Loading...
HomeMy WebLinkAboutChecklist For Hearing Staff Report 01/28/2009PAV ra ZA Checklist for hearing Is any of the details of the building wrong in the Staff report? One story Pellet stove chimney location and details or remove Window sizes and casements versus double hung 1- 2`6 Living room south Bedrooms south / Bedrooms east c�7-� 5�Z. Bathrooms Utility Kitchen and placement Mudroom Depth of recess on front Siding painted or not Trim pieces corner and window door trim Foundation materials Sidinq width of trim boards Corners and door/window Type of door to be used Two story Run sidewalk to rock st instead of 15th Address off rock Height of floors and parapet 61 All window sizes and static, awning, or sliders f Color of cladding "Siding material of battens? Width, depth 0 -C `2�r Hip roof and overhan pitch overhang. materials _ Roofing materials Fence everywhere max height and type of 17 e boards with size Patio on front of house? Yes no fencing? 9 5 Foundation materials Direct solar vent Parking pad stones type 3� WN i T>4c-��