HomeMy WebLinkAboutAS-0202-H Staff AnalysisJanuary 26, 1988 SUBDIVISIONS Item No. 6 NAME: Hickory Creek Subdivision Amended Preliminary Plat, Phase II LOCATION: Hickory Creek Drive at Hinson Road DEVELOPER: ENGINEER: Clint Boshears Garver and Garver c/o Garver and Garver llth and Battery Streets Little Rock, AR Little Rock, AR 72203 Phone: 376-3633 AREA: NO. OF LOTS: 9 FT. NEW STREET: 500 ZONING: "R-2" PROPOSED USES: Single Family 1. -Sequence of phasing different from preliminary plat. 2. Deferral of Hinson Road construction to be completed for City Bond Issue project. A. Pro osal/Re nest: 1. To amend the preliminary plat for Hickory Creek to allow a plat of nine lots on the south side of the lake before the improvements before the remainder of Hinson Road is completed. 2. Construction of improvements with the City Bond Issue project. 3. Change in phasing of plat. B. Existing Conditions: This site is located in an area that is developed for single family. New residential development is still occurring throughout the area. January 26, 1988 SUBDIVISIONS Item No. 6 - Continued C. Issues/Discussions/Le al/Technical/Desi n: See Item A. D. Engineering Comments: 1. Sidewalks on Hinson. 2. Extension of Hinson Road to be constructed of funds provided in -lieu of construction. Developers are required to complete construction or in -lieu until any City street project has been contracted between the City and the contractor. See CLR Boundary Street Ordinance for clarification. E. Staff Recommendation: Denial of the request. Staff feels that the applicant should follow the usual requirements for construction of the streets. F. Subdivision Committee Review: The Applicant clarified/revised his request: (1) Allow development in platting of Lots 1-6 and 85-87 as the next phase (Phase II) with the construction of the remaining 200 feet of Hinson Road being deferred until Phase III is developed. (2) Waiver of sidewalks along Hinson. (3) An alternate plan (Lots 1-3) be platted as a single lot with the cul-de-sac, Hickory Creek Cove East, being eliminated and included in the revised Lot 1 as shown on the alternate plan; also allow the immediate platting of the revised Lot 1 without any additional improvements being required. The staff spoke against any change in the requirements for construction of the street. The Applicant, Mr. Clint Boshears, then explained that it was a "matter of economics" that forced him to develop Phase IV instead of Phase II. He identified the request as a "phasing conflict" which he would resolve by building the streets when the last phase of the project is built. January 26, 1988 SUBDIVISIONS Item No. 6 - Continued He reassured the Committee that he was not trying to get out of the requirements. PLANNING COMMISSION ACTION: Mr. Clint Boshears and Mr. Ronnie Hall, the engineer, were present in favor of the application. They agreed to replat Lots 1, 2, and 3 into one lot. Engineering gave its approval to the alternate plan. A motion for approval was made and passed, subject to: (1) right-of-way dedication, (2) deferral of in -lieu contribution until the City builds a portion of Hinson Road or Phase III whichever comes first. The motion was made and passed by a vote of 10 ayes, 0 noes, and 1 absent.