Loading...
HomeMy WebLinkAboutHDC2011-014 Email To Anncha Briggs Frrom Brian Minyard 04/15/2011Page 1 of 1 Minyard, Brian From: Minyard, Brian Sent: Friday, April 15, 2011 12:21 PM To: 'Anncha Briggs' Subject: RE: P1010003.JPG hostel roof and sola tubes Is the men's bathroom in the dormer to the south? check out the floor plan in the attached PDF. It should have some notes. This has NOT been approved yet, but I think I can. respond if you think this will work. Brian Minyard, AICP bminyard@littlerock.org (501) 371-4789 fax (501) 399-3435 Please consider the environment before printing this e-mail. -----Original Message ----- From: Anncha Briggs [mailto:annchal@aol.com] Sent: Thursday, April 14, 2011 9:45 PM To: Minyard, Brian Cc: Gardner, Matt; Greg Hart; Tom Fennell Subject: P1010003.JPG hostel roof and sola tubes Brian, I am glad I ran into you tonight so we could talk about the hostel's new roof. The roofer has the red shingles in stock and is waiting for me to order two sola tubes before he gets started. I have looked at Velux, Natural Lighting and the original version Solatube http://www.solatube.com/index.php which I have used in the past and would feel most comfortable ordering. It is my understanding they will be placed on the south side of the building, but don't know exactly where. The men's bathroom will get one, a 10" wide, with a 4 ' extension, pitched shingle and a vusion diffuser. Over the staircase a 14 " wide, with a 6' extension, pitched shingle and a vusion diffuser. It may be that I can use a 21" tube for the hallway. I was going to call the rep this afternoon and discuss the sizes with him and place the order. Since the 21" is a commercial version and needs a few additional items I really wanted to talk it over with him first. The men's bathroom (204) and the staircase (201) opening are both in the middle of the building. Thanks for taking the time to look at this for me. They will not stick out more than the vents you see on the roof now. You will not recognize the inside. Our volunteer firefighters have done such a marvelous job with the demolition. Very little left to remove. We cannot do anything inside until we have a new roof because it is leaking. Anncha PS plans below 4/15/2011