HomeMy WebLinkAboutChecklist For Hearing Staff Report 01/28/2009PAV
ra
ZA
Checklist for hearing
Is any of the details of the building wrong in the Staff report?
One story
Pellet stove chimney location and details or
remove
Window sizes and casements versus double
hung 1- 2`6
Living room south
Bedrooms south
/
Bedrooms east
c�7-� 5�Z.
Bathrooms
Utility
Kitchen and placement
Mudroom
Depth of recess on front
Siding painted or not
Trim pieces corner and window door trim
Foundation materials
Sidinq width of trim boards
Corners and door/window
Type of door to be used
Two story
Run sidewalk to rock st instead of 15th
Address off rock
Height of floors and parapet
61
All window sizes and static, awning, or sliders
f
Color of cladding
"Siding material of battens? Width, depth
0 -C
`2�r
Hip roof and overhan pitch overhang.
materials
_
Roofing materials
Fence everywhere max height and type of
17
e
boards with size
Patio on front of house? Yes no fencing?
9 5
Foundation materials
Direct solar vent
Parking pad stones type
3�
WN
i T>4c-��