HomeMy WebLinkAboutPC Minutes 082125August 14, 2025
ITEM NO.: 20 FILE NO.: Z-10183
NAME: Orndorff #4 – PD-R
LOCATION: Immediately North of 1614 College Street
DEVELOPER:
Mike Orndorff
609 E. 16th Street
Little Rock, AR 72202
OWNER/AUTHORIZED AGENT:
GarNat Engineering (Agent)
PO Box 116
Bryant, AR 72015
SURVEYOR/ENGINEER:
GarNat Engineering
PO Box 116
Bryant, AR 72015
AREA: 0.17 acre NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
WARD: 1 PLANNING DISTRICT: 7 CENSUS TRACT: 46
CURRENT ZONING: R-4
A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT:
The applicant proposes to rezone the property from R-4 to PD-R. The subject
property is proposed to be replatted into two (2) separate lots. The developer will
build a two-story, attached single-family residence on each lot. The applicant will
not reside on the property and intends to market both residences for sale/lease in
the future.
B. EXISTING CONDITIONS:
Properties surrounding the site contain a mixture of zoning and uses in all
directions.
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
2
C. NEIGHBORHOOD NOTIFICATIONS:
All owners of property located within 300 feet of the site and all neighborhood
associations registered with the City of Little Rock were notified of the public
hearing.
D. ENGINEERING COMMENTS (PLANNING DIVISION):
1. Contact Planning and Development Dept., Engineering Division at 501-371-
4817 or at 501-918-5348 for inspections of any work in the public right-of-way
prior to placement of concrete or asphalt or for on-site clarification of
requirements prior to commencing work. Failure to do so can result in removal
of any improperly placed concrete or asphalt at the expense of the owner or
contractor.
2. Hauling of cut and/or fill material on or off project sites over municipal streets
require approval prior to a grading permit being issued. Contact Public Works
Traffic Engineering at 621 S. Broadway 501-379-1800 with any questions or
for more information.
3. Damage to public and private property due to hauling operations or operations
of construction related equipment from a construction site shall be repaired by
the responsible party prior to the issuance of a certificate of occupancy.
ENGINEERING COMMENTS (PUBLIC WORKS): No comments.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority: No comments.
Entergy: No comments received.
Summit Utilities: No comments.
AT & T: No comments received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in the time of request for water
service must be met.
Fire Department:
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
3
1. Full plan review.
F. BUILDING CODES/LANDSCAPE:
Building Codes:
As per 2021 Arkansas Fire Prevention Code Volume III R302.1(1) Single Family
Dwellings have the following requirements when dealing with Dwellings that are
closer than 7’ from the property line: If the soffit assembly extends inside of 5’ from
the property line, it must be constructed with fire treated materials. 5/8” Type “X”
Drywall, stucco, fire treated plywood or some other fire treated material on
underside of the soffit, fire treated fascia, elimination of soffit vents and gable vents
and crawl space vents on the affected portion of the wall. Note: Vents must be
relocated to ensure proper venting of the attic space.
Exceptions to this are to fire block this section of the exterior
wall from the top plate to the underside of the roof decking and
to fire caulk the blocking at all joints.
Townhouse Construction as per City of Littlerock
Townhouse Construction Requirements for the City of Little Rock, Arkansas
1. Framing Requirements:
a. All Townhomes shall be constructed with 2-Hour Fire Barrier Wall extending
through the roof and exterior walls or from the slab to the roof deck and front
walls with a 1-Hour extension on both sides of the wall for 48” on the walls
and 48” on the roof structure.
i. Doors must be fire rated if they are installed in wall.
ii. Overhead doors are not allowed to be installed in the fire rated wall
section listed above.
b. 2-Hour Fire Barrier Walls shall be independently constructed from all roof
and floor loads and must remain standing throughout a fire event. No
framing members are allowed to pass through the fire wall.
c. No power, gas, sewer, water, phone, security wiring, is allowed to be
installed in the 2-Hour fire barrier walls. No exceptions.
d. 2-Hour wall must extend out into the soffit to the back of the sub-fascia and
down to the bottom of the soffit.
e. Soffit Vents must be broken 48” from each side of the 2-hour fire barrier
wall.
f. Ridge Vents must be broken 48” from each side of the 2-hour fire barrier
wall.
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
4
2. Utilities:
g. Electrical
i. Separate Electrical Services are required. Each unit must have its
own separate electric meter and disconnecting means on the outside
of the unit.
ii. No electrical allowed in 2-hour fire barrier walls.
h. Water
i. A single water meter is allowed but water must enter each unit from
the outside with a water box / valve / union assembly before entering
the unit.
ii. Each unit requires its own water heater.
i. Sanitary Sewer
i. A single sanitary sewer service is allowed in units that are leased to
the occupants.
ii. Each unit individually owned must have its own sanitary sewer
service.
iii. Each unit individually owned where the yard is also owned must have
its own individual sanitary service on the property under ownership.
iv. Cleanouts required at the entry and exit from the building.
j. Natural Gas
i. A single natural gas meter is allowed in buildings that are leased to
the occupants or units where the building unit is owned but not the
yard.
ii. Gas Service must enter each unit from the outside and have a shutoff
on the outside of each unit.
iii. Each unit individually owned where the yard is also owned must have
its own natural gas service meter and service. Services must be
contained within each individual yard.
k. HVAC
i. All units must have their own designated HVAC System. No sharing
within the overall building or yard area.
NOTE: A site utility plan is required for all townhouse construction.
NOTE: Townhouse construction requires separately derived utility services for
Electrical, Water, Sanitary Sewer, Natural Gas and HVAC with all systems
contained in front / back yard building lines extending to a shared utility easement.
NOTE: If Townhouse Units cannot comply with utility requirements they are
classified as condominiums and are required to have fire sprinkler installations
throughout and are allowed to be separated by 1-hour fire walls.
Landscape: No comments received.
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
5
G. TRANSPORTATION/PLANNING:
Rock Region Metro: No comments received.
Planning Division:
Planning Division staff recommend taking vehicular access from the rear platted
alley to support walkability and avoid disruption to existing or future pedestrian
facilities. College Street is a proposed bike route on the Master Bike Plan and
reducing new curb cuts along this corridor will support active transportation in the
neighborhood and across the network.
Land Use Plan:
The request is in the I-30 Planning District, District 7 The development principles
in this district seek to stabilize existing residential areas. The Land Use Plan shows
Residential Medium Density (RM) use for the requested area. The Residential
Medium Density (RM) use category accommodates a broad range of housing
types including single family attached, single family detached, duplex, town homes,
multi-family and patio or garden homes. Any combination of these and possibly
other housing types may fall in this category provided that the density is between
six (6) and twelve (12) dwelling units per acre. The application is for a Planned
District-Residential (PD-R).
The area surrounding the site is designated for Residential Medium (RM) density
use and is characterized by mostly single-family, duplex, and triplex residential
structures as well as vacant residential lots.
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
6
This site is not located in an Overlay District.
Master Street Plan:
College Street is a Collector on the Master Street Plan. Collectors are designed to
connect traffic from Local Streets to Arterials or to activity centers, with the
secondary function of providing access to adjoining property. The standard Right
of way is 60’. Sidewalks are required on one side of Collectors. This street may
require dedication of right-of-way and may require street improvements.
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
7
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
8
Bicycle Plan:
College Street is on the Master Bike Plan as a Proposed Class III Bike Route.
Class III Bike Routes require no additional right-of-way, but either a sign or
pavement marking to identify and direct the route.
Historic Preservation Plan:
The application, as shown, should have no effect on identified historic resources.
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
9
H. ANALYSIS:
The applicant proposes to rezone the property from R-4 to PD-R. The subject
property is proposed to be replatted into two (2) separate lots. The developer will
build a two-story, attached single-family residence on each lot. The applicant will
not reside on the property and intends to market both residences for sale/lease in
the future.
Properties surrounding the site contain a mixture of zoning and uses in all
directions.
Lot 3R1 and Lot 3R2 are shown as 3,767 square feet and 3,765 square feet in
area, respectively. Both residences will contain a front patio facing College Street.
Both residences will be constructed using an asphalt shingle roof and vinyl siding.
Building setbacks for both residences are shown as twenty (20) feet from the front
property line, over twenty-five (25) feet from the rear property line, and eight (8)
feet from the side property lines.
Both structures shall not exceed thirty-five (35) feet in height.
Section 36-502 requires one (1) parking space for each dwelling unit. The site plan
shows a twenty (20) foot wide, shared access drive extending from the alley in the
rear of the property that will be utilized for off-street parking for both units. Staff
feels the parking is sufficient to serve the proposed use.
Any future signage must comply with Section 36-551 of the City’s Zoning
Ordinance (signs permitted in residential one – and two – family zones).
Site lighting must be low-level and directed away from adjacent properties.
August 14, 2025
ITEM NO.: 20 (Cont.) FILE NO.: Z-10183
10
To staff’s knowledge, there are no outstanding issues associated with this
application. Staff feels that the proposed development is an appropriate use for the
subject property. Staff feels the proposed development will not be out of character
with the development pattern within the area. Properties in the general area
contain a mixture of residential zoning and uses. Although there will be a minor
increase in traffic, staff feels the proposed development will not have an adverse
impact on the surrounding properties.
I. STAFF RECOMMENDATION:
Staff recommends approval of the requested PD-R rezoning, subject to
compliance with the comments and conditions outlined in paragraphs D, E and F,
and the staff analysis, of the agenda staff report.
PLANNING COMMISSION ACTION: (AUGUST 14, 2025)
The applicant was present. There were no persons registered in opposition. Staff
presented the item, and a recommendation of approval as outlined in the “staff
analysis” above. The item remained on the Consent Agenda for Approval. The vote
was (11) ayes, (0) nays and (0) absent. The motion passed. The application was
approved.