HomeMy WebLinkAboutHDC2006-016 Map Of West To East Section At Elevator Shaft 08/08/20051X6 PLATE WITH W4' DV, STEEL ANCHORS
AT 4B'OC.
W AT 16-0 C. - MATCH EXISTING SLOPE AND HIP
2- CONTINUOUS METAL VENT
MATCH EXISTING SOFFIT, FACIA, GUTTER
ANDTRIM
CONCRETE STOOP: 4-CONC: SLAB
WI6X61 Wig W W M. OVER WASHED
GRANULATED FILL. SLOPE OUT AT
VW PER FOOT
2- CONTINUOUS METAL VENT
MATCH EXISTING SOFFIT, FACIA, GUTTER
ANOTRIM
IX4 BEADED BOARD
2 LAYERS OF "' FIRE RATED GYPSUM BOARD.
TAPE AND FLOAT EACH LAYER, STAGGER JOINTS.
PAINT INTERIOR BLACK
MATCH EXISTING DRIP CAP AND SKIRT BOARD
1' STUCCO WITH TEXTURE
TO MATCH
A' XIA° X A' L.W. CONCRETE BLOCK WITH 12 GA.
MATCH EXISTING DRIP CAP AND SKIRT BOARD
1 X4 BEADED BOARD
1' MCCO WITH TEXTURE
TO MATCH
MATCH EXISTING DRIP CAP AND SKIRT BOARD
1X4 TREATED GROUNDS AT 24' O.C.
1X4 BEADED BOARD
1' STUCCO WITH TEXTURE
TO MATCH
WATERPROOFING
CONTINUOUS FOOTING: WITH 5 k5
REBAR CONTINUOUS WITH u2 TIES
AT 16' O.C.. SUPPORT STEEL 3-ABOVE GRADE
UNDISTURBED SOIL (TYPICAL)
WEST TO EAST SECTION AT ELEVATOR SHAFT SCALE: 1/2'=1'-0-
EASTCAPMOL BRICK PAVING
WALKSG CONG.
WALKS
1
I
1
1
1
10
519 EAST CAPITOL
I
I
1
rU/
EXISIBING LONG
NEW ADDITION
WALK
0
EXISTING DIIMPSTEfl
EXISTING PARKING
SURROUND
AREA
I ..
J
]fi.6'
:I
SITE PLAN SCALE:I'=201-D-