HomeMy WebLinkAboutHDC2005-0012 Map Of West to East Section At Elevator Shaft 08/08/20051X6 PLATE WITH &4- DW. STEEL ANCHORS
AT 48' O.C.
2aB AT 16' O.C. -MATCH EXISTING SLOPE AND HIP
2" CONTINUOUS METAL VENT
MATCH EXISTING SOFFIT, FACIA, GUTTER
AND TRIM
CONCRETE STOOP: 4• GONG, SLAB
WI6X61NIO W W.M.OVER WASHED
GRANULATED FILL SLOPE OUT AT
AM' PER FOOT
2" CONTINUOUS METAL VENT
MATCH EXISTING SOFFIT, FACIA, GUTTER
AND TRIM
1 X4 BEADED BOARD
2 LAYERS OF AMP FIRE HATED GYPSUM BOARD,
TAPE AND FLOAT EACH LAYER, STAGGER JOINTS
PAINT INTERIOR BLACK
MATCH EXISTING DRIP CAP AND SKIRT BOARD
1- STUCCO WITH TEXTURE
TO MATCH
e' X18" X 8' L. W. CONCRETE BLOCK WITH 12 GA.
TRUSSED MASONRY REINFORCING AT IV O.C. -
VERTICALLY. INSTALL 2 -06 REBAR VERTICALLY
FROM TOP BOND BEAM TO FOOTING STEEL - TIE
TO FOOTING STEEL. FILL VOID WITH 3=4 CONCI
LOCATE VERTICAL STEEL IN CORNER BLOCKS AN
24" O.C. IN WALLS.
1 X4 BEADED BOARD
1-STUCCO WITH TEXTURE
TO MATCH
MATCH EXISTING DRIP CAP AND SKIRT BOARD
IX4 TREATED GROUNDS AT 24. O.C.
1X4 BEADED BOARD
1"STUCCO WITH TEXTURE
TO MATCH
CONTINUOUS FOOTING: WITH 5 Y5
ASSAF CONTINUOUS WITH M2 TIES
AT 16" OA., SUPPORT STEEL W MOVE GRADE
UNDISTURBED SOIL MPICAL)
WEST TO EAST SECTION AT ELEVATOR SHAFT SCALE: 1/2•=1'-O'
EASTCAPITOL
u T
SITE PLAN SCALE:1 =20W
BRICK PAVING
EXISTING GONG,
WALKS
1— NEW ADDITION
EXIBTING WMPSTER
SURROUND