HomeMy WebLinkAboutHDC2013-017 Parcel Details, COA Expiration, From 9/11/2006 Minutes And 10/13/2008. 7/15/2013ARCountyData.com
Page 1 of 2
Will.�
Data.cam
. Links a,
PARCEL DETAILS
Home
h1y_A�r,¢un,J
,
Basic Information
Conrad Us
Parcel Number: 34LO200203000
HeID
County Name: Pulaski County
Ownership Information: DUNCAN INVESTMENTS LLC
New Users
902 CUMBERLAND ST
About our Service
LITTLE ROCK, AR
Account Slonuo
Mau This Address
Test Drive
Billing Information f?j: DUNCAN INVESTMENTS LLC
902 CUMBERLAND ST
LITTLE ROCK AR 72202
A Sen*9 01
Total Acres: 0.64
Timber Acres: 0.00
1n:nrmatit
Sec-Twp-Rng: 2-1N-12
SNE,ms, Inc.
Lot/Block: 9-12/25
Subdivision: CITY OF LR L2
Legal Description: CITY OF LR LTS 9-10-11 & 12 EXC 41 SQ FT MOL FOR R/W
School District: 001 LRSD - 001
Homestead Parcel?: No
Tax Status: Taxable
Over 65?: No
Land Information
Land Divisions: Land Type Quantity Front Width Rear Width Depth I Depth 2 Quarter
COMSQFr 27,878 sgft
Valuation Information
Appraised Assessed
Land: 130,750 26,150
Improvements: 213,850 42,770
Total Value: 344,600 68,920
Taxable Value: 68,920
Millage: 0.0701
Estimated Taxes L?l: $4,831.29
Assessment Year: 2012
Sales History
Ll
Date Price Grantor Grantee
Book Page Deed Type
9/30/2011 335,000 GRAVES PROPERTIES LLC DUNCAN INVESTMENTS LLC
201 : 058434 WD(Warranty Deed)
2/1/1999 0 GRAVES TO CITY OF
99 008968 WADS
11/1/1998 229,000 COLUMBUS TO SAME
98 92858 DEED(Deed)
Improvement Information
Commercial Improvements
Commercial Improvement #1
Building Section #: 1
Business Name: GRAVES LITHO SERVICE
Location: 902 CUMBERLAND ST LITTLE ROC
Total SF: 8,284
Stories: 1
Year Built: 1960
Effective Age: 25
Occupancy: Code Description Class Percent
344 Office Building C-2 100%
Additive Items: Description Qty.
Paving 2" Asphalt Paving-2" base 12260
Structural Elements: Description Qty.
Ceilings Painted Dry Wall X
Electrical Average X
Log In
http://www.arcountydata.com/parcel.asp?County=Pulaski&ParcelID=34L0200203000 7/15/2013
(b) GDR Expirafiorr. A certificate of aggropriateness shall expire if all ermits re uired for
constructing or altering structures are not obtained within one 1 ear of the commission's
apgroval of the certificate of approgriateness. If all re uired permits are obtained within one 1
year of the commission's approval of the certificate of a ro riateness the certificate of
appropriateness shall be valid as long as each permit remains valid. if a building ermit or other
permit granted for purposes of constructing or altering structures is not required, a certificate of
agpropriateness shall be valid for one ear• and the groiect must be completed within that on
year period. A six-month extension of a certificate of a ro riateness may be Cirantod by the
commission based on ood cause beyond the control of the agplicant. All apUlications for
extension of a certificate of apgrol2riateness must be submitted to the commission at least one
1 month prior to expiration of the certificate of appropriateness.
s
ARCountyData.com Page 2 of 2
Exterior Walls Brick Veneer X
Exterior Walls Non Bearing X
Floor Covering Carpet X
Floor Structure Slab Grade X
Foundation Concrete X
Heating and Cooling Warm and Cool Air X
Insulation Roof X
Interior Finish Dry Wall X
Plumbing Lavatory X
Plumbing Water Closet X
Plumb-ng Water Neater X
Roof Cover Tar & Gravel X
Roof Structure Steel Joist, Comp X
Site Work Preperation X
Structural Frame Concrete Block X
Building Section #: 2
Business Name:
Location:
Total SF: 2,352
Stories: 1
Year Built: 1960
Effective Age: 25
Occupancy: Code Description Class Percent
406 Storage Warehouse C-2 100
Structural Elements: Description
Qw.
Ceilings None
X
Electrical Average
X
Exterior Walls Brick Veneer
X
Exterior Walls Non Bearing
X
Floor Covering None
X
Floor Structure Slab Grade
X
Foundation Concrete
X
Heating and Cooling Suspended Heaters
X
Insulation Roof
X
Interior Finish None
X
Plumbing Lavatory
X
Plumbing Water Closet
X
Plumbing Water Heater
X
Roof Cover Tar & Gravel
X
Roof Structure Steel Joist, Comp
X
Site Work Preperation
X
Structural Frame Concrete Block
X
pc 2013 Apprentice InformationSystems, Inc.
Privacy Policy I Terms of Use
http://www.arcountydata.com/parcel.asp?County=Pulaski&ParcelID=34L0200203000 7/15/2013
Below are excerpts of the minute records of discussion on time limits.
From 9-11-06 minutes:
The topic of time limits for completion or commencement of COA's were discussed by the
Commission. It was decided by the commission to add it to the Staff Recommendations on a
case -by -case basis.
From 10-13-08 minutes:
A discussion ensued on time conditions on COA's, in particular, the vacant lot on Rock Street by
Answerfone. Mr. Minyard asked of Ms. Weldon if the time condition ran out, would the applicant
have to reappear before the commission before proceeding with work if there was no changes.
She stated that the commission would have to give permission t❑ Staff to do that. Chairman
Peters asked if a motion could be made to give permission to Staff to do so under dire
circumstances. Ms. Weldon asked who determined "dire circumstances"? Chairman Peters
said he had enough faith in Staff to do that. Mr. Minyard stated that Staff would be changing the
motion if the Staff changed fhe time condition. Ms. Weldon said that she would look into it and
was not sure that Staff could do that. Chairman Peters said that some applications needed a
time restraint where others did not. Eve Gieringer stated that with the opposition to the house
on Rock Street, the neighbors are counting on the time constraint and could feel betrayed by
Staff If it was extended without their notification. The applicant should be involved with the time
condition and agree to such in the meeting. Commissioner Bob Wood asked that the
Commission be consistent in applying time conditions. Ms. Weldon stated that different scales
of projects would require different time limits.
From 1-12-09 minutes:
A discussion was held on the appropriateness of time limits with comments on small,
medium, and large projects. It was discussed by the Commission to not have time limits on the
Staff Recommendations or listed in the motion. It was discussed that the Commissioners could
ask of the applicant, during the hearing, what the timetable was for the item. Page 10 of the
report was discussed and the other time limits of other boards and commissions and building
permits. Commissioner Wiedower asked that the Commission be friendly and work with the
applicants on the time limits. The time limits do not affect the COA - the actual projects look and
materials. If a project drags on too long, Staff can put a Stop Work Order on them when their
building permit runs out.
After further discussion of the differing scales of projects, the Commission decided that the
Staff should not list time limits in the staff report and that the Commission should not enforce
time limits. The Commission can ask the applicant in the hearing about the timeline. A note
can be made to obtain a building permit in the recommendation.
From 7-9-12 minutes
Statewide responses
Original email question: