HomeMy WebLinkAboutProject shed demolition and rebuild1116 ROCK OWNER LINDA POLLOCK
Project: shed demolition and rebuild
MATERIAL LIST
Lumber - framing
Fastners, Nails, Screws, Angle brads
Corrugated Metal - roofing
Angle Flashing - roof
Corrugated closure strip
Concrete footing
Rebar - footing
S
Joist hangers - roof
LIP Siding - walls
Ladders
Safety equipment
Scaffold
REQUIREMENTS FOR DEMOLITION
No machinery or heavy equipment needed
Manual labor
Cubing/Derno tools
V1 NWe.ci,a( LL5~r
REQUIREMENTS FOR DEMOLITION
No machinery or heavy equipment needed
Manual labor
Gutting[Demo tools
wall B
27ft L
RAFTERS & Hoof Purlins
25 - MUM rafters are needed.
72 - (1x4x10) wood horizontal purlins
2 - (1 x8x10) wood for peals of roof
21147nall gun NAILS for purlins
3112" nail gun Nails for framing — ---
WALLS (A,B,C,& D) RED WALL STAYS AS IS
4 - (4x4x10) wood (Posts for Walls A, B, C, D)
3 - 4x4 Galvanized Adjustable Standoff Post Ease for 4x4 Nominal
Lumber (Wall A posts, more support)
30 - (2x4x10) wood
3 - (2x6x10) pressure treated wood (Wall A & 8)
2 - (2x6x8) pressure treated wood (Wall A & S)
2 - (2x4xl2) Pressure treated (plates for post replacements Wall D,
wall c and B)
Mwx 2. (2x4x1Q) Pressure treated (wall plates)
50ft x 5115" of sill plate gasket (roll of foam film)
50ft x 3112" sill plate gasket
Wall A needs 2 vertical posts added, replace wall plate, and refra€ne
top of wail for rafters - yes new siding
(2) New footing 14"in it 18"rnx 9Tt Wall 6 needs studs to maintain a straight wall, repair wall frame and
wall plate replacement, one of the posts is very warped needs
Measurements for Panels
South Wall 0 View
9Z'M L
27fiL
Load bearing wall footing sped
Walls A& D a ball''` of A onlffi t ea),
3-Ire
Inside floor
level
Ir
i/1 (plan
ROOF MEASURE ANTS
2ft Over hang
arou d
%AST
Side A
18B"ft
Flashing
roof to wall
High Point
12'6 ft L Side 0 Roof
9'4"ft L _
l2'G"ft L
East Side C
lift
..zgsf
SOUTH
Side 8
(2) Footings (20" wide x 16" deep)
Wall Plate 2A x66 bags 801b concrete
Yfith anebo"in x8 Milkman 912-in 112-in x 8-in Galvanized Exterior Coarse ThreadAnchor Bolt
altr ut ° x8Ott #4 rebar (W j
x10ft #3 rebar (%'�
Project Source 10-leetx 25-Feet Black 6-Mils Professional Construction film
t ate ors a -- Two parallel bars at the bottom, of least 3 inches from the ground (use rebar chairs).
lr Vertical stirrups (93 rebar, %') every 24 inches to hold the longitudinal bars together
= Use #3 or#4 rebarat 92 =?5" on center (O.C) in a grid pattern.
Ensure 3 inches of concrete coverage on all sides.
Moisture Barrier (Vapor Barrier)
Use &,mil or thicker pofyethylr ne sheeting (recommended 10 MR for durability).
Edtend the barrier up the sides of the formwork to protect against ground moisture.
This setup will ensure durability and protection foryour barn Is foundation. LP