May 11,2012
Page Wilson
Paul Page Dwellings
324 E 15th Street
Little Rock, Arkansas 72hhh
Dear Mr. Wilson,
DEPARTMENT OF PLANNING AND
DEVELOPMENT
723 West Markham Street
. •Little Rock,.Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435
Your application for New Infill House, at 1418 Rock Street will be heard before the Historic
District Commission on June 11, 2012. The hearing will be held in the Board Room at City Hall
at 500 West Markham on the second floor. The meeting will begin at 5:00 p.m.
Your amendment will be item One on the agenda. ;You -or your agent• must be present in order
for the item to be heard.
The application states that "A description of materials for all exterior surfaces to be used
including but not limited to foundations, walls, windows, doors, roof and exterior surfaces and
details including sizes, manufacturer, model number and color." The following information will
need to be submitted to Staff by Friday May 18 to complete your submittals for the filing. If you
are not including any of the items below, please respond with "not applicable".
✓Foundation: Please list height at the front of the house.
Steps to house: List materials and finishes and provide sketch of finished steps. IF handrails
are required, Provide materials and finishes and provide sketch of handrails.
c.-Walls: Your application states Hardie Board 8" lap siding. Please state orientation, and finish.
Also, state size, material, finish, and model number of any trim boards around doors and
windows. Siding and trim boards need to be shown on the drawin s. Include floor to ceiling
height on all floors and porches. Are you requesting 9' ceilings or
�-Wfndows: Are these wood windows with vinyl cladding? Please state color of cladding.
4'Doors: Specify brand, model number, finish, and size for all exterior doors.
Lighting: Specify location, brand, model n.pmbef, finish,-.and.size for -all exterior lighting either
affixed to house or freestanding. 116C dA d oar , I —•Gutters: If gutters are being installed, show locations orttel-r=o elevations with size and
materials of guttering and downspouts.
Mechanical Systems: State location of any exterior air conditioning/heating system units.
Satellite Dishes: State location and details on any satellite dish. If not using a dish, please
state so.
Roof: Provide pitch of all roofs and depth of all eaves.
Fencing on site: Provide details and locations on fencing, size, material, and finish. If you wish
to persue a 7' fence on the south side of the property, this will require a Board of Adjustment
application. (Contact Monte Moore at 371-4790. Applications are available on line.)
1 of 2
71
fbRUM201T
WRFOLK, VA
llam-11:45am
13 9am-Noon
Historic Tax Credit
3:OOpm-4:45pm
22
The Greenest
Death by Decisions:
How to Avoid Political
Workshop`
Building Screening
Problems with Your
& Panel Discussion
Commission
gam-4pm
G Historic Triangle Tour'
2p 3pm-3:45pm
2pm-2:45pm
What's New
2O Innovation in Design
Guidelines, Survey
18 10am-10:45
Youth in Preservation
m
t5
from
from
& Planning
Lessons
Lessons
10am-10:45am
G
the Sun and Rust
Belts Dealing with
2pm-2:45pm
Preservation Through
Why & How to Organize
Development
Preservation in Low
an Old House Fair
Income Communities
2pm-3:45pm
Dl0am-10:45am
Archaeology & CI -Gs
yg
17 Legal Framework
Landmarks
Landmarks &
10am-3pm
33 Ft. Monroe Advocacy
Main Streets
G3pm-3:45pm
2O &
Workshop'
10 4pm-4:45pm
Meet Your National
International Partners
Tea & Trade
18 11am-11:45am
G3pm-3:45pm
2�
NPS: A Call to Action
I� 5pm-6:30pm
Thematic Mixers
Tricky Preservation
and Design Review
issues Explored
llam-11:45am
t8
The Present Issues
22 9:30pm-11:30pm
with the Recent Past
Boats & BonBons"
3pm-3:45pm
Z� Secrets of a Successful
18 11am-11:45am
Application
Don't Let Disasters
Destroy You
4pm-5:15pm
to Opening Forum &
22 Noon-1:30pm
21 9am-9:45am
NAPC Awards
Sustainability Luncheon
Coffee Wrap Up
Connecting the Dots:
a Frozen Past and
G9am-Noon
6pm-7pm
l� Welcome Reception
a Melting World'
Get Dirty at
at D'Art Center
Fort Norfolk'
ai 2pm-2:45pm
E) Retooling the
9am-Noon
Historic Districts for
Explore Norfolk'
9am-9:45am
23 Zoning Overlays
the 21st Century
G9am-Noon
& Landscapes
is 2pm-2:45pm
Sustainability
Filling Gaps with
Preservation
Houses that Fit (in
Process & Practice
G9am-9:45am
Lessons Learned from
your district and
bank account)
19 10am-10:45am
the Green Revival House
your
Virginia's
9am-9:45am 19 2pm-2:45pm
Uis Social Media: Making
Architectural Review
Board Study
Creating Events that Will
Leave Them Talking
the Most of Your
Digital Community
0 Info Sessions &
R
Ignite Roundtables O Special
Events
a
Case Studies
Sessions
I f'
Forum 2012 Preliminary
Program
Page15
I
•}�.�� .
51,
11
�'1 � I j LITTLE ROCK
;I "
2"1 _ HISTORIC
_ DISTRICT
ref ! COMMISSION
Ejr ✓
May 11, 2012
Page Wilson
Paul Page Dwellings
324 E 15th Street
Little Rock, Arkansas 72hhh
Dear Mr. Wilson,
DEPARTMENT OF PLANNING AND
DEVELOPMENT
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435
Your application for New Infill House, at 1418 Rock Street will be heard before the Historic
District Commission on June 11, 2012. The hearing will be held in the Board Room at City Hall
at 500 West Markham on the second floor. The meeting will begin at 5:00 p.m.
Your amendment will be item One on the agenda. You or your agent must be present in order
for the item to be heard.
The application states that "A description of materials for all exterior surfaces to be used
including but not limited to foundations, walls, windows, doors, roof and exterior surfaces and
details including sizes, manufacturer, model number and color." The following information will
need to be submitted to Staff by Friday May 18 to complete your submittals for the filing. If you
are not including any of the items below, please respond with "not applicable".
Foundation: Please list height at the front of the house.
Steps to house: List materials and finishes and provide sketch of finished steps. IF handrails
are required, Provide materials and finishes -and provide sketch of handrails.
Walls: Your application states Hardie Board 8" lap siding. Please state orientation, and finish.
Also, state size, material, finish, and model number of any trim boards around doors and
windows. Siding and trim boards need to be shown on the drawings. Include floor to ceiling
height on all floors and porches. Are you requesting 9' ceilings or 8'?
Windows: Are these wood windows with vinyl cladding? Please state color of cladding.
Doors: Specify brand, model number, finish, and size for all exterior doors.
Lighting: Specify location, brand, model number, finish, and size for all exterior lighting either
affixed to house or freestanding.
Gutters: If gutters are being installed, show locations of gutters on elevations with size and
materials of guttering and downspouts.
Mechanical Systems: State location of any exterior air conditioning/heating system units.
Satellite Dishes: State location and details on any satellite dish. If not using a dish, please
state so.
Roof: Provide pitch of all roofs and depth of all eaves.
Fencing on site: Provide details and locations on fencing, size, material, and finish. If you wish
to persue a 7' fence on the south side of the property, this will require a Board of Adjustment
application. (Contact Monte Moore at 371-4790. •Applications are available on line.)
1 of 2
I LITTLE ROCK
r
;' HISTORIC
f'►�_ IM1 DISTRICT
.���+�{�:: COMMISSION
DATE: January 9, 2012
APPLICANT: Arlene Sullivan
DEPARTMENT OF PLANNING AND
DEVELOPMENT
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435
STAFF REPORT
ITEM NO. Two.
ADDRESS: 308 Daisy Bates
COA REQUEST: Replacement of all siding and trim repair/replacement
PROJECT BACKGROUND AND DESCRIPTION:
The subject property is located at 308 Daisy Bates Drive.
The property's legal description is "part of Lot 5 and Lot
6, Block 48, Original City of Little Rock, Pulaski County,
Arkansas."
This building was built in ca. 1890's. The 2006 survey
form states: This asymmetrical two-story Colonial Revival
house has a decorative, arched top window and detailing
in the front facing gable." It is considered a "Contributing
Structure" to the MacArthur Park Historic District.
This application is for replacement of all siding and trim
repair/replacement. Damaged trim around doors and
windows will be replaced with same style and type trim.
PREVIOUS ACTIONS ON THIS SITE:
On June 26, 2008, a COC was issued to Arlene Sullivan for driveway modifications.
On March 31, 2008 a COA was issued to Arlene Sullivan for siding, foundation
modifications, replacing windows, filing in eastern window, fencing, gutters and
new orch over northwest door and removal of porch and steps on southwest door.
, front porch
downspouts,
p1
On March 10, 2008, a COC was issued to Arlene Sullivan for roof, soffit, fascia, walk, grounds,
and fencing.
On October 5, 2000, a COA was denied to Chris Pratt for installing vinyl windows.
5of10
Walks/Sidewalks/Drives: Provide information on city. sidewalk repair. or replacement. Provide
information on any private sidewalks and vehicular drive/parking pads with size, materials, and
finish.
Landscaping: If included, provide details on any wall, planting bed border, or any other fixed
inert building material used in permanent landscaping structures.
Elevations: Submit dimensioned elevations for height and width of all elevations.
Garage: This application does not include any garage. Please confirm.
The above list was generated from pages 61-71 in the MacArthur Park Historic District
Guidelines for Rehabilitation and New Construction August 2010. Failure to provide all
information requested above in a complete manner before 5:00 pm Friday May 18th, will result
in a Staff recommendation of Deferral on this application.
Sincerely,
Brian Minyard
Planner II
..
Existina south elevation
east elevation
I
po'!
y
J .
Existina west elevation
7!1
.at
,xisting north elevation
PROPOSAL AND WRITTEN ANALYSIS OF THE APPLICATION BASED OFF OF INTENT
AND GUIDELINES:
This proposal is to remove all current exterior siding and replace with five -inch cedar boards
with two-inch overlap resulting in a three-inch reveal. In addition, there may be framing boards
that are rotten and will need to be replaced at the same time. Damaged trim around doors and
windows will be replaced. All new wood will be primed and two coats of paint applied.
The Secretary of Interior's Standard #6 is relevant to this application. It states:
Deteriorated historic features shall be repaired rather than replaced. Where the
severity of deterioration regtlires replacement of a distinctive feature, the new
feature shall match the old in design, color, texture and other visual qualities and,
6of10
Walks/Sidewalks/Drives: Provide information on city sidewalk repair or replacement. Provide
information on any private sidewalks and vehicular drive/parking pads with size, materials, and
finish.
Landscaping: If included, provide details on any wall, planting bed border, or any other fixed
inert building material used in permanent landscaping structures.
Elevations: Submit dimensioned elevations for height and width of all elevations.
Garage: This application does not include any garage. Please confirm.
The above list was generated from pages 61-71 in the MacArthur Park Historic District
Guidelines for Rehabilitation and New Construction August 2010. Failure to provide all
information requested above in a complete manner before 5:00 pm Friday May 18th, will result
in a Staff recommeridation of Deferral on this application.
Sincerely,
/�' A��
Brian Minyard
Planner II
2of2
What are
Info
Sessions
& Case
Studies?
Hear about innovative
programs, processes
and best practices
and learn how you
can incorporate
them into your local
preservation projects.
Thursday 19
1pm-3:30pm
Section 106: What's in it for Your Community?
Learn how the Section 106 review process enables community
participation in federal agency project planning and how it
provides a forum for balancing preservation values with other
project needs. Section 106 of the National Historic Preservation
Act requires federal agencies to assess the effects of their
projects on historic properties and provide the Advisory Council
on Historic Preservation an opportunity to comment. For those
who are new to Section 106 and would like to know what the
process requires, when it applies, who participates, and how a
review is conducted, ACHP staff will provide a basic orientation
in this workshop.
Friday 20
9am-9:45pm
Greening Strategies: Using Energy Audits to
Improve Performance and Reduce Utility Costs
in Historic Homes
Through low -impact, preservation -friendly steps that any
preservation commission will love, homeowners can improve
their historic home's energy efficiency and reduce their utility
costs, often with minimal time and investment, and without
sacrificing historic integrity. A home energy audit can help
property owners develop a comprehensive approach to isolating
and tackling problem areas by identifying effective, high -rate -of -
return solutions. Montgomery County, Maryland, with support
from the Maryland SHPO, provided energy audits to ten historic
homeowners. The audits' results pointed consistently to problem
areas shared by many historic homes, and identified cost-
effective solutions that could be accomplished in accordance
with preservation best -practices.
Friday 20
9am-10:45 pm
Working with City Hall & Expanding Our Role
Design review is an important function of commissions but
commissions can also be an asset and a resource to their city in
other ways. Hear how others have expanded their role in city
government and solidified their seat at the political table.
Friday 20
10am-10:45am
Preservation and Building Codes: Navigating
for Success
Renovating and adapting historic buildings for new uses can
create conflicts between current code requirements and
preservation ordinances/guidelines. This session will provide
strategies towards creating a successful collaboration between
all the stakeholders including the code official, the preservation
commission, the owners, and the A/E design team. Case studies
National Alliance of Preservation Commissions