HomeMy WebLinkAboutPC Minutes 101525October 9, 2025
ITEM NO.: 15 FILE NO.: Z-10205
NAME: Paris Jewelry Store
LOCATION: 8505 Geyer Springs Road
DEVELOPER:
Abraham Nepomuceno (Owner)
76 Fletcher Ridge Circle
Little Rock, AR 72223
OWNER/AUTHORIZED AGENT:
Terry Burrus (Agent)
11912 Kanis, F-8
Little Rock, AR 72211
SURVEYOR/ENGINEER:
Brooks Surveying, Incorporated
20820 Arch Street Pike
Hensley, AR 72065
AREA: 0.31 acre NUMBER OF LOTS: 1 FT. NEW STREET: 0
WARD: 2 PLANNING DISTRICT: 14 CENSUS TRACT: 41.07
CURRENT ZONING: O-3
A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT:
The applicant is proposing to rezone the site from O-3 to PD-C to allow for the
development of a commercial retail jewelry store. The applicant is also requesting
O-3 permitted uses as alternate uses for the property.
B. EXISTING CONDITIONS:
The site contains an existing brick, commercial style building that will be
demolished and replaced with a newly constructed building to serve the proposed
use. The subject property is located due south of Interstate 30, along the east side
of the Geyer Springs Road corridor (Minor Arterial). This corridor contains a
mixture of commercial/ office zoning and uses in all directions.
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
2
C. NEIGHBORHOOD NOTIFICATIONS:
All owners of property located within 300 feet of the site and all neighborhood
associations registered with the City of Little Rock were notified of the public
hearing.
D. ENGINEERING COMMENTS (PLANNING):
1. Provide ADA accessible route from the public right of way to the proposed
development in accordance with 36 CFR Part 1191 Section F206.2.1, “… at
least one accessible route shall be provided within the site from accessible
parking spaces and accessible passenger loading zones, public streets and
sidewalks, and public transportation stops to the accessible building or facility
entrance they serve.”
2. The handicap stall shall be a van accessible stall at 11ft in width and a 5ft.
minimum accessible aisle.
3. Look at widening your drive to fix the radius issue, maybe 30ft?
4. Where will your dumpsters be located?
5. Parking stalls on the west must be a minimum of 180 sqft. Please revise.
6. Fence proposed at rear shall be permitted separately. If it is 7ft or taller, then it
shall be designed by an Arkansas Licensed Engineer (Structural).
7. Provide 25 year and 100 year storm event calculations at time of building
permit.
8. A drainage study showing all hydrologic calculations for the site and all
hydraulic calculations for the proposed storm sewer pipe system, swales and
ditches, culverts, detention ponds, outlet structures, and inlets is required per
City’s stormwater management and drainage manual. For final drainage
report, sign, date, and seal the report per AR State Board of Professional
Engineers and Professional Surveyors rules Article 12, Section B (1) (a).
Provide engineer's certification statement saying this drainage report was
conducted by yourself or directly under your supervision and attesting to the
accuracy of the information within this report.
9. For final drainage report, sign, date, and seal the report per AR State Board of
Professional Engineers and Professional Surveyors rules Article 12, Section B
(1) (a).
10. Provide engineer's certification statement saying this drainage report was
conducted by yourself or directly under your supervision and attesting to the
accuracy of the information within this report.
11. Contact Planning and Development Dept., Engineering Division at 501-371-
4817 or at 501-918-5348 for inspections of any work in the public right-of-way
prior to placement of concrete or asphalt or for on-site clarification of
requirements prior to commencing work. Failure to do so can result in removal
of any improperly placed concrete or asphalt at the expense of the owner or
contractor.
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
3
12. Any work involving one (1) or more acres of disturbed area require a State of
Arkansas NPDES permit. Contact the Arkansas Department of Environmental
Quality, NPDES branch at 501-682-0744 for applications and information about
General Stormwater Discharge Construction Permit #ARR150000.
13. Hauling of cut and/or fill material on or off project sites over municipal streets
require approval prior to a grading permit being issued. Contact Public Works
Traffic Engineering at 621 S. Broadway 501-379-1800 with any questions or
for more information.
14. Damage to public and private property due to hauling operations or operations
of construction related equipment from a construction site shall be repaired by
the responsible party prior to the issuance of a certificate of occupancy.
15. The Department requires three (3) phase sediment and erosion control (SEC)
plans to be submitted for all construction projects showing best management
practices (BMPs) for mitigating sediment runoff and erosion along with
vegetation specifications for temporary and permanent soil stabilization. Phase
1 SEC plans shall show SEC BMPs during the stripping, clearing, grubbing,
and rough grading of the site. Phase 2 SEC plans shall show SEC BMPs during
construction of utilities, buildings, roadway infrastructure and drainage
infrastructure. Phase 3 SEC Plans shall show SEC BMPs for final grading,
seeding, and landscaping of the site.
16. Sediment and Erosion Control plans shall also show the pertinent information
as outlined in ADEQ ARR150000 Permit Part II section A-4-H (1-14) and Part
II section A-4-I-2 (A-B).
ENGINEERING COMMENTS (PUBLIC WORKS):
1. Due to the proposed use of the property, the Master Street Plan specifies that
Marshall Street for the frontage of this property must meet commercial street
standards. Dedicate right-of-way to 30 feet from centerline.
2. Repair or replace any curb, gutter, sidewalk and access ramps that are
damaged and not in compliance with ADA recommendations in the public right-
of-way prior to occupancy.
3. Sidewalks with appropriate handicap ramps are required in accordance with
Sec. 31-175 of the Little Rock Code and the Master Street Plan to be placed
adjacent to Marshall St.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority: No comments received.
Entergy: No comments received.
Summit Energy: No comments.
AT & T: No comments received.
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
4
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
Fire Department:
Must Comply with Arkansas Fire Prevention Code 2021 edition
All projects submitted for zoning approval must comply with the Arkansas
Fire Prevention Code, 2021 Edition, including any comments or
requirements provided by the Little Rock Fire Marshal's Office, prior to
acceptance.
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads
shall not exceed 10 percent in grade except as approved by the fire chief. If
the grade exceeds 10 percent, approval will be denied, and the applicant
must submit request to be reviewed by Fire Chief for Approval.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with asphalt, concrete or other approved driving surface capable of
supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Commercial and Industrial Developments – 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention
Code Vol. 1.
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
5
Section D104.1 Buildings exceeding three stories or 30 feet in height.
Buildings or facilities exceeding 30 feet or three stories in height shall have at least
two means of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provided with two separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square
feet that have a single approved fire apparatus access road when all
buildings are equipped throughout with approved automatic sprinkler
systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of the
maximum overall diagonal dimension of the lot or area to be served, measured in
a straight line between accesses.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 – C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshals Office (Capt.
Tony Rhodes 501-918-3757, or Fire Marshal Derek N Ingram 501-918-3756
Number and Distribution of Fire Hydrants as per Table C105.1.
If you have any additional questions, please contact our office. . Contact
Capt. Tony Rhodes at (501) 918-3757, or Fire Marshal Derek N Ingram (501)
918-3756.
Parks and Recreation: No comments received.
F. BUILDING CODES/LANDSCAPE:
Building Codes: No comments received.
Landscape:
1. Any new site development must comply with the City’s minimal landscape
and buffer ordinance requirements. Refer to the Code of Ordinances, Chapter
15 Landscaping and Tree Protection, and Chapter 36, Article IX – Buffers and
Screening.
2. Site development plans, with landscape and screening, must be submitted for
review, and approval, prior to site clearing and tree removal.
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
6
G. TRANSPORTATION/PLANNING: No comments received.
Rock Region Metro: No comments received.
Planning Division:
Land Use Plan:
The request is in Planning District 14, the Geyer Springs East Planning District.
The development principles of the district include improving street infrastructure,
pedestrian facilities, and drainage. The Land Use Plan shows Mixed Office and
Commercial (MOC) use for the requested area. The Mixed Office and Commercial
(MOC) category provides for a mixture of office and commercial uses to occur.
Acceptable uses are office or mixed office and commercial. A Planned Zoning
District is required if the use is mixed office and commercial. The application for
PD-C for a jewelry store.
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
7
The application is in the Geyer Springs Rd commercial corridor in an area
designated for Mixed Office and Commercial use. West across Geyer Springs Rd
is designated for Commercial (C) use and is characterized by a strip retail center
and free-standing restaurants and offices. East of the application is Residential
Low (RL) Density use characterized by single-family homes in developed
subdivisions.
This site is not located in an Overlay District.
Master Street Plan:
Geyer Springs Rd. is a Minor Arterial on the Master Street Plan. Minor Arterials
are high volume roads designed to provide the connections to and through an
urban area. Curb cuts should be minimized to allow for continuous traffic flow while
still allowing some access to adjoining property. Deceleration Lanes are required.
Standard Right-of-way (ROW) is 90 feet. Sidewalks are required on both sides.
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
8
This street may require dedication of right-of-way and may require street
improvements.
Bicycle Plan:
Geyer Springs Rd. is not shown on the Master Bike Plan with existing or proposed
facilities in this area.
Historic Preservation Plan:
The application, as shown, should have no effect on identified historic resources.
H. ANALYSIS:
The applicant is proposing to rezone the site from O-3 to PD-C to allow for the
development of a commercial retail jewelry store. The applicant is also requesting
O-3 permitted uses as alternate uses for the property.
The site contains an existing brick, commercial style building that will be
demolished and replaced with a newly constructed building to serve the proposed
use. The subject property is located due south of Interstate 30, along the east side
of the Geyer Springs Road corridor (Minor Arterial). This corridor contains a
mixture of commercial/ office zoning and uses in all directions.
The site will be accessed from twenty-four (24) foot wide, paved driveway apron
extending from Geyer Springs Road.
The developer will construct a 4,200 square foot building that will be constructed
on the site. The site plan shows a front building setback over twenty-five (25) feet
from the front property line, 12.5 feet from the north and south property lines and
ten (10) feet from the rear property line.
Operating hours will be from 10:00am to 7:00pm seven days a week and will have
five (5) staff at any given time.
The applicant is providing ten (10) off-street parking spaces, including one (1) ADA
parking space as required by Section 36-502 of the City’s Zoning Ordinance. Staff
feels the parking is sufficient for the proposed use.
The applicant did not provide a sign plan with this application. Any sign must
comply with Section 36-555 of the City’s Zoning Ordinance (signs permitted in
commercial zones).
The applicant notes the vendor will utilize a cleaning service for trash collection
and disposal. Any dumpster placed on the site must be screened comply with
October 9, 2025
ITEM NO.: 15 (Cont.) FILE NO.: Z-10205
9
Section 36-523(d) of the City’s Zoning Ordinance.
All site lighting shall be low-level and directed away from adjacent properties.
The site plan shows an eight (8) foot tall opaque fence along the rear property line
that will be required as the abutting subdivision to the east contains residential
zoning and uses. Any fence erected on the property must comply with Section 36-
516 of the City’s Zoning Ordinance.
To staff’s knowledge, there are no outstanding issues associated with this
application. Staff is supportive of the requested PD-C zoning for the proposed use,
including O-3 permitted uses as alternate uses. Staff views the request as
reasonable. The property was formerly commercially utilized by Diversified
Investments. The proposed commercial use is compatible with the existing
commercial uses along the Geyer Springs corridor. The jewelry store is the only
non O-3 use proposed for the property.
STAFF RECOMMENDATION:
Staff recommends approval of the requested PD-C zoning, subject to compliance
with the comments and conditions outlined in paragraphs D, E, and F, and the staff
analysis, of the agenda staff report.
PLANNING COMMISSION ACTION: (OCTOBER 9, 2025)
The applicant was present. There were no persons registered in opposition. The
item was removed from the Consent Agenda to address questions by the
commission. Commissioner Russell expressed concerns about the site plan
meeting minimum standards, setbacks, access and parking. After some discussion
there was a motion to approve the application. There was a second. The vote was
(8) ayes, (1) nays and (2) absent. The motion passed. The application was
approved.