HomeMy WebLinkAboutS-1963 Preliminary Plat - REVISED 043024POINT OFCOMMENCEMENTPOINT OF BEGINNINGA=5.70
A
C
.
Q100=
1
9
.
4
4
C
F
S
A=3.13 AC.Q100=10.64 CFSA
=
2
.
2
9
A
C
.
Q
1
0
0
=
9
.
2
0
C
F
S VICINITY MAP25 RAHLING CIRCLE, SUITE A-2 LITTLE ROCK, ARKANSAS 72223PHONE: (501) 214-9141CIVIL ENGINEERING - CONSULTING SERVICES - LAND SURVEYINGJOE WHITE & ASSOCIATES, INC.PRELIMINARY PLATJOE WHITEF& ASSOCIATES,INC.#3871OET
A
IFITREC
NOITAZIROHTUAC
-ENGI
N
EERARKANSAS
CURVE DATA TABLEAN ADDITION TO THE CITY OF LITTLE ROCKBEING PART OF SECTION 1 AND 12, T-1-N, R-14-WPULASKI COUNTY, ARKANSASLOTS 501-510LOTS 601-608CERTIFICATE OF PRELIMINARY PLAT APPROVALCERTIFICATE OF RECORDINGCERTIFICATE OF OWNERGENERAL NOTES:CERTIFICATE OF PRELIMINARY ENGINEERING ACCURACYCERTIFICATE OF PRELIMINARY SURVEYING ACCURACYLEGAL DESCRIPTIONFLOOD INFORMATION:GENERAL NOTES:MAP COORDINATESBUILDING SETBACKS:
POINT OFCOMMENCEMENTPOINT OF BEGINNINGA=5.70
A
C
.
Q100=
1
9
.
4
4
C
F
S
A=3.13 AC.Q100=10.64 CFSA
=
2
.
2
9
A
C
.
Q
1
0
0
=
9
.
2
0
C
F
SSCS Sheet FlowL=100 FTS=6.00%EXISTING DRAINAGE AREA #1AREA: 3.09 AcreC: 0.50TOC: 17 MIN.SCS Sheet FlowL=100 FTS=18.00%EXISTING DRAINAGE BASIN #2AREA: 0.83 AcreC: 0.50TOC: 11 MIN.SCS Sheet FlowL=100 FTS=12.00%EXISTING DRAINAGE BASIN #3AREA: 2.30 AcreC: 0.50TOC: 15 MIN.SCS Sheet FlowL=100 FTS=18.00%EXISTING DRAINAGE BASIN #4AREA: 1.47 AcreC: 0.50TOC: 10 MIN.A=0.83 AC.Q100=3.37 CFSSCS Shallow Concentrated FlowL=414 FTS=7.62%SCS Shallow Concentrated FlowL=449 FTS=9.00%SCS Shallow Concentrated FlowL=202 FTS=18.00%SCS Shallow Concentrated FlowL=299 FTS=18.00%VICINITY MAP25 RAHLING CIRCLE, SUITE A-2 LITTLE ROCK, ARKANSAS 72223PHONE: (501) 214-9141CIVIL ENGINEERING - CONSULTING SERVICES - LAND SURVEYINGJOE WHITE & ASSOCIATES, INC.PRELIMINARY DRAINAGE ANALYSISJOE WHITEF& ASSOCIATES,INC.#3871OET
A
IFITREC
NOITAZIROHTUAC
-ENGI
N
EERARKANSAS
AN ADDITION TO THE CITY OF LITTLE ROCKBEING PART OF SECTION 1 AND 12, T-1-N, R-14-WPULASKI COUNTY, ARKANSASLOTS 501-510LOTS 601-608PROPOSED STORM DRAINAGETO CONVEY STORM WATERTO DETENTION FACILITY INCOPPER RUN, PHASE 6PROPOSED STORM DRAINAGETO CONVEY STORM WATERTO DETENTION FACILITY INCOPPER RUN, PHASE 6