HomeMy WebLinkAboutDrainage Analysis 121125 P.O. BOX 241549 LITTLE ROCK, ARKANSAS 72223 PHONE: (501) 214-9141 December 10, 2025 Mr. Arsanious Hanna, P.E. City of Little Rock Planning & Development 723 W. Markham St. Little Rock, AR 72201 RE: Kanis Commercial Park Preliminary Drainage Analysis Mr. Hanna, This letter is to accompany the submitted Preliminary Plat for the subject project and provides a summary of the preliminary drainage analysis. The project will consist of 7 commercial lots located off of Kanis Rd. The project will include paving, drainage, sidewalk, water, sewer, and additional utility extensions. The existing site is a clear, undeveloped 14.43-acre parcel with steep to moderate grades. The site drains both north and south into existing drainage swales/ditches ultimately discharging into a ditch located along the west/south-west corner of the property. The rational method was used to determine the existing peak runoff for the watershed. Considering the existing cover an existing rational coefficient of 0.40 was used for the site. Time of concentrations were calculated using the TR-55 method. The existing site drains two ways with both outlets ultimately draining into the existing drainage ditch at the southwest corner of the property. The preliminary analysis includes two individual drainage basins incorporating both on-site and off-site drainage areas. These drainage basins are summarized below in Table 1 and are shown on the Preliminary Drainage Analysis drawing. EXISTING DRAINAGE AREAS Release Point Name Area (acres) Composite Runoff C Tc (min.) Q25 (cfs) Q100 (cfs) A #1 Off-site 1.67 0.71 17 27.78 33.73 On-site 9.35 0.4 #2 Off-site 8.94 0.75 13 46.28 55.94 On-site 5.33 0.4 Total Site Runoff 67.52 81.73 P.O. BOX 241549 LITTLE ROCK, ARKANSAS 72223 PHONE: (501) 214-9141 The existing drainage patterns will largely remain unchanged after construction. Proposed storm drainage infrastructure will be designed to convey the off-site and on-site run-off to the east drainage ditch. Detention will be provided on each individual lot as they develop. Detention basins will be sized to mitigate any additional post-development stormwater runoff per the City of Little Rock Drainage Manual. Sincerely, Jacob White, PE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX15.0' 25.0'15.0'15.0'10.0'SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSS SSSSSSSS S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWW >>>>>>>>>>>>>>>>>>>>DRAINAGE AREA #1 AREA: 11.02 Acre C: 0.44 TOC: 17 MIN.>>>>>>>>>>>>>DRAINAGE AREA #2 AREA: 14.27 Acre C: 0.51 TOC: 13 MIN. FLOW SEGMENT #1 SCS Sheet Flow L=100 FT S=3.45% Travel Time=11.18 FLOW SEGMENT #1 SCS Sheet Flow L=100 FT S=8.26% Travel Time=7.88 FLOW SEGMENT #2 SCS Shallow Concentrated Flow L=574 FT S=8.15% Travel Time=2.08 FLOW SEGMENT #3 SCS Channel Flow L=700 FT S=1.49% Travel Time=3.01 FLOW SEGMENT #2 SCS Shallow Concentrated Flow L=446 FT S=5.90% Travel Time=1.90 FLOW SEGMENT #3 SCS Channel Flow L=1,446 FT S=2.97% Travel Time=3.78 RELEASE POINT A 25 RAHLING CIRCLE, SUITE A-2 LITTLE ROCK, ARKANSAS 72223 PHONE: (501) 214-9141 CIVIL ENGINEERING - CONSULTING SERVICES - LAND SURVEYING JOE WHITE & ASSOCIATES, INC.