CERTIFICATE OF COMPLIANCE
H DC 12-023
Property Owner: Matt Pekar
Address of Property: 312 East 11th Street
Project Description with Conditions listed:
1) Brick Repair on two chimneys
a) Remove existing bricks and replace in same pattern as
existing. See photo on right.
b) Add additional bricks as needed to repair chimney. New
bricks should match existing or be placed in the least
conspicuous location possible.
c) Use Type N mortar with joint to match existing.
d) Flashing to be copper installed in step pattern in the mortar
joints of the masonry.
2) Reconstruction of Third Chimney
a) Add additional bricks as needed to repair chimney. New
bricks should match existing.
b) Use Type N mortar with joint to match existing.
c) Flashing to be copper installed in step pattern in the mortar
joints of the masonry.
3)
Roofing
a) Remove multiple layers of asphalt roofing and/or additional layers of roofing materials.
b) Repair decking with boards of same thickness, (plywood, chipboard, or 1x boards for decking.)
c) Reroof with architectural shingles.
i) No changes will be made to the roof pitches, gables, or valleys.
d) Install ridge vent as needed.
Staff Signature
I (- k (,Z/
Date of COC
The original. is printed on pale orange paper.
DEPARTMENT OF PLANNING AND DEVELOPMENT
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435
CERTIFICATE OF COMPLIANCE
Property Owner: Matt Pekar
Address of Property: 312 East 11th Street
Project Description with Conditions listed:
1) Brick Repair on two chimneys
a) Remove existing bricks and replace in same pattern as
existing. See photo on right.
b) Add additional bricks as needed to repair chimney. New
bricks should match existing or be placed in the least
conspicuous location possible.
c) Use Type N mortar with joint to match existing.
d) Flashing to be copper installed in step pattern in the mortar
joints of the masonry.
2) Reconstruction of Third Chimney
a) Add additional bricks as needed to repair chimney. New
bricks should match existing.
b) Use Type N mortar with joint to match existing.
c) Flashing to be copper installed in step pattern in the mortar
joints of the masonry.
3)
H DC 12-023
Kooting
a) Remove multiple layers of asphalt roofing and/or additional layers of roofing materials.
b) Repair decking with boards of same thickness, (plywood, chipboard, or 1 x boards for decking.)
c) Reroof with architectural shingles.
i) No changes will be made to the roof pitches, gables, or valleys.
d) Install ridge vent as needed.