Loading...
HomeMy WebLinkAboutS-0202-G Staff AnalysisY January 26, 1988 SUBDIVISIONS Item No. 6 __. NAME: LOCAT ON : DEVELOPER: Clint Boshears C/o Garver and Garver Little Rock, AR Hickory Creek subdivision Amended Preliminary Platr Phase II Hickory Creek Drive at Hinson i�o ad ImoENG' : Garver and GarverStreets llth and Battery Streets Little Rock, AR 72203 Phone: 376-3633 FTNEW STREET: 500 AREA: N0. OF LOTS: 9 . ZONING: R-2 PROPOSED USES: Single Family liminary plat. 1. Sequence of phasing different from pre eferral of Hinson Road construction to be completed for 2• D City Bond Issue project. A. Proposal/R�: 1. To amend the preliminary plat for Hickory Creek to allow a plat of nine lotsonforeuthesremaindere of eof lake before the improveme Hinson Road is completed. 2. Construction of improvements with the City Bond Issue project. 3. Change in phasing of plat. S. B. Existin Conditionloped for This site is locateds still rdevelopment iin an area that is deve single family. New residential occurring throughout the area. E 4 January 26, 1988 SUBDIVISIONS Item No. 6 - Continued C. Issues/Discussions/Le al/Technical/Desi n: See Item A. D. En ineerin Comments: 1. Sidewalks on Hinson. 2. Extension of Hinson Road to be constructed of funds provided in -lieu of construction. Developers are required to complete construction or in -lieu until any City street project has been contracted between the City and the contractor. See CLR Boundary Street Ordinance for clarification. E. Staff Recommendation: Denial of the request. Staff feels that the applicant should follow the usual requirements for construction of the streets. F. Subdivision Committee Review: The Applicant clarified/revised his request: (1) Allow development in platting of Lots 1-6 and 85-87 as the next phase (Phase II) with the construction of the remaining 200 feet of Hinson Road being deferred until Phase III is developed. (2) Waiver of sidewalks along Hinson. (3) An alternate plan (Lots 1-3) be platted as a single lot with the cul-de-sac, Hickory Creek Cove East, being eliminated and included in the revised Lot 1 asashown on the alternate plan; also allow the immediate platting of the revised Lot 1 without any additional improvements being required. The staff spoke against any change in the requirements for construction of the street. The Applicant, Mr. Clint Boshears, then explained that it was a "matter of economics" that forced him to develop Phase IV instead of Phase II. He identified the request as a 11phasing conflict" which he would resolve by building the streets when the last phase of the project is built. January 26, 1988 SUBDIVISIONS Item No. 6 - Continued He reassured the Committee that he was not trying to get out of the requirements. PLANNING COMMISSION ACTION: Mr. Clint Boshears and Mr. Ronnie Hall, the engineer, were present in favor of the application. They agreed to replat Lots 1, 2, and 3 into one lot. Engineering gave its approval to the alternate plan. A motion for approval was made and passed, subject to: (1) right-of-way dedication, (2) deferral of in -lieu contribution until the City builds a portion of Hinson Road or Phase III whichever comes first. The motion was made and passed by a vote of 10 ayes, 0 noes, and 1 absent. 4#