Loading...
HomeMy WebLinkAboutWork Plan:DOOR 1 07ft L- 16'4"ft L Wall A TftiL WORK REA 4'8"ftL Wall D 9'4"ft L ................................................I 18'ftL ............................................. Will B 27ft L Wall E 8'8"ft Wall C 7ft New footings 17"in deep x 18"in wide x I Z t WALLS (►4,B,C,& D) 4 - (4x4x10) wood (Posts for Walls A, B, C, D) 3 - 44 Galvanized Adjustable Standoff Post Base for 44 Nominal Lumber (Wall A posts, more support) *12 - (2xAlx12) wood studs *24 - (2xdlx10) wood studs *4 - (2x4)r8) wood studs *port header 2- 2x10x10L or 1- 4x10x10L 2 - (2x4x12) Pressure treated (plates for post replacements Wall D, C and B) 6 - (2x410) Pressure treated (wall plates) 50ft x 5112" of sill plate gasket (roll of foam film) 50ft x 3112" sill plate gasket **EXTERNAL WALLS SQFT West Wall 180' sf South Wall 343' sf Fast Walls 283' sf Total sf: 800' Load bearing wall \footing specs Walls A & D - half of A only(9ft ea). Aprox 12ft tooting (18" wide x 17" deep) Wall bottom x45 bags 801b concrete plate W with x8 Hillman 112-in 112-in x 10-in Galvanized Exterior Coarse Thread Anchor Bolt 10"in anchor �, F 3.112 i hook/bolt/nut x60ft #4 rebar (% ) x10ft #3 rebar (%') Inside floor T =�, Project Source 10-Feet x 25-Feet Black 6-Mils Professional Construction film level —xYerio3 Two parallel bars at the bottom, at least 3 inches from the ground (use rebar chairs). 17" ' I "'� - ' i 18„ Vertical stirrups (#3 rebar, %') every 24 inches to hold the longitudinal bars together. 10"_ Use #3 orffi4 rebar at 12" 16"' on center (O.C.) in a grid pattern. } ".."_...__....1s.:. ..............� Ensure 3 inches of concrete coverage on all sides. Moisture Barrier (Vapor Barrier) Use 6-mil or thicker polyethylene sheeting (recommended 10-mil for durability). Extend the .farrier up the sides of the formwork to protect against ground moisture. This setup twill ensure durability and protection for your barn's foundation. Bird' dew ROOF �j MEASUREMANTS (not wall/floor) 1'-1.51 Over hang round WE\A- 18'ft Side NO WORK. AREA 10'ft L ('Wlt L ................... if ............... WE Flashing roof to wall Ridge Board .12'6"ft L . �� Side D Roof' High 8'ft L Point East Side C loft V?A:?..........+ SOUTH Side B ** the measurements shown here are the sloping measurements for the metal roof which includes 1.5ft overhang** RAFTERS & Roof Purlins 25 - (2x6x1 (6) rafters are needed. 72 - (1 x4x10) wood horizontal purlins 2 - (1x8x10) wood for peak of roof 2114"nail gun NAILS for purlins 3112" nail gun Nails for framing 9' 3"tT H South Wall B View C4-) t 5'4"ft Ris j .. Tft . ................................................. > 7112 roof slope (short roof run) 4.5112 longer roof run 10"'k H Scope of work: remove old work and rebuild roof to drawing specs and install metal roof.