Loading...
HomeMy WebLinkAboutHDC2012-023 Final ActionDEPARTMENT OF PLANNING AND DEVELOPMENT 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 CERTIFICATE OF COMPLIANCE H DC 12-023 Property Owner: Matt Pekar Address of Property: 312 East 11th Street Project Description with Conditions listed: 1) Brick Repair on two chimneys a) Remove existing bricks and replace in same pattern as existing. See photo on right. b) Add additional bricks as needed to repair chimney. New bricks should match existing or be placed in the least conspicuous location possible. c) Use Type N mortar with joint to match existing. d) Flashing to be copper installed in step pattern in the mortar joints of the masonry. 2) Reconstruction of Third Chimney a) Add additional bricks as needed to repair chimney. New bricks should match existing. b) Use Type N mortar with joint to match existing. c) Flashing to be copper installed in step pattern in the mortar joints of the masonry. 3) Roofing a) Remove multiple layers of asphalt roofing and/or additional layers of roofing materials. b) Repair decking with boards of same thickness, (plywood, chipboard, or 1x boards for decking.) c) Reroof with architectural shingles. i) No changes will be made to the roof pitches, gables, or valleys. d) Install ridge vent as needed. Staff Signature I (- k (,Z/ Date of COC The original. is printed on pale orange paper. DEPARTMENT OF PLANNING AND DEVELOPMENT 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 CERTIFICATE OF COMPLIANCE Property Owner: Matt Pekar Address of Property: 312 East 11th Street Project Description with Conditions listed: 1) Brick Repair on two chimneys a) Remove existing bricks and replace in same pattern as existing. See photo on right. b) Add additional bricks as needed to repair chimney. New bricks should match existing or be placed in the least conspicuous location possible. c) Use Type N mortar with joint to match existing. d) Flashing to be copper installed in step pattern in the mortar joints of the masonry. 2) Reconstruction of Third Chimney a) Add additional bricks as needed to repair chimney. New bricks should match existing. b) Use Type N mortar with joint to match existing. c) Flashing to be copper installed in step pattern in the mortar joints of the masonry. 3) H DC 12-023 Kooting a) Remove multiple layers of asphalt roofing and/or additional layers of roofing materials. b) Repair decking with boards of same thickness, (plywood, chipboard, or 1 x boards for decking.) c) Reroof with architectural shingles. i) No changes will be made to the roof pitches, gables, or valleys. d) Install ridge vent as needed. 6ulA, Staff Signature I I - W- (12-1 Date of COC The original is printed on pale orange paper.