Loading...
HomeMy WebLinkAboutHDC2005-019 Facsimile Transmittal Sheet, A Letter To Mr. Hitt, and Transmission Berification Report 03/04/200511TT'Lt � City of Little Rock .. Department of Planning and Development Historic 723 West Markham Street District Little Rock, Arkansas 72201-1334 " Commission �f�v+ w o�srr�comvni yb%ow Phone: (501) 371-4790 Fax: (501) 399-3435 FACSIMILE TRANSMITTAL SHEET TO: FROM: Steve Hitt 1 �- -� Charles Bloom COMPANY- DATE: 3/4/2005 FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: 501-372-4621 3 7 %( Z r` it. RE: YOUR REFERENCE NUMBER: Eastside Auditorium Eastside Auditorium NOTES/COMMENTS: Enclosed is: A Cover Letter - COA Application and Instructions T�i s r`S copy Parking Guidelines for MacArthur Park A Commission Calendar .S�CvR . of 11TTLt0 City of Little Rock r Department of Planning and Development 723 West Markham Street ,;- Little Rock, Arkansas 72201-1334 H�sVo.ir/D k.;,-otC L&tV Phone: (501) 371-4790 Fax: (501) 399-3435 FACSIMILE TRANSMITTAL SHEET TO: FROM: Steve Hitt Chatles Bloom COMPANY: DATE: 3/4/2005 FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: 501-372-4621 10 RE: YOUR REFERENCE NUMBER: Eastside Auditorium Eastside Auditorium NOTES/COMMENTS: Enclosed is: A Cover Letter COA Application and Instructions Parking Guidelines for MacArthur Park A Commission Calendar Historic District Commission UTTLI City of Little Rock Department of Planning and Development Historic 723 West Markham Street District Little Rock, Arkansas 72201-1334 Commission Phone: (501) 371-4790 Fax: (501) 399-3435 March 4, 2005 RE: Eastside Auditorium Development Dear Mr. Hitt, This letter is intended to let you know what we will need from your company regarding the East Side Auditorium project. We understand that you are using the Federal Rehabilitation Tax Credit and plan to restore the building to its original condition. The MacArthur Park Historic District Commission Staff will need certain information to make sure all of the materials being used for repair are genuine in order to assure compliance with the MacArthur Park Historic District standards for repair. If you have Historic Documentation proving certain materials that would be helpful. What we will need from you: ■ Scale drawings of proposed landscaping and the walkway design ■ Scale drawings of the final parking lot design ■ Elevations of the building facades ■ Details on the type of repair work including o Doors -designs and materials o Windows - designs and materials o Light stanchions designs and materials Also we have general questions that will need to be addressed regarding the south side fire escape, and pedestrian railing on the south side of the building. Will those be repaired or replaced? We will review the plans submitted at the Staff level to ensure that they are indeed repairs and no further action would be required for the repairs. On a separate note, a Certificate of Appropriateness will be required for the construction and screening of the new parking area. Reminder, the historic district guidelines state that parking areas need to be screened from view by either a fence or shrubbery. The hedges around the south parking lot are an excellent example of screening and would be encouraged for the new parking area. Feel free to contact our staff with any questions. Sincerely, r Charles Bloom Historic District Staff Enclosures (3) TRANSMISSION VERIFICATION REPORT 4 TIME : 03/04/2005 16:16 DATE,TIMt 03/04 16:11 FAX NO./NAME 93720712 DURATION 00: 04: 39 PAGE(S) 11 RESULT ©K MODE S ANDARD ' TRANSMISSION VERIFICATION REPORT TIME : 03/04/'2005 15:04 DATE, TIME 03/ 04 14.58 FAX NO./NAME 93724621 DUPATION 00: 05: 11 PAGE(S) 11 RESULT OK MODE STANDARD ECM