HomeMy WebLinkAboutWork Plan:DOOR
1 07ft L-
16'4"ft L
Wall A
TftiL
WORK
REA
4'8"ftL
Wall D
9'4"ft L
................................................I
18'ftL
.............................................
Will B
27ft L
Wall E
8'8"ft
Wall C
7ft
New footings
17"in deep x 18"in wide x I Z t
WALLS (►4,B,C,& D)
4 - (4x4x10) wood (Posts for Walls A, B, C, D)
3 - 44 Galvanized Adjustable Standoff Post Base
for 44 Nominal Lumber (Wall A posts, more
support)
*12 - (2xAlx12) wood studs
*24 - (2xdlx10) wood studs
*4 - (2x4)r8) wood studs
*port header 2- 2x10x10L or 1- 4x10x10L
2 - (2x4x12) Pressure treated
(plates for post replacements Wall D, C and B)
6 - (2x410) Pressure treated (wall plates)
50ft x 5112" of sill plate gasket (roll of foam film)
50ft x 3112" sill plate gasket
**EXTERNAL WALLS SQFT
West Wall 180' sf
South Wall 343' sf
Fast Walls 283' sf
Total sf: 800'
Load bearing wall \footing specs
Walls A & D - half of A only(9ft ea). Aprox 12ft tooting (18" wide x 17" deep)
Wall bottom x45 bags 801b concrete
plate W with x8 Hillman 112-in 112-in x 10-in Galvanized Exterior Coarse Thread Anchor Bolt
10"in anchor �,
F 3.112 i hook/bolt/nut x60ft #4 rebar (% )
x10ft #3 rebar (%')
Inside floor T =�, Project Source 10-Feet x 25-Feet Black 6-Mils Professional Construction film
level
—xYerio3 Two parallel bars at the bottom, at least 3 inches from the ground (use rebar chairs).
17" ' I "'� - ' i 18„ Vertical stirrups (#3 rebar, %') every 24 inches to hold the longitudinal bars together.
10"_
Use #3 orffi4 rebar at 12" 16"' on center (O.C.) in a grid pattern.
} ".."_...__....1s.:. ..............� Ensure 3 inches of concrete coverage on all sides.
Moisture Barrier (Vapor Barrier)
Use 6-mil or thicker polyethylene sheeting (recommended 10-mil for durability).
Extend the .farrier up the sides of the formwork to protect against ground moisture.
This setup twill ensure durability and protection for your barn's foundation.
Bird' dew ROOF �j
MEASUREMANTS (not wall/floor)
1'-1.51 Over
hang round
WE\A-
18'ft
Side
NO WORK.
AREA
10'ft L ('Wlt L
................... if ...............
WE
Flashing
roof to wall
Ridge Board
.12'6"ft L . �� Side D Roof' High
8'ft L Point
East Side C
loft
V?A:?..........+
SOUTH
Side B
** the measurements shown here are the
sloping measurements for the metal roof
which includes 1.5ft overhang**
RAFTERS & Roof Purlins
25 - (2x6x1 (6) rafters are needed.
72 - (1 x4x10) wood horizontal purlins
2 - (1x8x10) wood for peak of roof
2114"nail gun NAILS for purlins
3112" nail gun Nails for framing
9' 3"tT H
South Wall B View C4-)
t 5'4"ft Ris j
.. Tft .
.................................................
> 7112 roof slope (short roof run)
4.5112 longer roof run
10"'k H
Scope of work: remove old work and
rebuild roof to drawing specs and install
metal roof.