Loading...
HomeMy WebLinkAboutS-00867-WWWWWWWWWW ApplicationSi IIZ5112-5 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: CALION COURT PHASE 3 I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: _ ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for final plat approval have been satisfied. Civil Engineer I/II SURVEYOR REPORT I have reviewed the plat and find that: All requir ments for final plat approval have been satisfied. Surveyor MANAGER APPRO AL All Civil Engineering requirements for filing this final plat have been satisfied. Date: Design Review Engineer/Civil Engineering Manager Date: i]ate: f 2 S= 2 8 Zg�- Effective September 25, 2025 City of Little Rock Planning and Development Filing Fees Date 9/25 Annexation Board of Adjustment Cond Use Permit/T UP Easement Abandonment Final Plat Planned Zoning Dev Preliminary Plat Special Use Permit Rezoning Right -of -Way Abandonment Site Plans Street Name Change Street Name Signs Number at ea Public Hearing Signs Number at ea DEPAATM ENT OF PLANNING & 20 25 DEVELOPMENT File No Location Calion Court, Phase 3 Applicant White-Daters & Assoc. By M. Moore $ $ $ 560.00 E1 $ Total $ 560 Outlook RE: Calion Court Phase 3 Final Plat From Harper, Vance <VHarper@littlerock.gov> Date Thu 9/25/2025 12:45 PM To Ben Wells <bwells@whitedaters.com> Cc Timothy Daters <tdaters@whitedaters.com>; Moore, Monte <MMoore@littlerock.gov> Sounds good, Thanks Ben Vance Harper Civil Engineer I Department of Public Works 0:501-399-3496 08/06 VHarlaer@littleroLk.raov From: Ben Wells <bwells@whitedaters.com> Sent: Thursday, September 25, 2025 12:44 PM To: Harper, Vance <VHarper@littlerock.gov> Cc: Timothy Daters <tdaters@whitedaters.com>; Moore, Monte <MMoore@littlerock.gov> Subject: Re: Calion Court Phase 3 Final Plat EXTERNAL EMAIL - This email was sent by a person from outside your organization. Exercise caution when clicking links, opening attachments or taking further action, before validating its authenticity. Bill of Assurance says that Tract E will be maintained by POA. Ben Wells, P.E., S.I. White-Daters & Associates, INC. 24 Rahling Circle Little Rock, Arkansas 72223 Ph: (501) 821-1667 Cell: (501) 213-5430 From: Harper, Vance <VHarper@ littlerock.gov> Sent: Thursday, September 25, 2025 12:39 PM To: Ben Wells <bwellsyhitedaters.com> Cc: Timothy Daters <tdaters@ whited aters.com >; Moore, Monte <MMoore littierock.gov> Subject: RE: Calion Court Phase 3 Final Plat Only comment is to state who will maintain tract E. 15 Outlook FW: Chenal Valley - Calion Court Phase 3 Final Plat From GURLEY, JOHN CURTIS <JG0866@att.com> Date Tue 8/26/2025 10:11 AM To Ben Wells <bwells@whitedaters.com> B 1 attachment (767 KB) FINAL PLAT PH3.pdf, AT&T approves the final plat as shown in the attached file. John Gurley MGR OSP Engineering AT&T Arkansas 501-707-8223 From: MURDOCK, RODERICK D <rx531e@att.com> Sent: Tuesday, August 26, 2025 10:06 AM To: GURLEY, JOHN CURTIS <JG0866@att.com> Subject: FW: Chenal Valley - Calion Court Phase 3 Final Plat Roderick (Rod) Murdock SR Specialist OSP Design Engineer Phone: 501-313-7784, Email: RX5 11 E r@ATT.COM Rethink Possible 17000 Cantrell Road Little Rock, Arkansas 72223 Outlook RE: Chenal Valley - Calion Court Phase 3 Final Plat From Henderson, Jeremy <jhende9@entergy.com> Date Tue 8/26/2025 10:35 AM To Ben Wells <bwells@whitedaters.com> Cc Vance, Brad <BVANCE1 @entergy.com> Entergy approves. Thanks! Jeremy Henderson Distribution Engineering Entergy Arkansas, LLC 9 Entergy Ct. Little Rock, AR 72211 501-223-6125 entergy From: Ben Wells <bwells@whitedaters.com> Sent: Tuesday, August 26, 2025 10:00 AM To: WESTBROOK, JOHN <jw7676@att.com>; Hill, Richard <richard_hi112@comcast.com>; cenhrt- south_little_rock_construction@comcast.com; PATTERSON, KEVIN <KP4080@att.com>; Andrew Pownall <Andrew.Pownall@carkw.com>; Adam Gober <agober@summitutilities.com>; Terrian Tyler <Terrian.Tyler@Irwra.com>; smangan@summitutilities.com; Jason Lowder <Jason.Lowder@carkw.com>; Matthew A. Smith <Matthew.Smith@carkw.com>; Henderson, Jeremy <jhende9@entergy.com>; Vance, Brad <BVANCEI@entergy.com>; Collins, Jesse <Jesse_Collins@comcast.com>; tm994e@att.com; jm4138@att.com; alyrodgers@summitutilities.com; nmullen@summitutilities.com; MURDOCK, RODERICK D <rx531e@att.com>; Jay Whisker <Jay.Whisker@lrwra.com> Cc: Erika Glidden <erika@whitedaters.com> Subject: Chenal Valley - Calion Court Phase 3 Final Plat HIGH RISK: UNTRUSTED EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way, DO NOT provide your User ID or Password. Attached for approval is the plat of Chenal Valley - Calion Court Phase 3. The owners would like to file and record this plat next week. An email response or signed copy via email will suffice in lieu of a signed paper copy. Any questions maybe directed towards me or Tim Daters at tdaters@whitedaters.com or 501- 821-1667. Outlook RE: [EXTERNAL EMAIL] Chenal Valley - Calion Court Phase 3 Final Plat From Alyssa Rodgers <alyrodgers@summitutilities.com> Date Tue 8/26/2025 10:49 AM To Ben Wells <bwells@whitedaters.com> Summit Utilities has no objections to this plat. Thanks! Alyssa Rodgers Gas Engineer (m) 501.577.09281 www.SurnmitUtilitiesinc.com alyLodgers@summitutilities.com From: Ben Wells <bwells@whitedaters.com> Sent: Tuesday, August 26, 2025 10:00 AM To: WESTBROOK, JOHN <jw7676@att.com>; Hill, Richard <richard_hi112@comcast.com>; cenhrt- south_little_rock_construction@comcast.com; PATTERSON, KEVIN <KP4080@att.com>; Andrew Pownall <Andrew.Pownall@carkw.com>; Adam Gober <agober@summitutilities.com>; Terrian Tyler <Terrian.Tyler@lrwra.com>; Suzy Mangan <smangan@summitutilities.com>; Jason Lowder <Jason. Lowder@ca rkw.com>; Matthew A. Smith <Matthew.Smith@carkw.com>; Henderson, Jeremy <jhende9@entergy.com>; Vance, Brad <BVANCEI@entergy.com>; Collins, Jesse <Jesse_Collins@comcast.com>; tm994e@att.com; jm4138@att.com; Alyssa Rodgers <alyrodgers@summitutilities.com>; Nikki Mullen <nmullen@summitutilities.com>; MURDOCK, RODERICK D <rx531e@att.com>; Jay Whisker <Jay.Whisker@lrwra.com> Cc: Erika Glidden <erika@whitedaters.com> Subject: [EXTERNAL EMAIL] Chenal Valley - Calion Court Phase 3 Final Plat Attached for approval is the plat of Chenal Valley - Calion Court Phase 3. The owners would like to file and record this plat next week. An email response or signed copy via email will suffice in lieu of a signed paper copy. Any questions may be directed towards me or Tim Daters at iria it r s O whitedaters.com or 501- 821-1667. Ben Wells, P.E., S.I. White-Daters & Associates, INC. 24 Rahling Circle Little Rock, Arkansas 72223 Ph: (501) 821-1667 Cell: (501) 213-5430 Outlook RE: Chenal Valley - Calion Court Phase 3 Final Plat From Fulmer, Curt <Curt_Fulmer@comcast.com> Date Tue 8/26/2025 11:03 AM To Ben Wells <bwells@whitedaters.com>; WESTBROOK, JOHN <jw7676@att.com>; Hill, Richard <Richard_Hi112@comcast.com>; [CENHRT-South Little Rock Construction] <CENHRT- South_Little_Rock_Construction@comcast.com>; PATTERSON, KEVIN <KP4080@att.com>; Andrew Pownall <Andrew.Pownall@carkw.com>; Adam Gober <agober@summitutilities.com>; Terrian Tyler <Terrian.Tyler@lrwra.com>; smangan@summitutilities.com <smangan@summitutilities.com>; Jason Lowder <Jason.Lowder@carkw.com>; Matthew A. Smith <Matthew.Smith@carkw.com>; Henderson, Jeremy <jhende9@entergy.com>; Vance, Brad <BVANCE1 @entergy.com>; Collins, Jesse <Jesse_Collins@comcast.com>; tm994e@att.com <tm994e@att.com>;jm4l38@att.com <jm4138@att.com>; alyrodgers@summitutilities.com <alyrodgers@summitutilities.com>; nmullen@summitutilities.com <nmullen@summitutilities.com>; MURDOCK, RODERICK D <rx531e@att.com>; Jay Whisker <Jay.Whisker@lrwra.com> Cc Erika Glidden <erika@whitedaters.com> Comcast has no objections. From: Ben Wells <bwells@whitedaters.com> Sent: Tuesday, August 26, 2025 10:00 AM To: WESTBROOK, JOHN <jw7676@att.com>; Hill, Richard <richard_hi112@comcast.com>; [CENHRT-South Little Rock Construction] <cenhrt-south_little_rock_construction@comcast.com>; PATTERSON, KEVIN <KP4080@att.com>; Andrew Pownall <Andrew.Pownall @carkw.com>; Adam Gober <agober@summitutilities.com>; Terrian Tyler <Terrian.Tyler@lrwra.com>; smangan@summitutilities.com; Jason Lowder <Jason.Lowder@carkw.com>; Matthew A. Smith <Matthew.Smith@carkw.com>; Henderson, Jeremy <jhende9@entergy.com>; Vance, Brad <BVANCEI@entergy.com>; Collins, Jesse <Jesse_Collins@comcast.com>; tm994e@att.com; jm4138@att.com; alyrodgers@summitutilities.com; nmullen@summitutilities.com; MURDOCK, RODERICK D <rx531e@att.com>; Jay Whisker <Jay.Whisker@lrwra.com> Cc: Erika Glidden <erika@whitedaters.com> Subject: [EXTERNAL] Chenal Valley - Calion Court Phase 3 Final Plat Attached for approval is the plat of Chenal Valley - Calion Court Phase 3. The owners would like to file and record this plat next week. An email response or signed copy via email will suffice in lieu of a signed paper copy. Any questions may be directed towards me or Tim Daters at Ldaters@whitedaters.com or 501- 821-1667. Ben Wells, P.E., S.I. White-Daters & Associates, INC. 24 Rahling Circle Little Rock, Arkansas 72223 Ph: (501) 821-1667 Cell: (501) 213-5430 Outlook Re: [External] Re: [External] Chenal Valley - Calion Court Phase 3 Final Plat From Matthew A. Smith <Matthew.Smith@carkw.com> Date Thu 8/28/2025 11:20 AM To Ben Wells <bwells@whitedaters.com> Cc Andrew Pownall <Andrew.Pownall@carkw.com>; Jim Ferguson <Jim.Ferguson@carkw.com> B 1 attachment (3 KB) Outlook-pakgpn2l; CAW has no additional comments, approved. Thank you, Matthew Smith Engineering Central Arkansas Water Office: (501) 377-1241 Mama 1Nater 1r an!,a+ From: Ben Wells <bwells@whitedaters.com> Sent: Wednesday, August 27, 2025 2:13 PM To: Matthew A. Smith <Matthew.Smith@carkw.com> Cc: Andrew Pownall <Andrew.Pownall@carkw.com>; Jim Ferguson <Jim.Ferguson @carkw.com> Subject: [External] Re: [External] Chenal Valley - Calion Court Phase 3 Final Plat [CAUTION:] This email originated from outside of the CAW. Do not click links or open attachments unless you recognize the sender and know the content is safe. Us and Potlatch are working on them, but in the mean time we just need approval on the plat. Ben Wells, P.E., S.I. White-Daters & Associates, INC. 24 Rahling Circle Little Rock, Arkansas 72223 Ph: (501) 821-1667 Cell: (501) 213-5430 Outlook Re: Chenal Valley - Calion Court Phase 3 Final Plat From Terrian Tyler <Terrian.Tyler@lrwra.com> Date Wed 9/17/2025 12:05 PM To Ben Wells <bwells@whitedaters.com> Cc Erika Glidden <erika@whitedaters.com> Good afternoon, LRWRA has no objection to this plat. With best regards, Terrian Tyler Project Engineer, Developer Funded 11 Clearwater Dr. Little Rock, AR 72204 Office: (501) 688-1431 www.irwra.com LITTLE ROCK Water Reclamation ONE WATER Authorit�r ONE FUTURE. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information, and is intended only for the individual named. From: Ben Wells <bwells@whitedaters.com> Sent: Wednesday, September 17, 2025 10:08 AM To: Terrian Tyler <Terrian.Tyler@lrwra.com> Cc: Erika Glidden <erika@whitedaters.com> Subject: Re: Chenal Valley - Calion Court Phase 3 Final Plat Terrian, Just checking on if you had a chance to complete your review of the Plat? Ben Wells, P.E., S.I. White-Daters & Associates, INC. 24 Rahling Circle Little Rock, Arkansas 72223 Ph: (501) 821-1667 " Vance Harper Civil Engineer I Department of Public Works 0:501-399-3496 VHarper littlerock. ov From: Ben Wells <bwells whitedaters.com> Sent: Thursday, September 25, 2025 9:33 AM To: Harper, Vance <VHarper. littlerock.gov> Cc: Timothy Daters <tdaters whitedaters.corn>; Moore, Monte <MMoore aglittierock.gov> Subject: Calion Court Phase 3 Final Plat { EXTERNAL EMAIL - This email was sent by a person from outside your organization. Exercise caution when clicking links, opening attachments or taking further action, before validating its authenticity. Vance, Monte said that he would sign off on this today if you signed off on it. Monte leaves at 3:00 today. Ben Wells, P.E., S.I. White-Daters & Associates, INC. 24 Rahling Circle Little Rock, Arkansas 72223 Ph: (501) 821-1667 Cell: (501) 213-5430