Loading...
HomeMy WebLinkAboutHDC2005-0012 Map Of West to East Section At Elevator Shaft 08/08/20051X6 PLATE WITH &4- DW. STEEL ANCHORS AT 48' O.C. 2aB AT 16' O.C. -MATCH EXISTING SLOPE AND HIP 2" CONTINUOUS METAL VENT MATCH EXISTING SOFFIT, FACIA, GUTTER AND TRIM CONCRETE STOOP: 4• GONG, SLAB WI6X61NIO W W.M.OVER WASHED GRANULATED FILL SLOPE OUT AT AM' PER FOOT 2" CONTINUOUS METAL VENT MATCH EXISTING SOFFIT, FACIA, GUTTER AND TRIM 1 X4 BEADED BOARD 2 LAYERS OF AMP FIRE HATED GYPSUM BOARD, TAPE AND FLOAT EACH LAYER, STAGGER JOINTS PAINT INTERIOR BLACK MATCH EXISTING DRIP CAP AND SKIRT BOARD 1- STUCCO WITH TEXTURE TO MATCH e' X18" X 8' L. W. CONCRETE BLOCK WITH 12 GA. TRUSSED MASONRY REINFORCING AT IV O.C. - VERTICALLY. INSTALL 2 -06 REBAR VERTICALLY FROM TOP BOND BEAM TO FOOTING STEEL - TIE TO FOOTING STEEL. FILL VOID WITH 3=4 CONCI LOCATE VERTICAL STEEL IN CORNER BLOCKS AN 24" O.C. IN WALLS. 1 X4 BEADED BOARD 1-STUCCO WITH TEXTURE TO MATCH MATCH EXISTING DRIP CAP AND SKIRT BOARD IX4 TREATED GROUNDS AT 24. O.C. 1X4 BEADED BOARD 1"STUCCO WITH TEXTURE TO MATCH CONTINUOUS FOOTING: WITH 5 Y5 ASSAF CONTINUOUS WITH M2 TIES AT 16" OA., SUPPORT STEEL W MOVE GRADE UNDISTURBED SOIL MPICAL) WEST TO EAST SECTION AT ELEVATOR SHAFT SCALE: 1/2•=1'-O' EASTCAPITOL u T SITE PLAN SCALE:1 =20W BRICK PAVING EXISTING GONG, WALKS 1— NEW ADDITION EXIBTING WMPSTER SURROUND