Loading...
HomeMy WebLinkAboutHDC2016-006 Harness Roofing, Inc. Statment And Invoice For Scope Of Work 02/18/2016HARNESS ROOFING, INC. ' C= Customer Comrritled nmav h,7rnessrvofrng.com RArkansas Contractor's License #0018900415 Oklahoma Roofing (;ontractor Rcgistrarion #8 OON4 11300 Otter Creek Last Blvd. * M[abelvale, AR 72103 * Phone 501-•604-7663 * Ce11501-813-2305 DATV.: 2-29-16 PROPOSAL. #16-42-0038.1- Slate I famess Roofing, Inc. (hereinafter referred to as "I IRI'D proposes to perform and furnish the labor, materials, insurance, supervision, equipment and warranty (heroin together referred to as the "Work") described herein for: OWNEWCUS"I OMER: UAINIS Rnginecr4 & Operations, Atm: Robert Airy 501-319-2755 or raair(<a ams.edu ADDRFS5; 4301 WNt Nlarkham %creer #579, 1.irdr Rock, AIt 72205 111ZO11:C1'• Stcep Slope Rertxtf @ $th & Rock sneer, I.R SCOPE' OF WORK: 1. Tcar-off existing slate the material down to wood deck. 2 *Tnspecr wood deck prior to underlayment installation. 3. Install ice & water -shield 1 l'1' underlayment over all pitched surfaces. 4. 1 nstall new copper metal drip -edge and new lead plumbing vent pipe base flashings. 5. Install 16" x IT' x 1/4" semi weathered gray authentic Slate tile SYstem. 6. Install new copper metal flashing & counrerFlashing metal on all chimney bautes. 7. Install new 060mil whire'M) membrane on upper low sloped ronf detail and a1I internal box gutter details located on pitched rtwf cave edges. 8. 1 land off all shingle debris in a timely manner. Protect landscape at all times and sweep property with magnets for nail threats. 9. Conduct all workmanship according to Manufacturer's recommendations, T Tamess Roofing safety requirements and OSI TA regulations. 10. Provide a 2 year workmanship warranty along with applicable material warranties_ 11. provide applicable man -lift equipment, skytrack equipment and portable toilet. *Decking found to be deteriorated will have to be replaced at an additional cost of $100 per sheet for standard 1 /2" thickness. Additional costs may apply. [;X(:I.USIONS: Framing, structural, mechanical, I iVAC, electrical, sarellitc interruptions and/or repositioning costs and other items not listed above. AD flat seam roof details. CONTR.•1(X PRICI I IRI steal] perform the Work for. '[l?RMS ANDS '1 )l'I' ]NS: 'lire terms ']'big [In 4X# is subK'ali7 revision or wi t na an inad% cart coot] .I fIU has pceurre ,hall Ix u n++. uFcrcdit:�ic35 tent I. TITTS(:(li`1 r:ftatt�l' ]Iti5!113;,'D By: Bob BtrcJnanan -- ACCEPTANCE• The andenigne' c[rr ace ronsntute tJte entlre k•�sn YaCt. Owncr/Customer: •1 Frle: One hundred sixty seven thousand seven hundred eighty five Tktllars $ 167,785.00 in current funds. set forth on the following pages are a part of this pr)posal. reason unril communication of acceptance arul may be revised after curnmunication of acceptance where tkirty (10) days after the date stated alcove unless otherwise agreed if not earlier wvthdrawn. Acceptance PROVISION WT IICI I MAY BE, ENFORCED BY TI TL; PAR'1'II?S. Title: Steep Slope Manager this Proposal and, intending to be legally bound hereby, agrees that this writing shall be a binding contract and shall By: Date: Initials HARNESS ROOFING, INC. ' C= Customer Committed Rwww.harneurvv/rnh cam Arkansas Contractor's License #0018900415 Oklahoma Roofing Contractor Registration #8000044 11300 Otter Creek East Blvd. * itiiabelvale, AR 72103 * Phone 501-604-7663 * Cell 501-813-2305 DATE: 2-29.16 PROPOSAL. #16-42-W38 i fames.~ Roofing, ine. (hereinafter referred to as 9 IRI") proposes to perform and furnish the labor, materials, insurance, supervision, equipment and wamtnty (herein together referred to as the "Work") described herein for: OWNI SR/CUSl'OM1,R: UANfSI?ngineering&Operations, Attn: Robert Airo501-319-2755 or i2,mro@uams.edu ADDRESS: 4301 West Markham Street #579, little Rock, AR 72205 PItOJI?Cf; Steep Slope Reroofn 8th & Rock street, LR S(:()PF: OF WORK: 1. 'l'ear<tff existing slate tile: material down to Wood deck. 2. *Inspect wood deck prior to installing #30 felt uride dayltLtnt. 3. Install ice &. water -shield underlayme nt in all valley- areas, chimney bases, and plumbing vent pipe bases. 4. Install new perimeter drip -edge metal and new plumbing vent pipe base flashings. 5. install C71) I Tightand slate asphalt shingle, Shangle hip & ridge product and I figh performance starter. 6. Install new 24ga flashing & cou nterflashing metal on all chimney bases. 7. Install new 060mil white -1'P0 membrane on upper low sloped roof detail and all internal box gutter details located on pitched roof cave edges. 8. 1 laul off all shingle debris in a timely manner. Protect landscape at all times and sweep property with magnets for nail threats. 9. Conduct all workmanship according to Manufacturers recommendations, iTatness Roofing safety requirements and OSI IA regulations. 10. Provide a 2 year workmanship warranty, along with applicable material warranties. 11. provide applicable man -lift equipment, skytrrek equipment and portable toilet. 'Decking found to be deteriorated will have to be replaced at an additional cost of $100 per sheet for standard 112" thickness. Additional costs may apply. It,X(:i.U.SJONS: Framing, structural, mechanical, i iVAC, electrical, satellite interruptions and/or repositioning cost; and other items not listed above. All flat scam roof details. CONTRACT' PRICE: l LRl shall perform the Work for Seventy, one thousand seven hundred forty Dollars 5 71,740.00 in current Funds. 'l'1?RMS AND CONDITIONS. The terms and conditions set forth on the following pages are a part of this proposal. 'Chi, 1'mptual io -vision or withdrawal by I1R1 for any reason until communication of accptance and maybe revised after enmmunicaoion of acceptance where an in rent en er'ay 11R1 has excumd. TI»s Pm egpi i days after the date stated above unless otherwise almxd if not arlier withdrawn.:leecptencc sh lxsuinr��crura pan-aluicredirde."nmert T'f i ..:SdS'! 1'J 1N"I'r1i ti ' A L3iN 1NC: 011 [ 1 l i lelt 4 ftilC3i+ �� MCI I MAY BE. [;NItORCTt.D BY'Ilil PAltl'IES. Bob Title: Steep Slope Manager ACC)EPTANCEr— `J The undersigned hereby accepts this proposal and, intending to be legally bound gently, agrees that this writing shall be a hireling contract and shall constitute the entire contract. Owner/Customer ri rlc: Date: Initials BID NO 021816-01 N 5520 Willow Springs Road Little Rock, Arkansas 72206 All Spec Roof Corp Nl B E 4Office...501.261.7672 Cell ...... 501.551.1536 AIISpecRoofCorp@gmail.com CUSTOMER: BILL TO ADDRESS: AR Contr. Lic, No. C-0339810316 1ST LUTHERAN CHURCH LITTLE ROCK, AR JOB SITE ADDRESS: I CUSTOMER CONTACT: 1ST LUTHERAN CHURCH raalro@uams.edu Scope of work: All Spec Roof Corp hereby submits the following estimate as per visual inspection and conversation between Robert Airo and Carlos Chavez: ITEM 1 2 3 DESCRIPTION FLAT ROOF RESTORATION REMOVE ALL EXISTING ROOF LAYERS TO WOOD ROOF DECK. REPLACE ROTTEN WOOD AS NEEDED AT ADDITIONAL COST OF $2.50 PER LINEAL FOOT. INSTALL 1/2" INSULATION BOARD. AMOUNT 4 INSTALL 0.60 MIL TPO ROOF MEMBRANE OR EPDM. 5 INSTALL NEW DRIP EDGE METAL TO RECEIVE THE NEW ROOF MEMBRANE. TOTAL FLAT ROOF PROPOSAL $12,400.00 1 GABLE SLATE TILE ROOF REMOVE ALL SLATE TILE DOWN TO ROOF DECK. 2 REMOVE ALL UNDERLAYMENT FELT DOWN TO ROOF DECK. 3 REPLACE ROTTEN WOOD AS NEEDED AT ADDITIONAL COST OF $2.50 PER LINEAL FOOT. 4 INSTALL 30 LB FELT UNDERLAYMENT MECHANICALLY ATTACHED. 5 INSTALL ICE & WATERSHIELD UNDERLAYMENT ON ALL VALLEYS- 6 INSTALL LIFETIME CERTAINTEED ARCHITECTURAL SHINGLES. 7 INSTALL NEW FLASHINGS ON ALL PLUMBING PIPE OPENINGS. 8 INSTALL NEW RIDGE CAP 9 CLEAN UP GUTTER AND INSTALL 0.60 MIL TPO ROOF MEMBRANE. TOTAL GABLE SLATE ROOF PROPOSAL $11,250.00 TOTAL THIS PROPOSAL $23,650.00 DATE SUBMITTED: 18-Feb-16 APPROVED BY: