HomeMy WebLinkAboutElevationsr tati's�wL�:At�i ,
CK. I
r t4'8"ftL
Wall n
000a s _ 9W'tL
164"ll L` 18'ftL s 8`gryj
Wall
Tftl ' wall
7ft
wan s
27ftL
New footings
17"in deep x 18"fn wide x 12It
Load bearing wall footing specs
Walls & D - half of only(9ft ea).
Wall hottom
plate 2x4 with
3-1@" 10"in anchor
' hwkftWnut
aside ttn�tr 7"' �
ca
tt ! t0 b' r �mrg�e —
13"
18' . 2
_ _
WALLS (A,B,C,& D)
4 - (4x4x10) wood (Posts for Walls A, B, C, D)
3 - 44 Galvanized Adjustable Standoff Post Base
for 4x4 Nominal Lumber (Wall A posts, more
„Np� 'i
*92 - (2x4x12) wood studs
*24 - (2x4x10) wood studs
*4 - (2X4x8) wood studs
*port header 2- 2x10x10L or 1- 4x10x10L
2 - (2x412) Pressure treated
(plates for post replacements Wall D, C and B)
6 - (2x4x10) Pressure treated (wall plates)
50ft x 5112" of sill plate gasket (roll of foam film)
50ft x 3112" sill plate gasket
**EXTERNAL WALLS SQFT
West viaii 180'5T
South Wall343'sf
East Walls 283'sf
Total sf.• 800'
Aprox 12ft footing (18" wide x 17" deep)
x45 bags 801b concrete
x8 Hillman 112-in 112-in x 10-in Galvanized Exterior Coarse Thread Anchor Bolt
AN #4 rebar (W)
x10ff #3 rebar (%W7
Project Source 10-Feet x 25-Feet Black 6-Mils Professional Construction film
Two parallel bars at the bottom, at least 3 inches from the ground (use rebar chairs).
Verticalstirrups (#3 rebar, %) every 24 inches to hold the longitudinal bars together.
Use #3 or#4 rebar at 12"16" on center (C.C.) in a grid pattern.
Ensure 3 inches of concrete coverage on all sides.
Moisture Barrier (Vapor Barrier)
Use 6-mil or thicker polyethylene sheeting (recommended 10-mil for durability).
Extend the barrier up the sides of the formwork to protect against ground moisture.
This setup will ensure durability and protection for your barn's foundation.
Bird View ROOF
MEASUREMANTS (not wallifloor)
V. 1.5it Over Flashing
hangtaround "ARC oofrowan
WEST
Side A
18111
Ridge Board
Side RoefHigh
B'ftL i/ Point
East Side C
loft
SOUTH
Side e
** the measurements shown here are the
sloping measurements for the metal roof
which includes 1.5ft overhang**
RAFTERS & Roof Purlins
25 - (2x M) ratters are needed.
72 - 11x4x101 wood horizontal purlins
2 - (9x8x10) wood for peak of roof
2114' nail gun NAILS for purGns
3112" nail gun Nails for framing
South Wall B View
zda.�
\•' 5'4-R Rise .J
aYTttM :gye"ftH
Exlerbrgrountl slope
4'2"k L
I..................I 27R L
>7/12 roof slope (short roof run)
>3.5/12 longer roof run
Scope of work: remove old work and
rebuild roof to drawing specs and install
metal roof.
v
E.......................
0
.........................
4::d
T
x
..............................
in
W-
a
C11 0
:2 0; —
u
wwix
cn
LU
.................. +
in 00
0:2
Cl) CO)
............... ..............
>C
..
0
OCl)
zo
0
'0
Ic.�
OF
c
CA fir+
im
i
Oct
O
.62
G7
td
Z3'i ■
•cc ca
Z3 CA
CO
O a
6
a
V
,o
� y
°
w
co
d
Ltl)
LIL
v- cu m
W.3=OC°O
yam. L S
E = O
0 c 0
C.4 MM
0
Q_o .mac
•'—'
j
Co
r.
cu
go
E. _S.
CL
M W 402
occ
CL
vi to
lz
p�
co
Rf
C
P
lef-
C()_0 tliCL
.........................
cry
r
Q
m
2i
v
AM
�
��
� \� � -
we.�
�
�
�
�
�
�