Loading...
HomeMy WebLinkAboutS-0202-H Map 234686A 1 \ 14 / 15 '/ 13 19 i 20 24 23 i 21 I B9. Cot �I 12 j o I I g 10 e l lea> 8 LAKE 136 �2 132.00' i3-7.5V Imo_ Improvemen{5 139'I rnCOmA/E OO9,50 -7 3vW 34.32 3o.0 / = 1 -� to b1 6 c�o 4.15' 6 74 �1 w Im 69 N, 68 75 NI ir U I I30.00 I �// % CiO- J i 22 26 I THIS PHASE ,! Q� C/ F� dq . ...7 .. V 10kaw"NA 82 83 8I 4 m 65 7 g2. 81 P ASE I 39 39a 46 o�FFq L A K E 48 S45 79 53 1 52 1 51 i 50 m 49 64 54 4 7 o ICo3.38' O. 180,42' 1524�1 s OD' �S 0 55 Igo._ 8 PHA E III 63 � 391 � 5 6 57 I 58 59 1 60 1 61 62 8 0 30, CD 9, �°�� 42 7 19041 C*A 41 N � � 9�• �TyFq+k sr 9e,5a 38 e,92 av�; /(Z - 29 ' Aj 30 I 3I 1 32 1 33 1 34 i 35 1 36 8 37 ��� - \\ I 222.09' 1-73.1Co' I I-70,02' 0 &� 8� HICKORY CREEK SUBDIVISION LITTLE ROCK, ARKANSAS 1 THIS PROJECT ne �R �Ir ' 4 r wa • M " VICINITY MAP CERTIFICATE OF PRELIMINARY SURVEYING ACCURACY I, Ronnie D. Hall, hereby certify that this plat correctly represents a boundary survey made by me and all monuments shown hereon actually exist and their location, size, type and material are correctly shown. Pet- 2-1, 126� �? 'DD" Date of Execution Ronnie D. Hall Registered Land Surveyor No. 865, AR. CERTIFICATE OF PRELIMINARY ENGINEERING ACCURACY I, Steven L. Haynes, hereby certify that this plat correctly represents a plat made by me, and that engineering requirements of the Little Rock Subdivision Rules and Regulations have been complied with. { Date of Execution Steven L. Haynes Registered Engineer, No. 5459, AR. CERTIFICATE OF PRELIMINARY PLAT APPROVAL All requirements of the Little Rock Subdivision Rules and Regulations relative to the preparation and submittal of a Preliminary Plat having been fulfilled, approval of this plat is hereby granted, subject to further provisions of said Rules and Regulations. This Certificate shall expire Date of Execution L.R. Planning Commission Note: This amended preliminary plat only changes the sequence of phasing and requests the deferral of Henson Road Construction to be consulted with the City Bond Issue Project for Henson Road, Phase IV is changed to Phase II, and Phase II and Phase III are reversed to show Phase III. 4