Loading...
HomeMy WebLinkAbout17019 1 RESOLUTION NO. 17,019 2 3 A RESOLUTION TO AUTHORIZE THE CITY MANAGER TO ENTER 4 INTO A MEMORANDUM OF AGREEMENT WITH PULASKI COUNTY, 5 ARKANSAS, REGARDING PHASES 8 AND 9 OF THE SOUTHWEST 6 TRAIL; AND FOR OTHER PURPOSES. 7 8 WHEREAS,the City of Little Rock supports the development of multi-use trails that promote safe 9 pedestrian and bicycle transportation,recreation,and regional connectivity; and, 10 WHEREAS,Pulaski County,Arkansas,is developing the Southwest Trail,a shared-use pedestrian 11 and bicycle trail intended to ultimately connect Hot Springs,Arkansas,to Little Rock Central High School; 12 and, 13 WHEREAS, Phases 8 and 9 of the Southwest Trail will extend the trail from Roosevelt Road to 14 Little Rock Central High School variously on land owned by the City adjoining Thayer Street within the 15 City of Little Rock inside the eastern side of the Jones Street right-of-way granting a temporary right of 16 entry onto City property to the county for such purposes, and approving the design and placement of such 17 improvements as set out in the property description herein as Exhibit A;and, 18 WHEREAS, these phases represent a continuation of the recently completed segment of the 19 Southwest Trail extending from the Saline County Line to Hilaro Springs Road; and, 20 WHEREAS, Pulaski County, Arkansas, will bear all costs associated with the development and 21 construction of Phases 8 and 9 of the Southwest Trail, and there is no fiscal impact to the City of Little 22 Rock for the construction of these phases;and, 23 WHEREAS, Pulaski County, Arkansas, will retain ownership of the constructed trail until the 24 expiration of the construction maintenance bond for that portion of the trail; and, 25 WHEREAS,upon expiration of the maintenance bond,Pulaski County will transfer ownership of 26 the trail to the City of Little Rock, at which time the City will assume responsibility for the long-term 27 maintenance of the trail;and, 28 WHEREAS, a Memorandum of Agreement between the City of Little Rock and Pulaski County, 29 Arkansas, is necessary to define the responsibilities of the parties regarding the construction, ownership, 30 and future maintenance of Phases 8 and 9 of the Southwest Trail. 31 NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE 32 CITY OF LITTLE ROCK,ARKANSAS: [Page 1 of 5] 1 Section 1.The City Manager is hereby authorized to enter into a Memorandum of Agreement with 2 Pulaski County,Arkansas,regarding the development and construction of Phases 8 and 9 of the Southwest 3 Trail,extending from Roosevelt Road to Central High School. 4 Section 2.The Memorandum of Agreement shall provide that Pulaski County,Arkansas,will bear 5 all costs associated with the development and construction of Phases 8 and 9 of the Southwest Trail. 6 Section 3. Pulaski County, Arkansas, shall retain ownership of the trail upon completion of 7 construction until the expiration of the construction maintenance bond for that portion of the trail. 8 Section 4. Upon expiration of the maintenance bond, Pulaski County, Arkansas, shall transfer 9 ownership of the trail to the City of Little Rock, which shall thereafter be responsible for the long-term 10 maintenance of the trail. 11 Section 5. Funding for the construction of Phases 8 and 9 of the Southwest Trail shall be provided 12 entirely by Pulaski County, Arkansas, and this Resolution has no fiscal impact on the City of Little Rock 13 for the construction of these phases. 14 Section 6. Severability. In the event any title, section, paragraph, item, sentence, clause, phrase, 15 or word of this resolution is declared or adjudged to be invalid or unconstitutional, such declaration or 16 adjudication shall not affect the remaining portions of the resolution which shall remain in full force and 17 effect as if the portion so declared or adjudged invalid or unconstitutional was not originally a part of the 18 resolution. 19 Section 7. Repealer. All laws, ordinances, resolutions, or parts of the same, that are inconsistent 20 with the provisions of this resolution, are hereby repealed to the extent of such inconsistency. 21 ADOPTED: April 21,2026 22 ATTEST: APPROVED: 23 24 25 Allison Segars,City Cle Frank Scott,Jr., r 26 APPROVED AS TO FORM: 27 28 297n I ' 30 Thomas M. Carpenter,City Aft ey 31 // 32 // 33 // [Page 2 of 5] EXHIBIT A Legal Description of Permanent Trail Easement on the Thayer Street Property: A PART OF THE SW 1/4 OF SECTION 9,T-1-N,R-12-W,CITY OF LITTLE ROCK, PULASKI COUNTY, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE NE CORNER OF LOT B, BLOCK 13, ADDAMS ADDITION TO THE CITY OF LITTLE ROCK; THENCE N 87°29'38" W A DISTANCE OF 169.31 FEET; THENCE N 02°55'27" E A DISTANCE OF 208.05 FEET; THENCE N 87°20'46" W A DISTANCE OF 169.45 FEET TO THE POINT OF BEGINNING; THENCE 87°20'46" W A DISTANCE OF 25.35FEET; THENCE ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 1012.50 FEET AND A CHORD BEARING AND DISTANCE OF N 05°59'23"W,28.68 FEET; THENCE N 05°10'41"W A DISTANCE OF 71.88 FEET; THENCE N 06°11'42" W A DISTANCE OF 44.76 FEET; THENCE N 05°47'36"W A DISTANCE OF 86°29 FEET; THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 487.50 FEET AND A CHORD BEARING AND DISTANCE OF N 11°27'00" W, 96.10 FEET; THENCE N 17°06'23" W A DISTANCE OF 13.04 FEET; THENCE S 72°53'37" W A DISTANCE OF 7.00 FEET; THENCE N 17°06'23" W A DISTANCE OF 12.77 FEET; THENCE N 72°53'37" E A DISTANCE OF 7 FEET; THENCE N 17°06'23" W A DISTANCE OF 19.10 FEET; THENCE ALONG A CURVE TO THE RIGHT,HAVING A RADIUS OF 511.75 FEET AND A CHORD BEARING AND DISTANCE OF N 13°46'53" W, 59.00 FEET; THENCE N 10°28'53" W A DISTANCE OF 47.39 FEET; THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 487.50 FEET AND A CHORD BEARING AND DISTANCE OF N 11°55'37"W, 24.59 FEET; THENCE N 13°22'20" W A DISTANCE OF 67.38 FEET; THENCE [Page 3 of 5] ALONG A CURVE TO THE RIGHT,HAVING A RADIUS OF 212.50 FEET AND CHORD BEARING AND DISTANCE OF N05°03'13" W,61.49 FEET; THENCE N 03°15'55" E A 150.62 FEET; THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 37.50 FEET AND A CHORD BEARING OF AND DISTANCE OF N 05°38'39" W, 11.62FEET; THENCE N 63°43'11"E A DISTANCE OF 25.32' FEET; THENCE ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 63.50 FEET AND A CHORD BEARING AND DISTANCE OF S 08°00'19" W A DISTANCE OF 150.62 FEET; THENCE ALONG A CURVE TO THE LEFT . HAVING A RADIUS OF 187.50 FEET AND A CHORD BEARING AND DISTANCE OF S 05°03'13" E, 54.26 FEET; THENCE S 13°22'20" E A DISTANCE OF 67.38 FEET; THENCE ALONG A CURVE TO THE RIGHT,HAVING A RADIUS OF 512.50 FEET AND A CHORD BEARING AND DISTANCE OF S 11°55'37" E, 25.37 FEET; THENCE S 10°28'53" E A DISTANCE OFOF 47.39 FEET; THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 486.75 FEET AND A CHORD BEARING AND DISTANCE OF 13°46'51" E, 56.11 FEET; THENCE S 17°06'23" E A DISTANCE OF 1.46 FEET; THENCE N 73°09'26" E A DISTANCE OF 3.22 FEET; THENCE S 16°50'34" E A DISTANCE OF 41.00 FEET; THENCE S 73°09'26" W A DISTANCE OF 2.96 FEET; THENCE S 17°06'23" E A DISTANCE OF 2.45 FEET;THENCE ALONG A CURVE TO THE RIGHT,HAVING A RADIUS OF 512.50 FEET AND A CHORD BEARING AND DISTANCE OF S 11°27'00" E, 101.03 FEET; THENCE S 05°47'36" E A DISTANCE OF 86.21 FEET; THENCE S 06°11'42" E A DISTANCE OF 44.90 FEET; THENCE S 05°10'41" E A DISTANCE OF 72.10 FEET; THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 987.50 FEET AND CHORD BEARING AND DISTANCE OF S 06°06'38"E,31.14 FEET TO THE POINT OF BEGINNING,CONTAINING 20,253.03 SQ. FT. MORE OR LESS. [Page 4 of 51 EXHIBIT A, CONTINUED.... A ten-foot wide, two-way sidepath in the right-of-way along the east side of Jones Street from where the easement described in "Section a." on the City of Little Rock parcel abuts the southern terminus of the Jones Street right-of- way to the intersection of 16th street, including a required partial street widening and the development of the sidepath on the eastern side of Jones Street as shown in Exhibit A hereto attached and as shown in final engineered plans to be endorsed by Little Rock Public Works. A ten-foot wide,two-way cycle track on the surface of Jones Street against the eastern curb north of the intersection of 16th Street to the intersection of Daisy Gaston Bates Drive turning east and continuing on the surface of Daisy Gaston Bates Drive against the southern curb to a point beyond the residential housing on the north side of Daisy Gaston Bates Drive, crossing at a midblock to the northern curb,thence east to the intersection of Daisy Gaston Bates Drive and Little Rock Nine Way/Park Street,as shown in Exhibit B hereto attached and as shown in final engineered plans to be endorsed by Little Rock Public Works. This portion of the pathway will not be included on the initial construction project. [Page 5 of 5]