows where the polycarbonate wall system is to be placed is located at
the end of this report titled "Revised drawings of perspectives elevations dated 03-17-2011 ". It
will be in both gable ends of the living structure and the north facing gable end of the
office/studio structure. Solid walls will be on the entirety of the north facade of the office studio
structure, walls of the living, office and studio spaces. The porch, located on the west portion of
the office/studio structure, will not have polycarbonate or solid wall, it will act as lattice. See
diagrams below. The green lines represent solid walls, the blue represents polycarbonate and
the red represents open air.
STAFF RECOMMENDATION: Approval as resubmitted with the following condition:
1. Obtaining a building permit.
COMMISSION ACTION: Aril 11. 9011
Debra Weldon, of the City Attorney's office, stated that since there were only three present and
that since Commissioner Ripley would have to recuse on the next two items, there would not be
a quorum to continue the meeting.
After discussion, it was decided that staff would try to set a called meeting for April 25, 2011.
Publication deadlines for the legal ad, and booking a room was discussed. Staff would contact
all parties present to inform them when the meeting was set. Commissioner Wiedower made a
motion to convene a special meeting as soon as possible, hopefully April 25, 2011.
Commissioner Randy Ripley seconded. The motion passed with three ayes and two absent
(Peters and Vanlandingham).
V. Other Matters
a. Enforcement issues
None.
b. Certificates of Compliance
One COC was issued for a temporary construction fence at Fowler Square Apartments
on the Seventh Street frontage.
c. Dunbar Survey Update
Staff has left message with Andre but has not heard back before the meeting.
d. Preservation Plan Subcommittee
There is a proclamation of the nationwide Proclamation of May as Historic
Preservation Month on May 3rd.
Commissioner Wiedower asked about if Parks has filed for COA amendment on the
fountain issue. Staff said that they had not.
e. Citizen Communication
None.
VI. Adjournment
There was a motion to adjourn and the meeting ended at 6:10 p.m.