Loading...
HomeMy WebLinkAboutHDC1990-011 Letter Describing Roof MaterialSTORM WINDOWS SEAMLESS ALUMINUM GUTTER STORM DOORS REPLACEMENT WINDOWS ROOM ADDITIONS WEATHER -TIGHT 196 S i 5500 MabetvaLte Pike 960 T Li ttee Rock, AR. 72209 562-7777 on 562-7778 November 27, 1990 Poe Travel 915-917 Cumberland Little lock, AR 72202 376-4171 ROOFING SIDING INSULATION REMODELING (Batts - Blown) 1. Permit. 2. North side, rotten decking: Remove shinglesti'ti. this area (approx. 5' x 3'). Remove & replace rotted exposed deck- ing, matching existing. Fill in with layered shingles with top shingle..m.atch;ing as close as possible to existing. 3. Remove & replace. 4 rotted 2x4's on back steps. 4.-Remove & replace 1 door sill on back. 5. -Remove & replace lattice under back porch & on front of addition connecting 2 buildings. 6. Set 4x4 post back on concrete block on stairs going to -2nd floor. Attach angle bracket to hold in place. 7. Install new window lintel over 1 south window where missing. Same configuration as others. 8. Install new wood shakes where missing in gable ends. -Bad wood in large overhang,on back, fill in with putty be- fore painting.. 10. Remove & replace 1 rotted window facing, sill & 1 mullion on north side of south building. 11. On south side of north building: Remove shingles (approx. 5' x 4') above hole in overhang. 12. Repair hole in roof decking & fill in with'layered shingles and, top shingled matching as close as possible to existing. 13. Install new wood soffit, fascia'& crown molding matching existing (approx. 4-lineal feet). 14. Remove & replace (approx. 11 lineal feet) of rotted soffit on north side of south building. SIDING: 15 -Not covering soffit, fascia, frieze, window. & door facings, lintels, sills, water table board & drip cap.beneath 1st course of siding, corner boards, vertical boards covering joints where house was added on to,'shakes in gables, nor gable vents. On back side of south building; leave old. flooring showing (except have aluminum flashing over top side); in recessed area, install siding between boards. 1 Poe Travel - Page 2 .WINDOWS ,cM DOORS PLACEMENT WINDOWS .ROOM ADDITIONS Since 1966 SEAMLESS ALUMINUM GUTTER 3 WEATHER -TIGHT • 5500 MabetvaLte Pike L.i.ttte Rock, AR. 72209 562-7777 on 562-7778 ROOFING SIDING INSULATION (Batts - Blown) REMODELING 16. Install Mastic brushed wood double 4" vinyl siding Calmost smooth) on remaining vertical wall areas. Not using under- layment behind siding. 17. Where siding meets any wood trim, caulk, using paintable silicone. 18. Scrape, prime with oil base primer & latex overcoat on all wood not being covered, listed in #15 'above, including steps (that are red now) and lattice listed on #5 & gutters. 19. Only door figured painted, is 2nd floor door on back of south building. SUB TOTAL $18, 040.00 20. Add for painting foundation (also AC units painted now). 745.00 21. All of the above work is excluding the front of each building. TOTAL WITH FOUNDATION PAINTING $18,785.00 THANKS! FORREST GARDNER