HomeMy WebLinkAboutHDC2022-001 COC And Fax Cover Sheet 01/24/2022The digital file includes additional items that are not in this manila
folder.
File Name: }} UL02-2- bat
Archived by: 4ewwpro
Date: o\ ) 2H 1-2-022-
DEPARTMENT OF PLANNING AND DEVELOPMENT
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435
CERTIFICATE OF COMPLIANCE
HDC2022-001
Property Owner: Harry & Mildred Loucks
Address of Property: 1415-1417 Cumberland
Project Description with Conditions listed:
Removal of vinyl siding from southeast section of the structure involving the southern and
eastern elevations, including the removal of a vinyl porch enclosure. Original wood siding
beneath the vinyl cover will be repaired, or replaced if necessary. Replacement siding will
match the original, including board size. Replacement hoards will be beveled pine. Original
comer boards will be duplicated in their full original dimensions. All boards will be painted.
Replacing current asphalt shingle roofing with fiberglass asphalt architectural shingles, GAF
Timberline HDZ, with a described `wood -shake look" style.
1) Wood Siding and Trim Board Repair
a) Trim Boards and Siding Repair
1) Remove damaged trim boards and siding pieces and replace with boards of same dimension, shape
and profile.
11) Caulk, prime, and paint
b) Trim Boards around Windows
1) Remove damaged trim boards and replace with boards of same dimension, shape and profile. Match
details of existing windows.
ii) Caulk, prime, and paint after stucco repair has been completed.
2) Wood Soffit and Fascia Repair
a) Remove damaged soffit and fascia pieces and replace with wood boards of same dimension, shape and
profile.
b) Caulk, prime, and paint
3) Painting
a) Scrape areas as needed, avoiding damage to material.
b) Apply one coat of primer, and two coats of paint.
4) Roofing
a) Remove multiple layers of asphalt roofing and/or additional layers of roofing materials.
b) Repair decking with boards of same thickness, (plywood, chipboard, or U6 boards for decking.)
c) Drip edge may be installed. Paint exposed edge to match fascia.
d) Gutters may be removed and replaced if necessary for roof installation.
e) No changes will be made to the roof pitches, gables, or valleys.
f) Reroof with architectural shingles.
Staff ignat d re Date of COC
The original is printed on pale orange paper.