Loading...
HomeMy WebLinkAboutHDC2006-016 Map Of West To East Section At Elevator Shaft 08/08/20051X6 PLATE WITH W4' DV, STEEL ANCHORS AT 4B'OC. W AT 16-0 C. - MATCH EXISTING SLOPE AND HIP 2- CONTINUOUS METAL VENT MATCH EXISTING SOFFIT, FACIA, GUTTER ANDTRIM CONCRETE STOOP: 4-CONC: SLAB WI6X61 Wig W W M. OVER WASHED GRANULATED FILL. SLOPE OUT AT VW PER FOOT 2- CONTINUOUS METAL VENT MATCH EXISTING SOFFIT, FACIA, GUTTER ANOTRIM IX4 BEADED BOARD 2 LAYERS OF "' FIRE RATED GYPSUM BOARD. TAPE AND FLOAT EACH LAYER, STAGGER JOINTS. PAINT INTERIOR BLACK MATCH EXISTING DRIP CAP AND SKIRT BOARD 1' STUCCO WITH TEXTURE TO MATCH A' XIA° X A' L.W. CONCRETE BLOCK WITH 12 GA. MATCH EXISTING DRIP CAP AND SKIRT BOARD 1 X4 BEADED BOARD 1' MCCO WITH TEXTURE TO MATCH MATCH EXISTING DRIP CAP AND SKIRT BOARD 1X4 TREATED GROUNDS AT 24' O.C. 1X4 BEADED BOARD 1' STUCCO WITH TEXTURE TO MATCH WATERPROOFING CONTINUOUS FOOTING: WITH 5 k5 REBAR CONTINUOUS WITH u2 TIES AT 16' O.C.. SUPPORT STEEL 3-ABOVE GRADE UNDISTURBED SOIL (TYPICAL) WEST TO EAST SECTION AT ELEVATOR SHAFT SCALE: 1/2'=1'-0- EASTCAPMOL BRICK PAVING WALKSG CONG. WALKS 1 I 1 1 1 10 519 EAST CAPITOL I I 1 rU/ EXISIBING LONG NEW ADDITION WALK 0 EXISTING DIIMPSTEfl EXISTING PARKING SURROUND AREA I .. J ]fi.6' :I SITE PLAN SCALE:I'=201-D-